INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
COMPANY PROFILE
NAME : PT. GARUDAFOOD PUTRA PUTRI JAYA
LOCATION : PATI, CENTRAL JAVA
PRODUK : ROASTED PEANUTS
ESTABLISH : 1979
PATI
PLANT LAYOUT
CFT PROFILE
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
1. INDENTIFY PROJECT THEME
1.1 Define Project Theme
Based on company’s Strategy Map, one of direction from President Letter is to increase
productivity. Therefore our CFT focus on the increasing Productivity.
CFT TARGET
TITLE :
Based on data and graph, CFT took the title :
“Increase Productivity of Roasted Peanut by 35%
(unit/person) from real achievement 2014”
CFT Target (500 unit/person) based on average achievement in 2014, that calculate from total unit of finish
goods devided by total finish goods labor (sorting machine up to packaging process, include supporting).
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
1.2 Project Scope and Schedule
1.2.1 Project Scope
Information :
CFT Project
covers from
cooking up to
packaging.
INFORMATION : choosen
Not choosen
BEFORE AFTER
Total labor of soil disposal is 14 person/day. Total labor of soil disposal is 4 person/day
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
BEFORE AFTER
Drying 1
conveyor
Drying 2 4
Process that can be
INFORMATION : eliminated after
improvement
filling the drying
seasoning process using
conveyor connected
between machine. Time to
filling drying process was filling process takes about
manualy. 31 minutes
Total labor of drying seasoning process is 4 person/day. Total labor of drying seasoning process is 0 person/day.
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
WHAT
NO CFT ISSUE HOW
Before After
2 Design pre-cleaning before the Modification pre cleaning machine by Products are not standard (peanut Gravity Separator proses produces
gravity separator process cannot adding a peanuts roots cutter system still have roots) the manual re- standard products (not peanuts root)
cut the peanut roots optimally Where : process should be done again because peanuts root was cut
Gravity Separator Process maximally
When : August 2015
BEFORE AFTER
Re-process
WHAT
NO CFT ISSUE HOW
Before After
3 Not balancing Interlock system between need labor to monitor the filing hopper process Installed interlock systems that are connected between
capacity conveyor output drying with gravity separator the input hopper gravity separator with the conveyor
between the hopper gravity separator drying, so the process will stop automatically when the
output of the process in order to balance hopper is full
drying process Where :Gravity Separator
vs hopper Process Total labor to monitor filling hoper process 3 Total labor to monitor filling hoper process 0 person/day
Gravity When : August 2015 person/day
Separator SAVING : Rp. 5,368,350
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
BEFORE AFTER
BEFORE AFTER
Hopper Hopper
There is gap between unloading drying To increase hopper capacity, it’s modified.
with gravity separator capacity about So the hopper can store the product (2.3
Hopper dimension 0.7 ton/hours ton) when unloading drying process
Hopper dimension
WHAT
NO CFT ISSUE HOW
Before After
4 Layout output Relayout gravity Layout output GS process is divided into several The process of storing output machine into 2 locations by
product from separator process by points / locations (4 locations) integrating some multiple conveyor of multiple line
several lines integrating conveyor machines
machine are not output from several Total labor of Total labor of
integrated line machines gravity
Where : gravity separator
separator
Gravity Separator process is 26
Process process is 50
When : June 2015 person/day/2
person/day/2
machine GS
machine GS
INFORMATION : INFORMATION :
4 output locations 2 output locations
STEP of RELAYOUT goal : reduce output location (to minimize the labors)
Reduce 1st grd output Position before
2nd grd
location : Make 3rd output Reduce 2nd grd
output
- Reverse the direction closer 2nd output output location :
of 2 conveyor output - Move gravity Add 1 conveyor to
1st grade. separator of integrating 2nd
reprocess to Conveyor
- Add 1 conveyor in output, from 2
main gravity output location integrating
front of 2 conveyor
separator become 1 location
output 1st grade due
to integrating 2
1st grd
location become 1 Step 2
Step 1 output Step 3
location
Position after
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
WHAT
NO CFT ISSUE HOW
Before After
5 Handling Replacement The use of transport equipment (handpallet) using The use of transport equipment (handpallet) using 3 men labor
products is labor for heavy 2 woman labors (2 labor per handpallet) for 2 Hand pallet (1.5 labor per handpallet)
done by job for Men
women labor
workers Where : Total labor needed
Sorting for feeding
Machine machine is 63
Process,
Roasting Total labor of people (Sorting
Process, dan handling feeding Machine -
Packaging machine is 78 Packaging)
process
people (Sorting
When : May
2015 machine-
packaging) SAVING : Rp. 26,841,750
6 Product is Review Product specification is too bloated among similar Decrease bloated of the product based on the product type and the
very product products that are not injected by nitrogen. Bloated size, because the bloated the higher oxygen content and will shorten
bloated specifications standart is 2,8-3,0 cm shef life. Bloated standart is 2,0-2,5 cm
and there with
is non benchmark Total labor in packaging process is 9 persons/6 Total labor is 8 persons/6 machine (ratio 1.3 person/machine)
value similar machines (ratio of 1.5 people per machine) Total Labor packaging is 72 person/day
added in products Total Labor packaging is 81 person/day
packaging Where :
process Packaging
process SAVING : Rp 16,105,050
When : Sept
2015
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
BEFORE AFTER
BEFORE AFTER
Duplication Reports Duplication Reports
There is 34 - There is 6 reports
types of report (poin 1-6) that
and integrated become
unintegrated one format (using
formats. So it pivot table). So
takes a long administrative staff
time to input just input in one
data by format.
administrative
staff.
- poin 9, confirmation SAP line 2-3
doing per day. So it can reduce report
from 3 become 1 report
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
BEFORE AFTER
Market 64%
Day off only
Iedul Fitri
QCDSMP IMPACT
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
CFT Benefit
FINANCE VALIDATION
b. Standardization of Process
Work Instruction (WI) Disposal of Soil
No WI-C4.2.0.01-01-05
Content- Disposal soil using conveyorization and dump truck
Work Instruction (WI) Gravity Separator Process
No WI-C4 2 0 01-01-30
Content Point 4c (Gravity Separator Process)
- Eliminate 2nd grade mixing process manually
Work Instruction (WI) Seasoning Process
No WI-C4.2.0.01-01-38
Content- Filling drying seasoning machine using conveyor
Bloated packaging standard
No ST-S1.7.2.00-01-66
Content Bloated Standard GF2 item from 2,8 -3,3 cm to 2,2-2,7 cm
Note : New/revised standard has been socialized (see appendix for attendance list)
DUMP TRUCK
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
2. Conveyor of Disposal Soil
Bar
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016
Bar
7. Packaging table
TEMU KARYA MUTU & PRODUKTIVITAS NASIONAL XX
dan
INTERNATIONAL QUALITY & PRODUCTIVITY CONVENTION 2016