T
EE
CONTENTS D.P.W.H.
SH
OFFICE OF THE BUILDING OFFICIAL
TABLE OF CONTENTS
1 PERSPECTIVE
SITE DEVELOPMENT PLAN
A
RIGHT-SIDE VIEW LAND USE AND ZONING
1 2 INTERIOR VIEW
REAR VIEW
A
23 LEFT-SIDE VIEW
STRUCTURAL
S LINE AND GRADE
1 4 GROUND FLOOR PLAN
S
25
SECOND FLOOR PLAN
S
36
ROOF LAYOUT
S WEST ELEVATION
PERSPECTIVE 58 EAST ELEVATION
S a-a ELEVATION
69 b-b ELEVATION
S STRUCTURAL
N LOT BEARINGS 7 10 2ND FLR. FRAMING PLAN
1 2 N 47 ° 01 ' W 13.71 M
2 3 N 33 ° 06 ' E 12.19 M S FOUNDATION LAYOUT PLAN
W E 3 4 S 42 ° 01 ' E 15.79 M 8 11 WALL FOOTING DESIGN
4 1 S 42 ° 59 ' W 12.00 M
S ELECTRICAL
THIS SITE PLANS
E GROUND & SECOND FLOOR SANITARY
1 12
3
LIGHTING LAYOUT
3 2
EXISTING STRUCTURE
4
POWER LAYOUT
4
E SCHED. OF LOADS & COMP.
2
EXISTING STRUCTURE
3 14
D.
RISER DIAGRAM
B
SU
4 15
AR
1 GENERAL NOTES
V
NA
PLUMBING
PLANS
P GROUND & SECOND FLOOR
1 16 PLUMBING PLANS
P GENERAL NOTES
3 18 LEGEND
18-23
STRUCTURAL SCHEDS. &
9-13
OTHER PLANS
1.35
2B4
OPENING
1.60
2B2
1.3500
RC SLAB
S-1 1.3500
2B6
2B5
2B4
0.9 2x6 DOUBLE C PURLINS RECTANGULAR BEAM
2B1
SPACED @ c/c AS SHOWN
OS-1
2B1 2B1
OS-1 OS-2 RC SLAB
WF
WF
C1F1 FTB C1F2 FTB C1F1
FTB
FTB
FTB
C1F3 FTB C3F4 FTB C1F3
FTB
FTB
FTB
PREPARED BY:
ST
MASTER PLUMBER
ENGR. RICHARD D. FALLEGA
SIN
K
TIN:
DATE:
M
PLACE:
DS
DS
PROJECT TITLE:
PLAN OF SEPTIC TANK COVER
3204
703 703
700
703
1000
176
SAND
2560
GRAVEL
BOULDERS
SLOPE 2% SLOPE 2%
SHEET CONTENTS:
AS SHOWN
EARTH FILL
P
SHEET NO.
2 17
RB5
RB6
RB4
RB2 RB2
RB6
RB4
RB5
RB1 RB1
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
∅ ∅
C1 - 250mm X 250mm C2 - 250mm X 250mm C3 - 250mm X 250mm C4 - 250mm X 250mm C5 - 250mm X 250mm
2ND FLR. TO 4TH. FLR.
4-12mmØ VERT. BARS 8-16mmØ VERT. BARS 4-12mmØ VERT. BARS 8-16mmØ VERT. BARS 4-12mmØ VERT. BARS
USE 1 SET OF 10mmØ BARS USE 1 SET OF 10mmØ BARS USE 1 SET OF 10mmØ BARS USE 1 SET OF 10mmØ BARS USE 1 SET OF 10mmØ BARS
SPACED @ 1@0.025, 5@0.05 SPACED @ 1@0.025, 5@0.05 SPACED @ 1@0.025, 5@0.05 SPACED @ 1@0.025, 5@0.05 SPACED @ 1@0.025, 5@0.05
REST @ 0.10 M. O.C. REST @ 0.10 M. O.C. REST @ 0.10 M. O.C. REST @ 0.10 M. O.C. REST @ 0.10 M. O.C.
FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT.
C1 - 300mm X 300mm C2 - 300mm X 300mm C3 - 300mm X 300mm C4 - 300mm X 300mm C5 - 300mm X 300mm
FTG. TO 2ND. FLR.
4-16mmØ VERT. BARS 8-20mmØ VERT. BARS 8-16mmØ VERT. BARS 12-25mmØ VERT. BARS 8-16mmØ VERT. BARS
USE 1 SET OF 10mmØ BARS USE 3 SETS OF 10mmØ BARS USE 3 SETS OF 10mmØ BARS USE 3 SETS OF 10mmØ BARS USE 3 SETS OF 10mmØ BARS
SPACED @ 1@0.030, 5@0.06 SPACED @ 1@0.03, 5@0.06 SPACED @ 1@0.03, 5@0.06 SPACED @ 1@0.03, 5@0.06 SPACED @ 1@0.03, 5@0.06
REST @ 0.12 M. O.C. REST @ 0.12 M. O.C. REST @ 0.12 M. O.C. REST @ 0.12 M. O.C. REST @ 0.12 M. O.C.
FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT. FROM SLAB TO MIDHEIGHT.
F1 F2 F3 F4
PREPARED BY: PROJECT TITLE: OWNER SHEET CONTENTS: SHEET NO.
PRC NO: 109386
PTR NO: 5005118
ENGR. RICHARD D. FALLEGA
DATE: MRS. CHING ATAZIN AS SHOWN S
CIVIL ENGINEER
PLACE: 12 22
TIN:
TOP BOTTOM TOP TOP BOTTOM TOP
BAR SIZE
BARS BARS BARS BARS BARS BARS