T D S Description T D
Top slab
4.8
1 2.4
0.15
1.73 M3
3. Formwork
2 5.6 a. To Base Slab
0.5 5.60 M2
2 3.2
0.5 3.20 M2
2 14.4 Side Shear walls
3.4 97.92 M2
2 12.6
3.4 85.68 M2
1 4.3 Top slab
1.9 8.17 M2
1 14.4 side to top slab
0.18 2.59 M2
185.6 185.6
294.4 294.4
799.7 799.68
408.0 408
576.0 576
288.0 288
139.4 139.4
104.0 104
2586.4624
Bill of Quantity for Septic Tank
2. Concrete Work
Supply and pouring of 100mm thick lean concrete in concrete class
2.1 C-5 under all switchyard foundation with minimum cement content
of 180 kg/m3. m3 19.7
2.3
Supply and fix Zigba sawn or equivalent form work for concrete m2 203.16
2.4
Steel Reinforcement according to structural drawing, price includes
cutting, bending, placing in position and tying with wires.
GRAND TOTAL
`
Rate Amount
110.00 8,572.64
395.00 13,377.07
101.00 4,450.78
26,400.49
137.00 2,701.64
137.00 3,294.58
290.00 58,916.98
0.00
36.00 23,313.72
36.00 17,192.39
36.00 52,606.54
158,025.84
184,426.33