SLOOF BETON TL. 1:2:3 UK. 25/40 CM
URUGAN TANAH KEMBALI
LANTAI KERJA BETON TUMBUK 1:3:5
URUGAN PASIR BAWAH PONDASI

D 12 D 16 mm

2.200

0,55
0.400

0.070
0.100 0.550
0,55 D 10 mm - 150 mm
1.500
1.700

DETAIL POTONGAN A - A DETAIL POTONGAN D - D

B
D 16 - 150mm
D 16 - 150 mm
0.450 D 16 - 150 mm
A A D 16 - 150 mm

1.500 0.600

0.450

0.500 0.500 0.500

1.500

B PENGADAAN DAN PEMASANGAN


UNIT STAGING HGF
DI PG. KREBET BARU II - MALANG

PT. TRIWIJAYA GEMALESTARI