PART 1 – GENERAL
1.1 SUMMARY
A. This Section includes general requirements and procedures for compliance with certain Estidama
Pearl Building Rating System (PBRS) credits needed for the Project to obtain the targeted PBRS
Construction Rating.
4. Contractor shall participate in achieving credits for the Project Construction Rating. Refer to
Part 3 for the project specific PBRS requirements.
1.1 SUMMARY
1.2 DEFINITIONS
1.3 SELECT PBRS GLOSSARY
1.4 ESTIDAMA TEAM
1.5 ACTION SUBMITTALS
C. The project has acquired a Pearl Design Rating of 2 Pearls and is targeting a Pearl Construction
Rating of 2 Pearls. Contractor provided documentation will be collected throughout the
construction period and will be assembled along with additional documents by others from PBRS
Construction Rating and submitted after the Taking-Over Certification date.
D. Contractor role and responsibilities for documentation of construction is critical to achieving a Pearl
Construction. PBRS credits needed to obtain the targeted PBRS certification are dependent on the
Consultant’s design and other aspects of the Project that are not part of the Work of the Contract.
Therefore, achieving the targeted Pearl Construction Rating is shared endeavor with responsibilities
respective of each party’s role.
E. Credits needed to obtain PBRS Construction Rating are dependent on material selections and may
not be specifically identified as PBRS requirements. Compliance with requirements needed to obtain
PBRS credits may be used as one criterion to evaluate Substitution Requests.
Page 1
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
F. PBRS Certification is provided by the UPC following their independent review of Project
documentation from both the design and construction phases and other aspects that are not part of
the Work. Therefore, no single party can be held wholly responsible for acquisition of PBRS
certification. The Contractor is an integral member of the PBRS team with critical contributions and
performance requirements.
1.2 DEFINITIONS
A. PBRS : Refer to www.estidama.org for the latest version of the Pearl Building Rating System (PBRS).
In addition to the rating system itself, refer to “Updates” / “Information Bulletins” for the latest
published directives from UPC which may pertain to the project.
B. UPC : Urban Planning Council of Abu Dhabi created and administers the PBRS through their Pearl
Assessor designated to each project.
1. For some projects the UPC may delegate administration of PBRS to Abu Dhabi Municipality.
A. Refer to www.estidama.org for full glossary of terms and other PBRS references.
American Society of The international organization that establishes standards for the uniform
Heating, Refrigerating testing and rating of heating, ventilation, air conditioning and refrigeration
and Air Conditioning equipment. It also conducts related research, disseminates publications
Engineers (ASHRAE) and provides continuing education to its members.
Baseline building The annual energy consumption of a baseline building design as defined in
performance ANSI/ASHRAE/IESNA Standard 90.1-2007
Coefficient of
The ratio of the net cooling energy exported from the system to the total
performance (COP)
electric power used by the system.
- cooling
A simple document providing the building owner/manager with easily
understood information on how the building should be operated,
Building Log Book (BLB)
maintained and serviced. It also allows ongoing building performance and
major alterations to be recorded.
Chromated Copper
Chemical wood preservative containing chromium, copper and arsenic.
Arsenate (CCA)
The process of ensuring that newly constructed / installed systems (HVAC,
Commissioning plumbing, electrical, fire/life safety,, building security etc) operate as
designed and meet Project performance requirements.
Construction waste The unwanted material generated during construction, including
demolition waste.
Independent
An individual with responsibility for co-coordinating and monitoring the
Commissioning
commissioning process.
Authority
A respiratory disease caused by inhaling Legionella bacteria either in the
Legionnaires disease form of contaminated water droplets (aerosols) or in droplet nuclei (after
water has evaporated). Fatal in approximately 12% of reported cases.
The relative amount of degradation to the ozone layer a chemical
Ozone Depletion
compound can cause. The ODP of CFC-11 is 1 and the ODPs of other
Potential (ODP)
compounds are calculated relative to this.
The plan which has been designed to help Abu Dhabi filter all planning
decisions through environmental, social and economic development
Plan 2030
criteria. The full title is the Abu Dhabi 2030 Urban Structure Framework
Plan. For more information, go to www.upc.gov.ae
Solar Reflectance Index The measure of a material’s ability to reflect solar heat on a scale of 0 to
Page 2
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
(SRI) 100. A standard black material has an SRI of 0 and a standard white
material has an SRI of 100.
1. Individuals, each having authority to act on behalf of the entity he or she represents, explicitly
organized to implement the Pearl Building Rating System for Estidama process through
coordinated actions. The Estidama team shall consist of, but not be limited to, representatives of
Contractor, including Project superintendent and subcontractors, installers, suppliers, and
specialist deemed appropriate by the PQP.
1. PQP: The Pearl Qualified Professional is a designated person, company or entity that plans,
schedules and coordinates the Estidama team to implement the Estidama certification process.
Employer will engage the PQP under a separate contract.
2. Representatives of the facility user and operation and maintenance personnel.
3. Engineer and engineering design professionals.
4. Independent Commissioning Authority.
5. Qualified Environmental Consultant’s Professional
A. General
Refer to Part 3 for submittal requirements for targeted project specific credits being pursued.
C. PBRS submittals are in addition to other submittals. If submitted item is identical to that submitted
to comply with other construction requirements, submit duplicate copies as a separate submittal to
verify compliance with indicated PBRS requirements.
Submit electronic PDF files of PBRS submittals, unless otherwise directed by PQP.
PART 2 – PRODUCTS
2.1 GENERAL
B. In case there is any discrepancy, contractor has to raise it to the Consultant and project PQP for
final decision.
C. This project is classified under Estidama 2 Pearls Building Rating System; Contractor shall
achieve the required credits to obtain Estidama 2 Pearls Building Rating System.
A. Contractor has to visit the site prior to submit his final price, check the site condition, and take
into consideration all requirements which needed to start the work until handing over the
project.
Also during the construction; where natural significant and valuable assets were presented in NS-
R1 credit and identified in Environmental Impact Assessment (EIA), the Natural Systems
Page 3
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
1. Evidence that features of ecological value, as identified in NS-R1 credit are adequately
protected during construction or that the impacts are either mitigated or compensated. for
example, a construction management plan and dated photographs of successfully protected
areas/features;(If applicable)
2. Updated development map delineating the built limits of all proposed development and
disturbance, setback zones, and buffer areas;
3. Supporting calculations summarizing final total land area and protected areas; and
Confirmation of the appointment of a management and maintenance organization (with a
contract running for at least 5 years), if management not to be undertaken by the local
municipality. The confirmation must contain details of individuals responsible and their
duties in line with the strategy.
B. All shading elements must have a minimum solar reflectance index (SRI) of 29.
C. All residential units must be sealed with impermeable deck to deck partitions along the whole
perimeter of the unit. All penetrations in walls, floors and ceilings must be sealed. All internal
doors leading from residential units to common areas or between residential units must be
weather stripped.
A. Roof construction Average U-value must not exceed than 0.200 W/m2K
B. Above-Grade Wall Construction Average U-Value must not exceed than 0.261 W/ m2K
C. Slab on Grade Floor of F Factor must not exceed than 1.264 w/mk
D. Vertical Glazing U-Value including the frame must not exceed than 1.88 W/ m2K
E. Vertical Glazing SHGC must not exceed than 0.22
Require the contractor to achieve the area weighted average U-values, and to demonstrate compliance
with these Area Weighted Average U-Values (through calculations and drawings) prior to the
procurement of the envelope components.
Note: If there is revision in the elevation from the design stage, kindly consult construction PQP for the
average U-value for wall.
A. Water fixture must meet Estidama PW-R1 & PW-1 credit requirements.
B. Exterior water meter has to comply with Estidama 2 Pearls and shall be as per PW-R2 credit
requirements.
C. The results of commissioning systems shall be reviewed and approved by Independent
Commissioning Agent.
D. Legionella Management Plan must be applied for all water based systems.
E. The contractor shall confirm the claimed Efficiency Factor value, prior to procurement, with
supporting third-party test certificate.
F. The selected fixtures shall meet or exceed flow rates/volumes based on the following:
Page 4
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Contractor to confirm the above mentioned requirements in form of test sheet, certification and
material submittal from the supplier before procuring the material.
A. The Energy meter has to comply with Estidama 2 Pearls and shall be as per RE-R2 credit
requirement.
B. The results of commissioning systems shall be reviewed and approved by Independent
Commissioning Agent.
C. Lighting power densities shall comply with building Estidama Performance Pathway and
ASHARE 90.1-2007 space by space method as indicated below:
Page 5
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Building-Walkway 3m Wide
1.94 1.8
or Greater
Building Entrances and
88.6 10
Exits/Main Entries
Building Entrances and
59.1 2.6
Exits/Other Entries
Contractor shall confirm compliance with above mentioned LPD before procurement of light
fittings.
Electrical water heater Efficiency Factor shall be greater than 0.94 EF and to be demonstrated
during the commissioning.
The contractor shall confirm the claimed Efficiency Factor value, prior to procurement, with
supporting third-party test certificate.
A. The design value of 3.9 COP to be achieved and to be demonstrated during the commissioning.
B. Refrigerant & gaseous suppression system shall have Ozone Depletion Potential of zero.
C. The results of commissioning systems shall be reviewed and approved by Independent
Commissioning Agent.
D. (CO2) monitoring and alert systems shall be as per LBi-1 credit requirement.
E. Air ventilation must achieved of 15% above the outdoor air ventilation rates required by
ASHRAE 62.1:2007 and has to comply with LBi-1 credit requirement.
F. The distance between air intake of fresh air and exhaust must be more than the values TABLE 5-1
“Air Intake Minimum Separation Distance” of ASHRAE 62.1:2007; (more than 5m.)
G. Local supply & extract ventilation units such as window/wall/roof units serving single area (e.g.
toilet extract) design value achieved 0.40 W/l/s.
H. Fan coil units (weighted average) design value achieved 0.58 W/l/s.
Any additional fan (FAHU, AHU, Exhaust Fan shall comply with ASHRAE 90.1-2007 requirement)
The minimum targeted diversion rate for Operational Waste is 70% by weight or volume of the
total operational waste generated at full occupancy.
Page 6
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
PART 3 – EXECUTION
3.1 GENERAL
A. PQP shall convene an Estidama Workshop including representatives of the Employer, PM, CM/CS,
ICA, Employer’s FM and Contractor for the purpose of establishing a Construction Stage Estidama
Plan.
B. Execute the Work in compliance with all applicable PBRS requirements and all other Project
requirements.
A. Provide PBRS Construction Rating submittals for the following required PBRS credits and as
directed by PQP.
Where natural significant and valuable assets were presented in NS-R1 credit the Natural
Systems Protection, Mitigation or Compensation plan and supporting studies must be
prepared by a suitably qualified ecological professional.
Page 7
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Page 8
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
a. Third party certificate confirming the U-value or K-value for each opaque envelope
component (block, insulation, rockwool etc.)
b. Third party certificate confirming the average U-value of glazing system and
windows besides the SHGC of the glass.
c. Third party certificate confirming the U-value or K-value of insulation of the roof.
d. Where cover is provided by structures such as canopies or other architectural
elements, an evidence showing that the outer surface of the shading element have a
minimum Solar Reflectance Index (SRI) of 29.
e. LUX calculation of the lighting fittings showing the light power density (LPD) space
by space.
f. Data sheet or evidence of EWH efficiency stating compliance.
g. The supplier of the A/C must provide test certificate for COP at AHRI conditions at
full load prior to procurement and confirm this to the UPC.
A. Provide PBRS Construction Rating Submittals for credits indicated to receive points in the
following Project Scorecard. Contractor shall provide requirements of credits in the “Yes” and
“Maybe” columns.
Page 9
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
B. Contractor is required to provide all submittals as indicated in the full text of Estidama and as
directed by Project PQP. Credit requirements include, but are not limited to the following:
i. Updated narrative describing how the project meets the Credit Requirements;
ii. Images of the digital interface screens representative of a user experience; and
Iii. Typical as-built drawings indicating the functionality and location of all smart
meters/dashboard or other building integrated internal communications in each
tenancy.
1. Indicate carpet performance meets or exceeds the Carpet and Rug Institute
Green Label or Green Label Plus Program or Green Guard Indoor Air Quality
Certification program for Carpets.
2. Indicate whether all hard flooring systems and finishes have achieved
FloorScore Certification or Greenguard Indoor Air Quality Certification for low
emitting products.
3. Indicate whether ALL wood flooring products exceed class E1 for formaldehyde
content and do not exceed 5 parts per million (ppm) for Pentachlorophenol
Page 10
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
c. Provide all associated Material Safety Data Sheets and Technical Data Sheets for
these products to demonstrate compliance with the credit requirements.
Page 11
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Page 12
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
23. RE-7 Global Warming Impacts of Refrigerants & Fire Suppression Systems
a. Provide Manufacturer’s information for all installed refrigerants confirming the
GWP of each refrigerant.
b. Provide Manufacturer’s information for installed leak detection system.
c. Provide Manufacturer’s information detailing the type and operation of the
automatic refrigerant pump down system.
d. Provide Manufacturer’s information confirming the GWP of all installed gaseous fire
suppression systems.
Product Data for selection of Non-Polluting Materials that do not have long-term
negative impacts on human health or pollute natural systems. Demonstrate that the
project has achieved the following:
a. Zero ODP, Low GWP Insulation All thermal insulation materials used in the project
shall have an Ozone Depleting Potential of zero (ODP = 0) and a low Global Warming
Potential of less than five (GWP 5). Compliance is required for any blowing agent
used to manufacture the insulation product or to spray it in place.
Page 13
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Page 14
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Page 15
Hilton Hotel – Additional Restaurant
Plot No. C1, Sector No. W43, Abu Dhabi Island
Page 16