16'-9" 5' 9" 4'-9" different concrete mix, the common 10'-9" 10'-9" 7'-3" 3' 3' concrete shall be done with the richer mix 2. Dimensions are given in ft-inches/mm 2-20# 2-20# 2-20# 1'-3" 2-20# 3.Covers: Beams:25mm, Footing Bottom:50mm A 1-16# 3-12# 2-12# 3-12# 3-12# 2-12# B Column:40mm,Footing side:75mm,Slab:20mm 4.Mix M20. 5.# - Indicates Fe 415 grade steel A 2-20# 2-12# 8mmØ 7" c/c 3-12# B 8mmØ 7" c/c 2-12# 6.Lap length of reinforcement 50Ø 2-20# 8mmØ 7" c/c 2-20# 8mmØ 7" c/c 1' 1-16# 1' 7.Drawing issued on a later date shall 2' 2'-6" supersede all previous drawing. BEAM B1 (9"x1'6") BEAM B7 (9"x1'0") BEAM B4 (9"x1'0") 8.Foundation is designed for G+1 Scale 1:50 Scale 1:50 Scale 1:50 9.Before laying concrete ,the bed of the foundation pit / trench should be thoroughly compacted by manual ramming 1 2 3 4 C B B A 10.Use 53 Grade Cement 16'-9" 5' 9" 4'-9" 10'-9" 10'-9" 11.Water Cement Ratio: For 1 Bag of cement 7'-3" 3' 3' 3' use maximum of 25 litres of water 2-20# 2-20# 2-20# 1'-3" 2-20# 12.Structural Engineer`s responsibility is C 1-16# 3-12# 2-12# D 3-12# 3-12# E 2-12# limited to design and issual of structural drawing only. C 2-20# 8mmØ 7"c/c 2-20# 1-16# 2-20# 8mmØ 7"c/c 2-12# 8mmØ 7" c/c 3-12# D 2-12# 8mmØ 7" c/c E 2-12# Issued for 1' CONSTRUCTION 2'-6" 1' 2' BEAM B2 (9"x1'6") Sl.no Revision date Drawn BEAM B8 (9"x1'0") BEAM B5 (9"x1'0") Scale 1:50 01 25.10.2016 S.BALAJI Scale 1:50 Scale 1:50 1 2 3 4 C B A PROJECT : 16'-9" 5' 5'-6" 10'-9" 10'-9" Proposed Residential Building