Anda di halaman 1dari 1

NOTES

1 2 3 4 C B A 1. At junctions of two elements of


16'-9" 5' 9" 4'-9"
different concrete mix, the common
10'-9" 10'-9"
7'-3" 3' 3'
concrete shall be done with the richer mix
2. Dimensions are given in ft-inches/mm
2-20# 2-20# 2-20# 1'-3" 2-20# 3.Covers: Beams:25mm, Footing Bottom:50mm
A 1-16# 3-12# 2-12# 3-12# 3-12# 2-12#
B Column:40mm,Footing side:75mm,Slab:20mm
4.Mix M20.
5.# - Indicates Fe 415 grade steel
A 2-20# 2-12# 8mmØ 7" c/c 3-12# B 8mmØ 7" c/c 2-12# 6.Lap length of reinforcement 50Ø
2-20# 8mmØ 7" c/c 2-20# 8mmØ 7" c/c 1'
1-16#
1'
7.Drawing issued on a later date shall
2'
2'-6" supersede all previous drawing.
BEAM B1 (9"x1'6") BEAM B7 (9"x1'0") BEAM B4 (9"x1'0") 8.Foundation is designed for G+1
Scale 1:50 Scale 1:50 Scale 1:50 9.Before laying concrete ,the bed of
the foundation pit / trench should be
thoroughly compacted by manual ramming
1 2 3 4 C B B A 10.Use 53 Grade Cement
16'-9" 5' 9" 4'-9" 10'-9" 10'-9" 11.Water Cement Ratio: For 1 Bag of cement
7'-3" 3' 3'
3' use maximum of 25 litres of water
2-20# 2-20# 2-20# 1'-3" 2-20# 12.Structural Engineer`s responsibility is
C 1-16#
3-12# 2-12# D 3-12# 3-12# E 2-12# limited to design and issual of structural
drawing only.
C
2-20# 8mmØ 7"c/c 2-20#
1-16#
2-20# 8mmØ 7"c/c 2-12#
8mmØ 7" c/c
3-12# D 2-12# 8mmØ 7" c/c E 2-12# Issued for
1'
CONSTRUCTION
2'-6" 1'
2'
BEAM B2 (9"x1'6") Sl.no Revision date Drawn
BEAM B8 (9"x1'0") BEAM B5 (9"x1'0")
Scale 1:50 01 25.10.2016 S.BALAJI
Scale 1:50 Scale 1:50
1 2 3 4 C B A PROJECT :
16'-9" 5' 5'-6"
10'-9" 10'-9" Proposed Residential Building

2-12# 2-12# 2-12# 2-12# 2-12#


F 1-20# G BLOCK : Ground Floor

8mmØ 7" c/c


2-20# 8mmØ 7"c/c
F 2-12#
2-12# 8mmØ 7"c/c 3-12#
8mmØ 7" c/c 2-12#
G
2-12#
CLIENT : Mr.Sivaswamy
1-16#
1'
1'-6" 2' 1'-6"

Note : Foundation is Designed For


BEAM B3 (9"x1'6") BEAM B9 (9"x1'0") BEAM B6 (9"x1'0") G+1
Scale 1:50 Scale 1:50 Scale 1:50
DRAWING DETAILS
Roof Beam Drawing
9" 9" 9" 9"
2-20mmØ TOP BARS 2-12mmØ TOP BARS 2-20mmØ TOP BARS 2-12mmØ TOP BARS
Stirrups: 8mmØ 7" C/C. 1' Stirrups: 8mmØ 7" C/C. Stirrups: 8mmØ 7" C/C. 1' Stirrups: 8mmØ 7" C/C. JOB NUMBER
1'-6" 1'-6"
2-20mmØ BOTTOM BARS 3-12mmØ BOTTOM BARS 2-20mmØ BOTTOM BARS 3-12mmØ BOTTOM BARS 01/03
1-16mmØ BOTTOM BARS 1-16mmØ BOTTOM BARS
1 2 3 4 DRAWN BY DESIGN ASST.
SECTION A-A SECTION B-B SECTION C-C SECTION D-D Balaji.S
Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25
REVISON NO - 0 DRAWING NO- 1/1
A B1 SCALE
DATE : 25.10.16
1:50, 1:25, 1:100
9" 9" B4 B5 B6
2-12mmØ TOP BARS
SHEET NUMBER
2-12mmØ TOP BARS
Column
1' Stirrups: 8mmØ 7" C/C.
1'-6" Stirrups: 8mmØ 7" C/C. 03
Ground Floor
2-12mmØ BOTTOM BARS 2-12mmØ BOTTOM BARS
1-16mmØ BOTTOM BARS B B2
STRUCTURAL ENGINEERS
Beam
SECTION E-E SECTION F-F
Scale 1:25 Scale 1:25 B7 B8 B9 S,BALAJI M.TECH.,(Structures)
Beam Beam Bottom Steel No 202, CQAL LAYOUT,
Refer Column shedule

Column Steel 9"


C B3
OPP DEV-IN,
60 FEET ROAD,
2-12mmØ TOP BARS SAHAKARA NAGAR
1' Stirrups: 8mmØ 7" C/C.
BANGALORE- 560 092
END SPAN MID SPAN
TYPICAL DETAIL
2-12mmØ BOTTOM BARS
KEYPLAN
@ BEAM-COLUMN JUNCTION SECTION G-G Scale 1:100 E.Mail : balacads@gmail.com
Scale 1:25 Scale 1:25 Phone No. : +91-9994030688

Anda mungkin juga menyukai