Controlling:
• Brainstorming(people)
• Fishbone Diagrams
• Critical Path Analysis Flow Diagrams
• Gantt Charts.
• Discretionary Costs:
• Engineered Costs:
• Committed Costs :
1. SALES BUDGET :
2. PRODUCTION BUDGET
The quantity of material required per unit of product is determined by the industrial
engineers who designed the product. Materials requirements are frequently
described in an engineering document referred to as a "bill of materials".
The cost of materials used is needed in the cost of goods sold budget .
Forcasting :
Types Of Budget :
Zero Based Budget : It is designed to evaluate the whole
spectrum of functional activity so that areas that are inefficient
and of little value are identified.