Anda di halaman 1dari 3

APPARATUS AND MATERIAL

For our project, we used a bamboo stick, hot glue gun, 3 second glue and thread.

1. Bamboo stick

2. Hot glue gun

3. 3 second glue
4. Thread
PROCEDURE

1. Firstly, we measured our bridge based on a requirement dimension of the bridge such as
clear span length (mm), overall span length (mm), base area (mm) and height of bridge
(mm) by using a ruler.

2. We have measured our weight of the bridge (kg) by using weight balance.
3. After that, we put our bridge at the table.
4. Then, we put the load, 5N continuously until our bridge was failed.

Anda mungkin juga menyukai