: QM-01/Edition: 2004/Section 14
Exhibit 3-3
Rev.00
Page 1 of 6
PURCHASE ORDER
Vendor Ship To
Tel. :
Fax. :
Attn :
Sub Total
VAT 0%
Total Order
Page 2 of 6
1. SUPPLY REQUIREMENTS
Please supply the items and all required documentation listed on this Purchase
Order for the prices shown subject to the terms and conditions detailed below
and on the General Terms and Conditions attached to this Purchase Order, and
subject to any attached specification
2. DOCUMENTATION
All required certification documentation Material Test Report (MTR), COO,
Manufacturing data report and other will be deliverable items against any
resultant purchase order and will be treated as such for acceptance of
deliveries and payment.
A copy of all relevant MTRs and Other must be available to enable
confirmation of material specification max. 1 week after shipment of material.
This is the responsibility of the Supplier and incorrect in references to required
MTRs or other certificate. will result in rejection of the material. All associated
costs for replacement.
4. INSPECTION
Quality control inspection is required when receiving material at PT. DEN
warehouse by arrangement with the contact person above. If there is any non-
conformance between materials required and supplied, PT. DEN has full
Page 3 of 6
authority to reject them, and supplier must replace with the correct one in
fasted shipment schedule
6. SHIPPING/DELIVERY SCHEDULE
Ex-work / Mill
CIF Surabaya Seaport
7. DELIVERY ADDRESS
CIF Tanjung Perak Seaport, Surabaya, Indonesia
8. INVOICES
8.1. All invoices shall be forwarded to Manager, Supply Management and
Procurement, at the above address.
8.2. Original invoices are required before payment.
8.3. Supplier shall submit 1 original and 2 copies of invoice
8.4. The address as follows :
PT. Dinamika Energitama Nusantara
Gedung Graha Pangeran 10th Floor
Jl. Ahmad Yani 286 Surabaya
Phone: +62 31 8273240/41
Fax: +62 31 8273239
Buyer:
Mobile Phone:
E-mail:
9. PAYMENT TERMS
9.1 ___ downpayment will be paid by Telegraphic Transfer after submission of :
Purchase Order confirmation
Original Invoice documents
9.2 ___ payment will be paid net __ weeks before shipment by Telegraphic
Transfer.
The Supplier account shall be shown clearly on the invoice(s).
10. CANCELLATION
Page 4 of 6
In the event of cancellation of this Purchase Order by means of termination at PT.
DINAMIKA ENERGITAMA NUSANTARA, PT. DINAMIKA ENERGITAMA
NUSANTARA shall reimburse _______ at the amount refer to Purchase Order
value:
10.1 ___ of Purchase Order Value administrative charges if termination dates as
noticed by PT. DINAMIKA ENERGITAMA NUSANTARA to ___ Tubes is
within ___ month after order placement.
10.2 ___ of Purchase Order Value administrative charges if termination dates as
noticed by PT. DINAMIKA ENERGITAMA NUSANTARA to ___ Tubes is
within ___ months after order placement.
10.3 ___ of Purchase Order Value administrative charges if termination dates as
noticed by PT. DINAMIKA ENERGITAMA NUSANTARA to ___ Tubes is
within___ months after order placement.
10.4 ___ of Purchase Order Value administrative charges if termination dates as
noticed by PT. DINAMIKA ENERGITAMA NUSANTARA to ___ Tubes is
within ___ month after order placement.
Page 5 of 6
Phone: +62 31 8273240/41
Fax: +62 31 8273239
- Notify party : (same as consignee)
- Shipping mark : PT. DINAMIKA ENERGITAMA NUSANTARA
Gedung Graha Pangeran 10th Floor
Jl. Ahmad Yani 286 Surabaya
Phone: +62 31 8273240/41
Fax: +62 31 8273239
PO #_____, Project No._____
Size of material per case/bundle
Weight of material per bundle
Package number
13. LIQUIDATED DAMAGES
Liquidated damages will be applied on the delivery of all items covered by
contract at the rate of 0.5% per each and every week of total contract value from
the due date of delivery with condition as following :
“ Recovery of liquidated damages will be at the rate of zero point five percent
(0.5%) of the contract price for each and every week from the due date of
delivery (Ex-Works) provided in the contract, but no exceeding five percent
(5%) in total. Liquidated damages shall be applied only after two (2) weeks of
grace period and it is limited on the delayed portion of the order ”.
Page 6 of 6
Mugi Raharjo
Title : President Director
Date : 6 September 2004