Estimated Cost:
Construction S/Division:
SUMMARY SHEET
Name of Work: 0
1 2 3 4 5 6
Amount of Installed Overhead Charges Installation Charges Contract Transformr Reused Dismentled Mat
Material Approved BOQ 12% 8% Work Charges Charges
0.00 0.00 0.00 0.00 0.00 0.00
7 8 (1+2+3+4+5+6+7-8)
Dismentled Material Consultancy Charges @ 0.40% of
Cost Of PC Poles Total Project Cost 90% of Consultan
Charges Total Project Cost
0.00 0 0 0 0
____________________________________________________
Prepared / Checked by Site Engineer
Engineering and Management Advisory Services (EnMASSE)
LT Proposal)
MATERIAL FOR COMPLETED WORK
Amount of
Installed
Material
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LT Proposal)
MATERIAL FOR COMPLETED WORK
Amount of
Installed
Material
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Amount of Material
Dismentled
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
LT Proposal)
MATERIAL FOR COMPLETED WORK
Amount of Material
Dismentled
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
Amount of Material
Dismentled
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
Dismentled Material Reused
Charges 15%
0.00
0
FORM A-90
Budget & Account Officer,
LT Proposal
You are advised of completion of the following Capital Works / Deposit Works / Purchases.
Name Of Work: 0
Job Order No. / Proposal No: 0
Name of Operation Division: 0
Name Of Operation Sub Division: 0
Name of Feeder: 0
Name Of Grid Station: 0
Location: 0
Completion Month:
Authorized Reference:
Description Item Quantity
(Type of Conductor)
HT Line ACSR Ospery Conductor Km
ACSR Dog Conductor Km
ACSR Rabbit Conductor Km
Insulated Ospery Km
Insulated Dog Km
Structure/ PC Pole HT Line
HT Structure
1) 45' No.
HT Structure
2) 40' No.
HT Structure
3) 36' No.
HT Pole Spun
4) 45' No.
(Type of Conductor)
LT Line AAC Wasp Conductor Km
AAC Ant Conductor Km
Insulated Wasp Km
Insulated Ant Km
Km
Structure/ PC Pole HT Line
1) LT Structure 31' No.
2) LT Spun Pole 31' No.
Cables
Type of Cable 1) Km
2) Km
Transformer
1) kVA
2) kVA
3) kVA
Site Engineer
EnMasse Consultant
Certified that all the un-used material at the above work have been returned to store and there is no ground balanc
of completion of above work
Sub Divisional Officer:
Construction Sub Division ________________
LESCO / WAPDA, Lahore
No further booking is required in any shape i.e., Labour, Material-Over Head FCC/Work
Executive Engineer
FIXED ASSET COST SHEET
(To be Filled by A/C Section)
Job Order No.:___________ A/C Head: _________ Completed On: _____________
Period Labour Material O/Head C/Work
TOTAL
s.
Length of Line
Km
Km
j Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
No.
No.
No.
here is no ground balance at the end
on ___________________
re
Estimated Life:______
TOTAL
FORM-D
Name of the Company: LESCO
Name of Work: 0
Augment 25 to 50 KVA
Scope: T/F and Extend L.T & Job Order No: 0
Reconducting of L.T
OBSERVATIONS