Anda di halaman 1dari 5

SAFE WORK METHOD STATEMENT

11 - Staging Installation, Construction and Dismantle

STAGING RENTALS & CONSTRUCTION SERVICES Client Name: Grounds Swell


Unit 6, 1-3 Burrows Road, (PO Box 103), Alexandria, NSW 2015 Client Address: 21 Buyuma Place, Avalon NSW
P: 02 9519 6300 F: 02 9519 6489
ABN:

Job Name: Foxtel Iron Throne Tour 2014 Client Contact (Name): Simon Hayward

Location: Martin Place, Sydney Client Contact (Mobile): 0411416643


Date SWMS provided to
Work Task Description: Staging installation 12th March 2014
client:
Does the job require Personal Protective Equipment - indicate below: Does the job involve High Risk Construction Work - indicate below Y/N:

High Visibility Clothing Y Safety Boots  Powered Plant N Working at Height (above 2M) N
Work where Asbestos could be
Hard Hat with Brim  Safety Eyewear/Goggles  Energised Electricity N N
disturbed
Hearing Protection  Gloves  Work in confined space/s N Work near/with pressurised gas N
Work near roads or where
Harness kit  Dust masks  Work in or near Excavations N N
pedestrians may be affected
Wet Weather Clothing  Sunscreen Y Hazardous Noise N Temporary load bearing structures N
Has the SWMS been Have workers been
developed based on a site- No consulted about the Yes
specific risk assessment? SWMS?
SWMS developed by: Staging Rentals WHS Committee SR Project Manager onsite: Jason Steffen
Person responsible for
Michael Stokes Toolbox talk carried out: Yes/No
reviewing the SWMS:
SR Project Manager ensure
Next SWMS review date: 01/07/2014 Yes/No
compliance with SWMS:

Approved Signature: Project Manager Signature:

Page 1 of 5
SAFE WORK METHOD STATEMENT
11 - Staging Installation, Construction and Dismantle

TASK HAZARDS & RISKS HAZARD/RISK MANAGMENT PROCEDURES


1. Consult with your Supervisor 1. Lack of Information 1. Consult with supervisor, understand the task, safest
2. Assess the situation (type of stage being 2. Strain on back (back injuries) techniques and procedures to install and construct staging
used, venue requirements, indoor or 3. Collision with plant or pedestrian 2. Build on flat surfaces where possible
outdoor usage etc.) 4. Manual Handling when mechanical 3. Sight the CAD drawings for the structure (marked
3. Designate Loading/Unloading area for ease aids could have been used CONSTRUCTION)
of assembly (close to build location) 5. Risks poorly assessed and controls 4. No works decks are to be installed above 2m.
4. Ensure the use of a Forklift or other inadequate 5. Confirm orientation.
mechanical lifting devices over manual 6. Fall from stage 6. Set legs and decks.
handling to move staging elements 7. Structural Collapse 7. Place two legs on one side and lift, then insert the legs on
5. Review SWMS to ensure clarity around risk 8. Crush or pinch of limbs the opposite side.
controls and procedures for the task 8. Place base plates under the legs.
(Manual Handling, Loading/Unloading of 9. Attach handrails where possible as per the CAD’s.
trucks, Forklift usage and any other relevant 10. Check and install extra bracing when required
SWMS) 11. Check level
6. Review CAD’s, site renders or any other 12. Fasten steps
build plans 13. Understand the type of stage to be used, venue.
7. Assign area for the construction of the stage requirements and rely on training and experience in stage
8. Isolate the build area builds
9. Take measurements and mark out staging 14. Consult with the venue and designate Loading/Unloading
areas with reference to final build plans area to limit Manual Handling
10. Place down ground protection where 15. Forklift usage should be conducted by licensed, qualified
relevant and experienced to do so. They should abide by speed
11. Move staging elements into position limits and traffic rules. Identify all equipment and match
12. Position legs to align with the correct weight with loading or unloading procedure. Be aware of
staging position changing weights of items. Work with truck driver and allow
13. Construct support assistance in loading/unloading.
14. Insert floor surfaces 16. Refer to all relevant SWMS. Use a TRA form to assess the
15. Check level jobs hazards/risks.
16. Install hand railings where relevant 17. Review all build plans to understand the situation
17. Test stage for suitability and structural 18. Consult with the venue and final build plans
integrity 19. Use signage, a ground person and/or barricades to isolate
18. Gain approval from the client or venue the build area when in a public area – This should be
19. For dismantle perform the steps in logical provided by the client.
reverse 20. Mark out using bent knees and a straight back, a trundle
wheel should be used where possible
Page 2 of 5
SAFE WORK METHOD STATEMENT
11 - Staging Installation, Construction and Dismantle

21. Installation work of ground protection is to done in


accordance with the SWMS for Manual Handling tasks.
22. Installation work of staging elements is to done in
accordance with the SWMS for Manual Handling tasks.
(Steps 11-14)
23. Consider using forklift, palette jack or other mechanical
lifting devices before opting for Manual Handling techniques
24. Test stage for suitability upon completion
25. Gain approval from the client or venue

Personal Qualifications and Experience: Personnel, Duties and Training Required to Complete Work:
Responsibilities:
 Experience in reading stage plans  Read this SWMS and comply with its  Staging Rentals Staging Installation, Construction and
 Experience in executing plans as per client guidelines. Dismantle Induction
and manufacturer requests  Communicate with and follow  Emergency & First Aid training
 Experience with lifting or moving objects. reasonable instructions from your
 Read and follow this SWMS. Supervisor

Engineering Details/ Certificates/Work Cover Applicable Code of Practice, Legislation:


Approvals:
N/A AS/NZS 1170.1:2002 – Structural design actions

Plant/Equipment: Maintenance Checks and Regime:


Ensure lifting aids are approved and meet Ensure all lifting devices are maintained regularly as per manufacturer specifications.
standards.

Page 3 of 5
SAFE WORK METHOD STATEMENT
11 - Staging Installation, Construction and Dismantle

Name of workers consulted and inducted in


Worker Signature: Inducted by (Project Manager): Date:
this SWMS:

Page 4 of 5
SAFE WORK METHOD STATEMENT
11 - Staging Installation, Construction and Dismantle

Page 5 of 5

Anda mungkin juga menyukai