ENSURE ALL GROUNDING IN ACCORDANCE WITH THE PROJECTS IFC DRAWINGS AND
MANUFACTURER’S SPECIFICATIONS.
VERIFY THAT CONTINUITY TESTING HAS BEEN CONDUCTED.
CHECK TERMINATIONS ARE COMPLETE AND IN ACCORDANCE WITH THE PROJECTS IFC DRAWINGS AND
MANUFACTURER’S SPECIFICATIONS.
CHECK ALL CONDUCTORS ARE LABELED AND IDENTIFIED.
COMMENTS:
Beaver Infra Consultant Pvt. Ltd.
AUTOMATIC TRANSFER SWITCH INSTALLATION CHECKLIST
PRINT/ TYPE: SIGNATURE
BEAVER INFRA CONSULTANT PVT. LTD.
DATE (MM/DD/YY):
REPRESENTATIVE:
E102 (REV 00)11-
/ / 11
CLIENT REPRESENTATIVE: DATE (MM/DD/YY):
/ /