AUTOMATIC TRANSFER SWITCH INSTALLATION CHECKLIST

E102 (REV 00)11-


11

PROJECT: LOCATION: AREA:


TAG #: MANUFACTURER:
SERIAL #: MODEL: HZ:
SIZE: TYPE:
VOLTAGE: AMPS: RANGE:
BEFORE INSTALLING OR TESTING AUTOMATIC TRANSFER SWITCHES, OUR EMPLOYEES WILL
YES N/A
ENSURE THAT THEY:
INSPECT FOR EXTERNAL OR SHIPPING DAMAGE, LOOSE PARTS AND MISSING PARTS.
VERIFY NAMEPLATE DATA AND RATING OF EQUIPMENT IN ACCORDANCE WITH THE PROJECTS IFC
DRAWINGS. RECORD.
IDENTIFY PHASES OF BOTH SOURCES AND IDENTIFY PHASES ON CONDUCTORS.

VERIFICATION: YES N/A


MOUNTING EQUIPMENT IS INSTALLED IN ACCORDANCE WITH THE PROJECTS IFC DRAWINGS &
MANUFACTURER’S SPECIFICATIONS.

CHECK COVERS AND DOORS FOR INSTALLATION AS PER MANUFACTURER’S SPECIFICATIONS.

ENSURE ALL GROUNDING IN ACCORDANCE WITH THE PROJECTS IFC DRAWINGS AND
MANUFACTURER’S SPECIFICATIONS.
VERIFY THAT CONTINUITY TESTING HAS BEEN CONDUCTED.
CHECK TERMINATIONS ARE COMPLETE AND IN ACCORDANCE WITH THE PROJECTS IFC DRAWINGS AND
MANUFACTURER’S SPECIFICATIONS.
CHECK ALL CONDUCTORS ARE LABELED AND IDENTIFIED.

PULL-TUG METHOD COMPLETED AFTER TERMINATION.

CHECK TIGHTNESS OF ALL CABLE CONNECTIONS AND BUSS JOINTS.


PERFORM MANUAL TRANSFER OPERATION; VERIFY THE SWITCHES IN CHANGING STATUS BY THE
MECHANICAL ACTION, TO ENSURE POSITIVE INTERLOCK BETWEEN NORMAL AND ALTERNATE SOURCES.

CHECK FOR CLEANLINESS.

COMMENTS:
Beaver Infra Consultant Pvt. Ltd.
AUTOMATIC TRANSFER SWITCH INSTALLATION CHECKLIST
PRINT/ TYPE: SIGNATURE
BEAVER INFRA CONSULTANT PVT. LTD.
DATE (MM/DD/YY):
REPRESENTATIVE:
E102 (REV 00)11-
/ / 11
CLIENT REPRESENTATIVE: DATE (MM/DD/YY):

/ /