Anda di halaman 1dari 18

Provinsi : Sumatra Selatan

Kabupaten : Musi Banyuasin


Kecamatan : Sungai Keruh
Desa : Gajah Mati

Mata
Uraian Pekerjaan Volume
Pembayaran

1 Pekerjaan Tanah

Penyiapan Badan Jalan M2 1.00 100

Pair Urug M3 1.00 100

2 Pekerjaan Papan Mal

Bekisting/Papan Mall M2 1.00 100

3 Pek Cor Beton 1:2:4

Cor Beton 1:2:4 M3 1.00 100

4 Pelapisan Dengan Aspal (Tack Coat)

Pek. Pelapisan Dengan Aspal (Tack Coat) M2 1.00 100

5.00
RENCANA P
RENCANA
REALISASI P
REALISASI
DEVISI

Di Setujui Oleh: Di Periksa Oleh:


Kades Ketua TPK
Di Setujui Oleh: Di Periksa Oleh:
Kades Ketua TPK

0
JADWAL PELAKSANAAN
(METODE KURVA S)

BULAN KE :
PERIODE :
BOBOT :

Jadwal Pelaksanaan Proyek


Tahun 2016
Bobot (%) Mei Juni
1 2 3 4 1 2 3 4 1

#REF! #REF! 0.67 0.67 0.67 0.67 0.67 0.67 0.67

#REF! #REF! #REF! 0.41 0.41 0.41

#REF! #REF! 0.391 0.391 0.391

RENCANA

#REF! #REF! 10.01 10.01 10.01 10.01

#REF!

#REF!
RENCANA PER MINGGU #REF! 0.67 #REF! #REF! #REF! #REF! 11.47 11.47 11.47
RENCANA KOMULATIF #REF! 0.67 #REF! #REF! #REF! #REF! 11.47 11.47 11.47
ALISASI PER MINGGU 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EALISASI KOMULATIF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEVISIASI (+/-) #REF! -0.67 #REF! #REF! #REF! #REF! -11.47 -11.47 -11.47
- 0.000
- %

aksanaan Proyek
un 2016
Juli Keterangan
2 3 4

0.67 0.67

0.41 0.41 0.41

0.391 0.391

10.01 10.01 10.01

#REF! 3.84

11.47 #REF! 15.31 #REF!


11.47 #REF! 15.31 #REF!
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
-11.47 #REF! -15.31 #REF!

Di Buat Oleh:
Kader Teknis
PROGRAM ANGGARAN PENDAPATAN BELANJA
KECAMATAN SUNGAI KERUH KABUPATEN MUSI BAYUASIN PRO
TAHUN ANGGARAN 2017

Revisi Daftar Harga Satuan Ba


Propinsi : Sumatera Selatan
Kabupaten : Musi Banyuasin
Kecamatan : Sungai Keruh
Desa : Kertayu

No. URAIAN Satuan Harga Toko 1 Harga Toko 2 Harga Toko 3

1 2 3 4 5 6
1. BAHAN
Pabrik
Besi Ø 10 KS Sis Btg 62,600
1 Besi Ø 8 KS Sis Btg 36,700
2 Besi Ø 6 KS Sis Btg 18,800
3 Kawat ikat Kg 22,400
4 Paku Kg 22,400
5 Paku Plapon Kg 22,400
6 Plywod t=9mm Kg 98,500
7 Plywod t=4mm Kpng 62,600
8 Semen Zak 62,600
9 Semen Warna kg 8,100
10 Pintu Piber bh 204,200
11 Bak Fiber bh 358,100
12 Keramik 40 x 40 ktk 67,200
13 Keramik 30 x 30 (WC) ktk 67,200
14 Plint Keramik 10 x 40 cm bh 6,900
15 Engsel Pintu (Eiffel 4 ') bh 40,300
16 Engsel Jendela Kupu-kupu (ART) bh 14,300
17 Grendel Pintu + Jendela bh 4,400
18 Hak angin Jendela bh 5,900
19 Tarikan Jendela bh 6,300
20 Kunci Pintu/Benam Padri bh 132,500
21 kloset Jongkok Gobal bh 179,100
22 Pipa 4 " PVC AW bh 179,100
23 Pipa T Hawa 2" PVC AW bh 71,600
24 Elbow 4 " bh 7,200
25 Kran Air bh 20,600
26 Pipa 1/2 bh 21,500
27 Elbow 1/2 bh 4,400
28 Plamir kg 6,700
29 Cat Tembok Vinilex gln/25 kg 403,000
30 Cat Kayu Avian Ltr 55,600
31 Cat Meni Ltr 55,600
32 Thinner Cobra klg 29,500
33 Rangka Atap Baja Ringan m2 152,200
34 Atap Sakura Roof 80/80 Bh 38,500
35 Nok Geteng Metal M 20,600
36 Lisplang GRC (Uk. 200 x 2440 MM) Kpng 49,200
37 Calciboard Ling Uk 1200 x 1400 mm bh 60,900
38 List Plapond bh 26,900
39 Papan Tulis bh 268,600
40 Ayunan bh 2,686,400
41 Perosotan bh 2,775,900
42 Tangga Majemuk 4 Arah bh 1,790,900
43 Ampere Listrik 1300 Amp bh 3,134,100
44 Kabel Praba 2,5 mm2 bh 6,300
45 Kabel Praba 1,5 mm2 bh 5,400
46 Isolasi Listrik bh 4,400
47 Pipa Listrik 5/8 bh 21,500
48 Elbo Listrik 5/8 bh 4,400
49 N bow bh 6,300
50 Mangkok saklar bh 4,400
51 Stop kontak biasa bh 16,200
52 Fiting plafond bh 4,400
53 Saklar tunggal bh 10,700
54 Lampu Hanox bh 51,900
55 Roster Kramik Minimalis bh 46,600
56 Roster Kayu bh 49,200
57 Lem Pipa bh 6,900
58 Kipas Angin bh 474,600
59 Aspal bh 2,238,600
60 Solar Drum 10,700
61 Plastik Cor Rol 111,900
62 Kawat Harmonika Lbr 13,400
63 Net Bh 179,100
64 Bola Volley Type Mikasa Bh 183,600
65 Tiang Pipa Galvanis Medium Dia 4' Btg 716,400
66 Sekur Pipa Galvanis Medium Dia 2' Btg 197,000
67 Cat Platon klg 179,100

Bahan Non Pabrik


1 Batu Bata Lobang Bh 600
2 Air Kerja Ltr 900
3 Kayu Gelam Dia 8 - 10 CM Panjang 4 M Btg 13,400
4 Kayu Gelam Dia 10 - 15 CM Panjang 4 M Btg 15,300
5 PApan Klas IV M3 1,880,500
6 Kayu Balok 5/7 Kls IV M3 1,880,500
7 PApan 5/7 Kls III M3 2,149,100
8 Kayu Balok 5/7 Kls III M3 2,149,100
9 Koral /Split 2/3 M3 465,600
10 Batu kali M3 403,000
11 Pasir M3 200,000
12 Pasir Urug M3 200,000
13 Tanah Timbunan M3 53,700
14 Kusen + Daun Pintu bh 895,500
15 Kusen Jendela bh 626,900
16 Daun Jendela + Kaca bh 313,400
17 Meja Murid bh 313,400
18 Kursi Murid bh 134,400
19 Meja Guru bh 537,300
20 Kursi Guru bh 134,400
21 Lemari Arsip 2,238,600
22 Ijuk kg 7,200
23 Papan Nama Proyek bh 447,700
24 Meja bh 537,300
25 Ranjang Pasien bh 447,700
26 Kursi Plastik bh 58,200
27 Lemari bh 2,238,600

bh -
2. ALAT
1 Benang Rol 4,400
2 Cangkul Bh 71,600
3 Ember Bh 9,000
4 Gegep/Catut/Kaka Tua Bh 9,800
5 Gergaji besi Bh 30,400
6 Gergaji potong Bh 26,900
7 Gerobak sorong Bh 403,000
8 Kunci Besi Bh 13,400
9 Mata Gergaji Besi Bh 9,000
10 Meteran 7 m Bh 9,000
11 Meteran 50 m Bh 67,200
12 Martil Bh 19,700
13 Sekop Bh 44,800
14 Selang waterpas M 5,400
15 Sendok semen Bh 22,000
16 Waterpass Bh 26,900
17 Prasasti Bh 626,900
3. UPAH
1 Pekerja OH
2 Tukang OH
3 Mandor OH

Disetujui oleh :
kades
GGARAN PENDAPATAN BELANJA NEGARA
BUPATEN MUSI BAYUASIN PROPINSI SUMATERA SELATAN
TAHUN ANGGARAN 2017

Harga Satuan Bahan / Alat

Harga Satuan ( Rp.)


Harga Rab
Ongkos Angkut Termasuk PPN +
Revisi Harga Keterangan
Dr Desa Sampai PPN 10% PPH 1,5% PPh + Ongkos
Bahan & Alat Angkut Ke desa
Lokasi

7 9 10 11 12 13

62,600 6,400 1,000 70,000


36,700 - 3,700 600 41,000
18,800 - 1,900 300 21,000
22,400 - 2,300 300 25,000
22,400 - 2,300 300 25,000
22,400 2,300 300 25,000
98,500 10,000 1,500 110,000
62,600 6,400 1,000 70,000
62,600 3,000 6,400 1,000 70,000
8,100 800 100 9,000
204,200 20,700 3,100 228,000
358,100 36,400 5,500 400,000
67,200 6,800 1,000 75,000
67,200 6,800 1,000 75,000
6,900 700 100 7,700
40,300 4,100 600 45,000
14,300 1,500 200 16,000
4,400 500 100 5,000
5,900 600 100 6,600
6,300 600 100 7,000
132,500 13,500 2,000 145,000
179,100 18,200 2,700 200,000
179,100 18,200 2,700 200,000
71,600 7,300 1,100 80,000
7,200 700 100 8,000
20,600 2,100 300 23,000
21,500 2,200 300 24,000
4,400 500 100 5,000
6,700 700 100 7,500
403,000 40,900 6,100 450,000
55,600 5,600 800 62,000
55,600 5,600 800 62,000
29,500 3,000 500 33,000
152,200 15,500 2,300 170,000
38,500 3,900 600 43,000
20,600 2,100 300 23,000
49,200 5,000 800 55,000
60,900 6,200 900 68,000
26,900 2,700 400 30,000
268,600 27,300 4,100 300,000
2,686,400 272,700 40,900 3,000,000
2,775,900 281,800 42,300 3,100,000
1,790,900 181,800 27,300 2,000,000
3,134,100 318,200 47,700 3,500,000
6,300 600 100 7,000
5,400 500 100 6,000
4,400 500 100 5,000
21,500 2,200 300 24,000
4,400 500 100 5,000
6,300 600 100 7,000
4,400 500 100 5,000
16,200 1,600 200 18,000
4,400 500 100 5,000
10,700 1,100 200 12,000
51,900 5,300 800 58,000
46,600 4,700 700 52,000
49,200 5,000 800 55,000
6,900 700 100 7,700
474,600 48,200 7,200 530,000
2,238,600 227,300 34,100 2,500,000
10,700 1,100 200 12,000
111,900 11,400 1,700 125,000
13,400 1,400 200 15,000
179,100 18,200 2,700 200,000
183,600 18,600 2,800 205,000
716,400 72,700 10,900 800,000
197,000 20,000 3,000 220,000
179,100 18,200 2,700 200,000

- - - -
600 - 100 9 709
900 - 100 14 1,014
13,400 - 1,400 200 15,000
15,300 - 1,500 200 17,000
1,880,500 - 190,900 28,600 2,100,000
1,880,500 - 190,900 28,600 2,100,000
2,149,100 - 218,200 32,700 2,400,000
2,149,100 218,200 32,700 2,400,000
465,600 300,000 47,300 7,100 520,000
403,000 300,000 40,900 6,100 450,000
200,000 300,000 200,000 Tdk Kena PPN +
200,000 300,000 200,000 Tdk Kena PPN +
53,700 5,500 800 60,000
895,500 90,900 13,600 1,000,000
626,900 63,600 9,500 700,000
313,400 31,800 4,800 350,000
313,400 31,800 4,800 350,000
134,400 13,600 2,000 150,000
537,300 54,500 8,200 600,000
134,400 13,600 2,000 150,000
2,238,600 227,300 34,100 2,500,000
7,200 700 100 8,000
447,700 - 45,500 6,800 500,000
537,300 54,500 8,200 600,000
447,700 - 45,500 6,800 500,000
58,200 - 5,900 900 65,000
2,238,600 - 227,300 34,100 2,500,000

- - - - -
-
4,400 - 500 100 5,000
71,600 - 7,300 1,100 80,000
9,000 - 900 100 10,000
9,800 - 1,000 200 11,000
30,400 - 3,100 500 34,000
26,900 - 2,700 400 30,000
403,000 - 40,900 6,100 450,000
13,400 - 1,400 200 15,000
9,000 - 900 100 10,000
9,000 - 900 100 10,000
67,200 - 6,800 1,000 75,000
19,700 - 2,000 300 22,000
44,800 - 4,500 700 50,000
5,400 - 500 100 6,000
22,000 - 2,200 300 24,500
26,900 - 2,700 400 30,000
626,900 63,600 9,500 700,000

100,000 100,000
120,000 120,000
150,000 150,000

Dibuat oleh :
Tim Pengelola Kegiatan ( TPK )
PROGRAM PEMBANGUNAN PEMBERDAYAAN MASYARAK
KECAMATAN SUNGAI KERUH KABUPATEN MUSI BAYUASIN PROPIN
TAHUN ANGGARAN 2017

REKAPITULASI ANGGARAN BIAYA PRASARANA

Kecamatan : Sungai Keruh


Desa : Kertayu
: Gedung Prasarana
Kegiatan Kegiatan : Saptitank Kegiatan : Lapangan Volly
Olaraga
Ukuran 7 x 8 M Bobot % Ukuran " 1,2 x 1,6 M Bobot % Ukuran : 1 Unit
No. Uraian Jumlah : 1 Unit Jumlah : 1 Jumlah :
No. RAB : 01 No. RAB : 2 No. RAB : 03
Dana Desa Swadaya Dana Desa Swadaya Dana Desa Swadaya
BAHAN
I (Rincian lihat di 71,267,354.00 - 14.78 2,212,700.00 0.46 95,973,000.00
RAB)

ALAT
II (Rincian lihat di 116,000.00 - 0.02 - -
RAB)

UPAH
III (Rincian lihat di 45,774,000.00 - 9.49 960,000.00 0.20 22,320,000.00
RAB)

UPAH ANGKUT
IV (Rincian - -
lihat di RAB)

JUMLAH 117,157,354 - 24.29 3,172,700 0.66 118,293,000

V TPK 2% 5,520,100.00 1.14 -

VI Desain RAB 4,231,704.00 0.88 -

VII PENUNJANG INFORMASI 700,000.00 0.15 - 700,000.00

JUMLAH TOTAL 127,609,158.00 - 26.46 3,172,700 0.66 118,993,000


Jumlah Biaya Upah 45,774,000.00 - 960,000 22,320,000

Jumlah HOK Konstruksi - HOK

Disetujui Oleh : Dibuat Oleh :


Kades Kader Teknis/Tenaga Profesional

BADARUDIN /LIMPA KURNIA,ST


EMBERDAYAAN MASYARAKAT DESA
MUSI BAYUASIN PROPINSI SUMATERA SELATAN
NGGARAN 2017

GGARAN BIAYA PRASARANA

Propinsi : Sumatera Selatan


Kabupaten : Musi Banyuasin
: Lapangan Volly Kegiatan : Jln Cor Beton
Bobot % Ukuran 623.00 Bobot %
JUMLAH TOTAL
Jumlah : 1
Bobot %
No. RAB : 04
Dana Desa Swadaya Dana Desa Swadaya

19.90 166,733,542.00 34.57 336,186,596.00 - 69.71

- 1,242,000.00 0.26 1,358,000.00 - 0.28

4.63 55,980,000.00 11.61 125,034,000.00 - 25.93

- - - - -

24.53 223,955,542.00 46.44 462,578,596.00 - 95.92

- 4,125,000.00 9,645,100.00 2.00

- 3,000,000.00 7,231,704.00 1.50

0.15 1,400,000.00 0.29 2,800,000.00 0.58

24.67 232,480,542.00 46.73 482,255,400.00 - 100.00


125,034,000.00 - 25.93

- - HOK

Ketua TPK
Data Kec : Sungai KeruSungai Keruh
Desa : Kertayu Kertayu
Kades
Sekdes
TPK
Kader Teknis /LIMPA KURNIA,ST