Anda di halaman 1dari 1

SCHEDULE PEKERJAAN

Proyek : Pembangunan Kantor


Tugas : Manajement Kontruksi
Prodi : Teknik Sipil

Februari 2016 Maret 2016 April 2016 Mei 2016 Juni 2016 Juli 2016 Agustus 2016
Item Bobot Mg - 1 Mg - 2 Mg - 3 Mg - 4 Mg - 5 Mg - 6 Mg - 7 Mg - 8 Mg - 9 Mg - 10 Mg - 11 Mg - 12 Mg - 13 Mg - 14 Mg - 15 Mg - 16 Mg - 17 Mg - 18 Mg - 19 Mg - 20 Mg - 21 Mg - 22 Mg - 23 Mg - 24 Mg - 25 Mg - 26 Mg - 27 Mg - 28
Uraian Pekerjaan
No. Unit Volume (%) -5hr 7hr 14hr 21hr 28hr 35hr 42hr 49hr 56hr 63hr 70hr 77hr 84hr 91hr 98hr 105hr 112hr 119hr 126hr 133hr 140hr 147hr 154hr 161hr 168hr 175hr 180hr 187hr

100%
A. PEKERJAAN PERSIAPAN lot 1.00 5.95% 0.0046 0.0046 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0022 0.0002

B. PEKERJAAN PONDASI m3 4.05 11.45% 0.0023 0.0172 0.0229 0.0344 0.0229 0.0149

C. PEKERJAAN LANTAI BETON, T = 12CM m2 569.50 15.13% 0.0212 0.0318 0.0371 0.0159 0.0091 0.0182 0.0182

D. PEKERJAAN PONDASI BT. KALI, L = 79.07M' m3 43.35 1.94% 0.0010 0.0048 0.0136

E. PEKERJAAN SLOOF 20 x 40 CM (TB2), L = 225 M' m3 18.00 3.55% 0.0018 0.0071 0.0071 0.0195
80%
F. PEKERJAAN SLOOF 15 x 30 CM (TB3), L = 50.66 M' m3 2.28 0.61% 0.0006 0.0021 0.0021 0.0012

G. PEKERJAN KOLOM 40 x 40 CM, H = 4.25 M, 27 BH m3 18.36 3.74% 0.0007 0.0112 0.0112 0.0142

H. PEKERJAN KOLOM 30 x 30 CM, H = 4.25 M, 2 BH m3 0.77 0.17% 0.0009 0.0003 0.0002 0.0003

I. PEKERJAN KOLOM PRAKTIS, H = 4.25 M, 27 BH m3 2.58 0.89% 0.0018 0.0018 0.0018 0.0018 0.0018

J. PEKERJAAN PASANGAN DINDING BATA, H = 4.25 m2 457.35 7.75% 0.0062 0.0094 0.0219 0.0125 0.0062 0.0060 0.0060 0.0060 0.0032
60%
K. PEKERJAAN PLAFOND m2 531.03 5.01% 0.0303 0.0118 0.0024 0.0024 0.0024 0.0008

L. PEKERJAAN KM + TEMPAT WUDHU lot 1.00 0.78% 0.0078

M. PEKERJAAN BALOK 25 x 50 CM (B2), L = 220 M' m3 27.50 6.52% 0.0117 0.0280 0.0130 0.0124

N. PEKERJAAN BALOK 20 x 40 CM (B4), L = 80 M' m3 6.40 1.45% 0.0044 0.0058 0.0015 0.0029

O. PEKERJAAN BALOK 15 x 25 CM (B6) m3 2.24 0.54% 0.0013 0.0013 0.0013 0.0013


40%
P. PEKERJAAN PLAT BETON, T = 12CM m2 512.31 17.46% 0.0349 0.0402 0.0524 0.0471

Q. PEKERJAN KOLOM 40 x 40 CM, H = 4.25 M, 27 BH m3 4.73 0.74% 0.0074

R. PEKERJAN KOLOM 30 x 30 CM, H = 4 M, 2 BH m3 0.13 0.03% 0.0003

S. PEKERJAN KOLOM PRAKTIS, H = 3.75 M, 19 BH m3 0.30 0.10% 0.0010

T. PEKERJAN KOLOM PRAKTIS, H = 0.70 M, 26 BH m3 0.41 0.14% 0.0014


20%
U. PEKERJAAN DINDING BATA SEPARATOR, H = 0,7 m2 75.00 1.33% 0.0133

V. PEKERJAAN TANGGA m3 2.57 0.47% 0.0023 0.0023

W. PEKERJAAN SALURAN KELILING m' 92.00 3.42% 0.0222 0.0086 0.0017 0.0017

X. PEKERJAAN KUSEN ALUMINIUM unit 50.00 6.25% 0.0125 0.0125 0.0125 0.0200 0.0050

Y. PEKERJAAN INSTALASI LISTRIK : lot 1.00 4.58% 0.0014 0.0014 0.0014 0.0023 0.0023 0.0029 0.0029 0.0029 0.0057 0.0074 0.0062 0.0025 0.0025 0.0025 0.0012 0.0003
0%

TOTAL RENCANA 100.00% 0.00% 0.46% 0.69% 1.94% 2.51% 3.99% 4.08% 5.14% 5.17% 5.19% 5.29% 6.04% 6.40% 6.19% 6.18% 6.30% 6.26% 5.11% 5.04% 4.44% 4.05% 2.83% 2.45% 1.31% 1.31% 1.18% 0.46% 0.00%
AKUMULASI RENCANA 0.00% 0.00% 0.46% 1.14% 3.08% 5.59% 9.58% 13.65% 18.80% 23.97% 29.16% 34.46% 40.50% 46.90% 53.09% 59.27% 65.57% 71.83% 76.94% 81.98% 86.42% 90.47% 93.30% 95.75% 97.06% 98.36% 99.54% 100.00% 100.00%

TOTAL AKTUAL 0.00% 0.61% 1.84% 2.26% 1.35% 3.88% 4.12% 3.77% 5.34% 5.52%
AKUMULASI AKTUAL 0.00% 0.61% 2.45% 4.72% 6.06% 9.94% 14.07% 17.84% 23.18% 28.69%
DEVIASI / SELISIH 0.00% 0.15% 1.31% 1.64% 0.47% 0.37% 0.41% -0.96% -0.79% -0.47%

Tugas Kelompok : - Nama : Eki Rizky F - B1021412RB4002


- Nama : Dela Hermayulia - B1021412RB4001 : Akumulasi Rencna
- Nama : Husnul Holki - B1021412RB4009 : Akumulasi Aktual
- Nama : Triyono - B1021412RB4012

Anda mungkin juga menyukai