Anda di halaman 1dari 9

RANCHO HERMOSO SA

DEPARTAMENTO DE PERFORACION
HOJA PARA CONTROL DE ARREMETIDAS
- PAGINA 1 -
POZO: RH-3 TALADRO: PRIDE No. 14

ANOTE POR ADELANTADO FECHA ANOTADO: 14-Jul-04 DATOS DEL INFLUJO FECHA DEL EVENTO: 14-Jul-04

I CARACTERISTICAS DEL POZO: IV GRABACION DE LOS PARAMETROS AL MOMENTO DEL EVENTO:


1.1 PROFUNDIDAD DEL POZO; TVD = 13,000 pies MD = 13,500 pies 4.1 PRESION DE CIERRE DE LOS TUBOS DE PERFORACION "SIDPP" = 1000 psi (*)
1.2 PESO ORIGINAL DEL LODO "OMW" = 9.0 ppg 4.2 PRESION DE CIERRE DEL CSG. "SICP" / MASCP" (1.5) = 1400 psi / 98 ppg
1.3 REVESTIDOR: Profundidad "TVD" = 8,202' 7 7/8 '' Peso 40.0
pies / "MD"= 8,202' ,Æ 4.3 Volúmen de la ganancia en el tanque activo = 75 bls.
1.4 PRUEBA INTEGRIDAD DE FUGA "LOT"= 2550 psi a 8,202' con 9.0 ppg= 14.98 EMW 4.4 Pesos del lodo "entrante" / "saliendo" = 9.0 LPG / 6.8 LPG
1.5 PRESION MAX. ADMISIBLE EN SUPERFICIE "MASCP" 2550 psi con "OMW"act 9.0 ppg 4.5 Profundidad de la bit. = 13,000 pies TVD / 13,500 pies "MD"
- DIAMETRO DEL POZO = 8 1/2 in DIAMETRO INTERNO - REVESTIDOR = 8.835 in 4.6 Válvula flotadora CG / CA en la sarta: NO / SI (*)
Landing sub en la sarta: NO / SI - Profundidad 13,468.50 pies
II PARAMETROS DE BOMBEO: 4.7 Origen de la "Venida": "Drilling break" / Viaje Ý ß / Perdida / Otro
Camisa STROKE: 11.0 In. KRP KRS
7.0 Capacidad "BPS" Presion / Velocidad Reducida de Bombeo V CALCULOS DEL CONTROL DE POZO:
-Bomba 1 0.1244 BPS 1000 psi / 80 SPM / 9.95 BPM 5.1 KILL WEIGHT MUD (KWM) = SIDPP + OMW = = 10.48 ppg
-Bomba 2 0.1244 BPS 1100 psi / 90 SPM / 11.20 BPM 0,052xTVD
Eff.% .95 14.88
3.1 VOLUMEN INTERIOR TUBERIA: 5.2 SI KWM ES MAYOR QUE (LOT-0.1), EFECTUAR "STRIPPING" HASTA PROFUNDIDAD:
a. DP-1 OD 5.00 plgs. ID = 4.276 ins x 8202 pies = 145.74 bls. SIDPP pies = 3271 pies
b. DP-2 OD 5.00 plgs. ID = 4.276 ins x 4598 pies = 81.70 bls. [ (LOT-0.1) - OMW ] x 0.052
c. HW-1 OD 5.00 plgs. ID = 3.000 ins x pies = 0.00 bls. Y CONTROLAR POZO CON KWM = (LOT - 0.1) A ESTA PROFUNDIDAD
d. DC-1 OD 6.00 plgs. ID = 2.000 ins x 700 pies = 2.72 bls. (VER PROCEDIMIENTO DE "STRIPPING EN PAGINA 2)
e. DC-2 OD plgs. ID = 0.0000 ins x 0 pies = 0.00 bls. - BOMBA NO. 1
f. DC-3 OD plgs. ID = 0.0000 ins x 0 pies = 0.00 bls. 5.3 PRESION INCIAL DE = SIDPP + KRP-1 = 2000 psi
Volúmen Total 13,500 230.16 bls. (3.1) CIRCULACION "ICP"
- 0 0.00
Surface to bit, Bbls. = 230.16 bls.(3.1) ¸ 0.1244 BPS = 1850 Strokes 5.4 PRESION FINAL DE = KRP-1 x KWM = 1164 psi
3.2 VOLUMEN ESPACIO ANULAR: CIRCULACION "FCP" OMW
a. DP-1 CSG-DP =(i) 8202 pies x ( ii ) 0.0516 Bl/pié = 422.91 bls. ( 3.2a )
b. DP-2 OH - DP =(i) 4598 pies x ( ii ) 0.0459 Bl/pié = 211.13 bls. ( 3.2b ) VI GRAFICO DE MATAR EL POZO: ( VER METODOS EN PAGINA 2 )
c. HW-1 OH - HW =(i) pies x ( ii ) Bl/pié = bls. ( 3.2c )
d. DC-1 OH - DC =(i) 700 pies x ( ii ) 0.0352 Bl/pié = 24.66 bls. ( 3.2d ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
3000
e. DC-2 OH - DC =(i) pies x ( ii ) Bl/pié = 0.00 bls. ( 3.2e )
f. DC-3 OH - DC =(i) pies x ( ii ) Bl/pié = 0.00 bls. ( 3.2f ) 2500
- Volúmen Total 13500 658.70 BLS.(3.2)
Bit to Surface, Bbls. = 658.70 bls.(3.2) ¸ 0.1244 BPS = 5,294 Strokes 2000
PIC 2000 1916 1833 1749
3.3 VOLUMEN TOTAL DE LODO EN CIRCULACION: = 1666 1582
1500 1499 1415
- Volúmen (3.1) = 230.16 bls. VER 1331 1248 1164
- Volúmen (3.2) + = 658.70 bls. 1000
5.2
- Volúmen del tanque de lodo activo + = 500.00 bls.
500

Volúmen Total = 1388.9 BLS.(3.3) 0


0 STROKES ¸ 10 3.1.e
(*) : Si se utiliza una valvula ciega tipo "GC"= Medir "SIDPP" en circulacion lenta con bomba a "EPM" minima. O 185 370 555 740 925 1110 1295 1480 1665 1850
2000 1916 1833 1749 1666 1582 1499 1415 1331 1248 1164
REFERIRSE A LAS INSTRUCCIONES EN PAGINA 2 ICP PRESION ¸ 10 FCP
GERENCIA DE OPERACIONES
DEPARTAMENTO DE PERFORACION
Volúmen Total Del Pozo
FECHA ANOTADO: 14-Jul-04

POZO: RH3 TALADRO: PRIDE No. 16

I CARACTERISTICAS DEL POZO:


PROFUNDIDAD DEL POZO TVD = 13,000' Medida = 13,500' pies

REVESTIDOR: Profundidad TVD = 8,202' Medida = 8,202' ,Æ 7 7/8 '' Peso 40.0

DIAMETRO DEL POZO = 8 1/2 plgs. DIAMETRO INTERNO - REVESTIDOR = 8.835 plgs.

II PARAMETROS DE BOMBEO:
Camisa STROKE: 11.0 in KRP KRS
7.0 Capacidad "BPS" Presion / Velocidad Reducida de Bombeo
-Bomba 1 0.1244 BPS 1000 psi / 80 SPM / 9.95 BPM
-Bomba 2 0.1244 BPS 1100 psi / 90 SPM / 11.20 BPM
Eff.% .95

III PARAMETROS VOLUMETRICOS:


- VOLUMEN INTERIOR TUBERIA:
a. DP-1 OD 5.00 plgs. ID = 4.276 ins x 8202 pies = 145.74 bls.
b. DP-2 OD 5.00 plgs. ID = 4.276 ins x 4598 pies = 81.70 bls.
c. HW-1 OD 5.00 plgs. ID = 3.000 ins x pies = 0.00 bls.
d. DC-1 OD 6.00 plgs. ID = 2.000 ins x 700 pies = 2.72 bls.
e. DC-2 OD plgs. ID = 0.0000 ins x 0 pies = 0.00 bls.
f. DC-3 OD plgs. ID = 0.0000 ins x 0 pies = 0.00 bls.
Volúmen Total 13,500 230.16 bls.

Surface to bit, Bbls. = 230.16 BLS. ¸ 0.1244 BPS = 1850 STB, Strokes

- VOLUMEN ESPACIO ANULAR:


a. DP-1 CSG-DP = ( i ) 8202 pies x ( ii ) 0.0516 Bl/pié = 422.91 bls.
b. DP-2 OH - DP = ( i ) 4598 pies x ( ii ) 0.0459 Bl/pié = 211.13 bls.
c. HW-1 OH - HW = ( i ) 0 pies x ( ii ) 0.0459 Bl/pié = 0.00 bls.
d. DC-1 OH - DC = ( i ) 700 pies x ( ii ) 0.0352 Bl/pié = 24.66 bls.
e. DC-2 OH - DC = ( i ) 0 pies x ( ii ) 0.0702 Bl/pié = 0.00 bls.
f. DC-3 OH - DC = ( i ) 0 pies x ( ii ) 0.0702 Bl/pié = 0.00 bls.
13,500
Volúmen Total = 658.70 BLS.
Bit to Surface, Bbls. = 658.70 BLS. ¸ 0.1244 BPS = 5294 BTS, Strokes

- VOLUMEN TOTAL DE LODO EN CIRCULACION:


Volumen Circ. Completa = 888.87 BLS. ¸ 0.1244 BPS = 7144 Strokes Tot.
- Volúmen Interior de Tuberia = 230.16 bls.
- Volúmen Espacio del Anular + = 658.70 bls.
- Volúmen Tanques Activos + = 500.00 bls.

Volúmen Total = 1388.9 BLS.


KICK TOLERANCE
DET. Hg max. BY BELOW SHOE F/ WHEN SICP = MASCP
PH loss must to be according to the PG.

FECHA ANOTADO: 6-Oct-04

POZO: TALADRO: PRIDE No. XX


Frac.P @ shoe 1364 Gas cut mud
I MASCP (LOT) 299 P. increase / hr 400 gas trapped? How was it close?
400 Gas g
Normal Pore P. 0,442 (8,5 ppg)
Hydrostatic 4258
TVD shoe 2132
TVD 8530
MD 8530
Ann. Capacity oh-dp 0.273
II Ann. Capacity oh-dc 0.210
Sub-balance 0.500 0.400 0.300 0.200 0.176 0.000
SIDPP 222 177 133 89 78 0
OMW 9.6 9.6 9.6 9.6 9.6 9.6
Mud Gradient 0.4992 0.4992 0.4992 0.4992 0.4992 0.4992
SICP- SIDPP > 0 (if < 0 ?) 78 123 167 211 222 300
hg bottom 197.4 311 423 534 562 759
Vol. bottom 41.5 68.4 99.0 129.3 136.9 190.7
Second Pit Gain actual 16.4 25.9 35.0 44.5 46.6 63.1
Vg '= 0,104'= 2,0 ppg Cte. 0.104 0.104 0.104 0.104 0.104 0.104
PH loss in all the 78 123 167 211 222 276
4480-1364 PH down 3116 3116 3116 3116 3116 3116
Heq 6242 6242 6242 6242 6242 6242
First Vshoe > V bottom(hg*cap. an DP) 53.9 85 115 146 153 207.2
hg shoe > hg bottom (no cte?) 197 311 421 535 560 759
Pg shoe'=Vg*hg 20 32 44 56 58 79
1364-20 P. top bubble 1344 1332 1320 1308 1306 1285
Hup. top bubble(shoe @ 2132') 2091 1977 1867 1753 1728 1530
Pheq 1044 987 932 875 863 764
1344-1044 SCP, when bubble in the shoe 300 345 388 433 443 521

H max possible 759 759 759 759 759 759


Po en DP 4480 4435 4391 4347 4336 4258
Po en anular(use only 4480?) 4480 4436 4392 4347 4337 4258

PH loss must to be according to the PG.


hg by below shoe for when SICP= MASCP
Every column is a survey
Overburden '=OBP '= 1 psi/ft
Hacer chequeos con kwm
APL use date hydraulic.
sidpp high then Po high
KICK TOLERANCE à
PH loss basement
Sub-bce Sub-bce PH loss hg Vkick Vshoe V.corr Vshoe
sidpp/(0,052 sidpp sicp- sidpp
PH loss/0,3952
hg*an.DC hg*an.DP Vshoe*1364/4480
ppg psi psi ft 0,21*262' 0.273 à
>0
0.676 300.0 0.0 0.0 0.0 0.0 0.0 0.0
0.600 266.0 34.0 86.0 18.1 23.5 7.2 23.6
0.500 222.0 78.0 197.4 41.5 53.9 16.4 53.9
0.400 177.5 122.5 310.0 68.1 84.6 25.8 84.7
0.300 133.0 167.0 422.6 98.8 115.4 35.1 115.3
0.200 88.5 211.5 535.2 129.6 146.1 44.5 146.2
0.176 78.0 222.0 561.7 136.8 153.3 46.7 153.4
0.000 0.0 300.0 759.1 190.7 207.2 63.1 207.2 Warning!

KICK TOLERANCE
1.000

0.900

0.800 MASCP : 300 psi


Gas Grad.: 0,104
0.700
Sub-balance, ppg

0.600

0.500

0.400

0.300

0.200

0.100

0.000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0

Kick size, Bbls.

gráfico wo/decimales use Opciones de Grafico 4480x 41,45 '= 1364x53,9


kwm: 9,6+2,0: 11,6 didn't include
197,4x0,21 197,4 x 0,273 No!
78 x 0,21 197,4x0,273 Sí!

4480 x 16,4 '= 1364x 53,9


GERENCIA DE OPERACIONES
DEPARTAMENTO DE PERFORACION
KICK DETECTION
FECHA ANOTADO: 14-Jul-04

POZO: RH3 TALADRO: PRIDE No. XX


MD= 13500 TVD= 13000
I pit gain 75
INFLUX TYPE
Height of influx-TVD 1800
Influx Gradient 0.2458
Influx Density 4.72
Influx Type Gas/ oil
Pg 442
H' 11200
II Pheq 5242
SCP 1400
Ann. Capacity 0,0352
OMW 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
GRAD. MUD 0.468 0.468 0.468 0.468 0.468 0.468 0.468 0.468
SICP - SIDPP 400 400 400 400 400 1550 400 400
PIT GAIN 25 30 32 35 70 175.5 83 92
hg( igual BHA 710 852 863 928 1691 3989 2358 2614
III GRAD. GAS -0.09538 -0.001484 0.0045006 0.0369655 0.2314536 0.0794314 0.2983647 0.31497781
PH loss bottom 0 400 400 400 1550 400 400
bubble bottom 795
PH down 695 695 695 695 695 695 695 695
Heq 1485 1485 1485 1485 1485 1485 1485 1485
Vshoe 28 33 35 39 78 195 92 102
hg shoe 795 938 763 850 1699 4259 2614 2898
Pg shoe -76 -1 3 31 392 336 779 913
P. top bubble NEG NEG 6386 6358 5997 6053 5610 5476
Hup. top bubble 10752 10665 9816 7256 8901 8617
Pheq 5032 4991 4594 3396 4166 4033
SCP, when bubble in the shoe 1354 1367 1403 2657 1444 1443
PH loss when bubble in the shoe 354 366 402 1655 443 443
H max possible(falso) 5502 5916 10780 4258 9137 10129
3344 3596 6553 3989

hg tiene que ser mayor de 400 /0,468 or 855 pies/ then 25/0,0352+ 6,67/0,0459 es 32 bls, 855 pies
7084x32/6389 es 35,5 bls or 35,5/0,0459 es773 pies
7084x40/6389 es 44,35 bls or 44,35/0,0459 es 966 pies
9.0 9.0 9.0
0.468 0.468 0.468
400 400 400
92 102 113
2614 2898 3210
0.31497781 0.3299738 0.343389408
400 400 400

695 695 695


1485 1485 1485
102 113 125
2898 3210 3551
913 1056 1218
5476 5333 5171
8617 8305 7964
4033 3887 3727
1443 1446 1444
443 443 443
10129 11230 12439
GERENCIA DE OPERACIONES
DEPARTAMENTO DE PERFORACION
KICK DETECTION
FECHA ANOTADO: 14-Jul-04

POZO: RH3 TALADRO: PRIDE No. XX


MD= 13500 TVD= 13000
I MUD DATA LEAK OFF TEST W/ 9,0 ppg KICK CONTROL
CSG.SHOE @ 8202
OMW 9.0 EMW 14.98 KWM 10.48
MUD GRADIENT 0.468 FRAC GRADIEN 0.7789 KWM GRADIENT 0.545
HYD. P. SHOE 3839 FRAC. P. SHOE 6389 FRAC. P. SHOE 4469
MASCP 2550 MASCP 2550 MASCP 1919
PORE PRESSUR 7084 FRAC.PRESSUR 10126 HYD. PRESSUR 7084
HYD. PRESSUR 6084
II

III

in annulus at any position


between bottom hole & csg. Shoe
MAX. KICK HEIGHT POSSIBLE
KICK DATA INFLUX TYPE NOT TO EXCEED MASCP
SIDPP 1000 Actual height of influx-TVD 1796 Max. height of influx-TVD 4258
SICP 1400 Influx Gradient 0.2453 KICK TOLERANCE GRAD. 0.104
PIT GAIN 75 Influx Density 4.72 KICK TOLERANCE DENSITY 2
ΔSICP / HR 400 Influx Type Gas / oil Influx Type Gas
NORMAL GRADI 0.442 Minim. height of influx-TVD 1099 Max. Pit Gain when shut in 188
Overburden,OBP 1.00 Volumen en el shoe 50 Max.Vol. in, OH-DP 195
BHA Length 710 Vol shoe al cierre 45 Max.Vol.equival.in the shoe 176
Top of the Influx, TVD 11205 Top of the Influx, TVD 8742
GERENCIA DE OPERACIONES
DEPARTAMENTO DE PERFORACION
Volúmen Total Del Pozo
FECHA ANOTADO: 25-Apr-01

POZO: REVANCHA 5H TALADRO: PRIDE No. 16

I CARACTERISTICAS DEL POZO:


PROFUNDIDAD DEL POZO Vertical = 5,073' Medida = 6,035' pies

REVESTIDOR: Profundidad Vertical = 4,955' Medida = 5,465' ,Æ 7 7/8 '' Peso 47.0

DIAMETRO DEL POZO = 8 1/2 plgs. DIAMETRO INTERNO - REVESTIDOR = 8.681 plgs.

II PARAMETROS DE BOMBEO:
Camisa STROKE: 9 PULG.
5 1/2 Capacidad "BPE" Velocidad de Bombeo
-Bomba 1 0.0628 BPE 89 EPM = 5.59 BPM
-Bomba 2 0.0628 BPE 0 EPM = 0.00 BPM
-Bomba 3 0.0628 BPE 89 EPM = 5.59 BPM
Eff.% .95 89 EPM TL. = 5.59 BPM TL.

III PARAMETROS VOLUMETRICOS:


- VOLUMEN INTERIOR TUBERIA:
a. Dp 5 DE = 5 plgs. D I = 4.2760 plgs. x 1,128 pies = 20.04 bls.
b. Dc 6 DE = 6 1/2 plgs. D I = 2.7500 plgs. x 342.00 pies = 2.51 bls.
c. Hw DE = 5 plgs. D I = 3.0000 plgs. x 330.00 pies = 2.89 bls.
d. Dp 5 DE = 5 plgs. D I = 4.2700 plgs. x 4103.60 pies = 72.71 bls.
e. tools DE = 6 1/2 plgs. D I = 3.5000 plgs. x 131.70 pies = 1.57 bls.

Volúmen Total = 99.72 BLS.


Emboladas de Bomba = 99.72 BLS. ¸ 0.0628 BPE = 1,587 Emb.
- VOLUMEN ESPACIO ANULAR:
a. Dp 5 csg =(i) 1,128 pies x ( ii ) 0.0459 BPP = 51.80 bls.
b. Dc 6 csg =(i) 342.00 pies x ( ii ) 0.0292 BPP = 9.97 bls.
c. Hw csg =(i) 330.00 pies x ( ii ) 0.0459 BPP = 15.15 bls.
d. Dp 5 csg =(i) 3665.30 pies x ( ii ) 0.0459 BPP = 168.30 bls.
e. Dp 5 hole =(i) 438.30 pies x ( ii ) 0.0459 BPP = 20.13 bls.
f. tools hole =(i) 131.70 pies x ( ii ) 0.0292 BPP = 3.84 bls.
Volúmen Total = 265.35 BLS.
Emboladas de Bomba = 265.35 BLS. ¸ 0.0628 BPE = 4,222 Emb.
- VOLUMEN TOTAL DE LODO EN CIRCULACION:
- Volúmen Interior de Tuberia = 99.7 bls.
- Volúmen Espacio del Anular + = 265.4 bls.
- Volúmen Tanques Activos + = 735.0 bls.

Volúmen Total = 1100.1 BLS.


GERENCIA DISTRITAL ANACO
Documento
GERENCIA DE PERFORACION Elaborado por el
Grupo CTOPPAR
HOJA PARA CONTROL DE ARREMETIDAS Multidisciplinario

corpoven - PAGINA 1 -
POZO: TALADRO: H & P - 45

ANOTE POR ADELANTADO FECHA ANOTADO: DATOS DEL INFLUJO FECHA DEL EVENTO:

I CARACTERISTICAS DEL POZO: IV GRABACION DE LOS PARAMETROS AL MOMENTO DEL EVENTO:


1.1 PROFUNDIDAD DEL POZO; Vertical = pies "PVP" / Medida = pies "PMP" 4.1 PRESION DE CIERRE DE LOS TUBOS DE PERFORACION "PCTP" = 0 LPC ( * )
1.2 PESO ORIGINAL DEL LODO "POL" = LPG 4.2 PRESION DE CIERRE DEL REVESTIDOR "PCR" / PMAS (1.5) = 0 LPC/ #VALUE! LPC
1.3 REVESTIDOR: Profundidad "PVR" = pies / "PMR"= ,Æ Peso 4.3 Volúmen de la ganancia en el tanque activo = 0 bls.
1.4 PRUEBA INTEGRIDAD DE FUGA "PIF"= PC a con LPG= #VALUE! E.LPG 4.4 Pesos del lodo "entrante" / "saliendo" = LPG / 0.0 LPG
1.5 PRESION MAX. ADMISIBLE EN SUPERFICIE "PMAS" #VALUE! LPC con "POL" LPG 4.5 Profundidad de la mecha = pies "PVM" / pies "PMM"
- DIAMETRO DEL POZO = plgs. DIAMETRO INTERNO - REVESTIDOR = plgs. 4.6 Válvula flotadora CG / CA en la sarta: NO / SI (*)
Landing sub en la sarta: NO / SI - Profundidad #VALUE! pies
II PARAMETROS DE BOMBEO: 4.7 Origen de la "Venida": "Drilling break" / Viaje Ý ß / Perdidad / Otro
Camisa "PRB" "VRB"
Capacidad "BPE" Presion / Velocidad Reducida de Bombeo V CALCULOS DEL CONTROL DE POZO:
-Bomba 1 #VALUE! BPE LPC / EPM / #VALUE! BPM 5.1 PESO DE LODO DE MATAR = ( PCTP ) +POL = 0 + = #VALUE! LPG
-Bomba 2 #VALUE! BPE LPC / EPM / #VALUE! BPM REQUIERIDO "PLM" 0.052 x PVM 0.052 x
Eff.%
5.2 SI PLM ES MAYOR QUE (PIF-0.1), EFECTUAR "STRIPPING" HASTA PROFUNDIDAD:
III PARAMETROS VOLUMETRICOS: PCTP pies = 0 pies = #VALUE! pies
3.1 VOLUMEN INTERIRO TUBERIA: [ (PIF-0.1) - POL ] x 0.052 #VALUE!
a. T P DE = plgs. D I = plgs. x #VALUE! pies = #VALUE! bls. Y CONTROLAR POZO CON PLM = (PIF - 0.1) A ESTA PROFUNDIDAD
b. H W P DE = plgs. D I = plgs. x pies = #VALUE! bls. (VER PROCEDIMIENTO DE "STRIPPING EN PAGINA 2)
c. P M DE = plgs. D I = plgs. x pies = #VALUE! bls. - BOMBA NO.
d. P M DE = plgs. D I = plgs. x pies = #VALUE! bls. 5.3 PRESION INCIAL DE = PCTP + PRB = 0 + = #VALUE! LPC
CIRCULACION "PIC"
- Volúmen Total = #VALUE! BLS.(3.1)
e. Emboladas de Bomba = #VALUE! bls.(3.1) ¸ #VALUE! BPE = #VALUE! Emb. 5.4 PRESION FINAL DE = PRB x PLM = x #VALUE! = #VALUE! LPC
3.2 VOLUMEN ESPACIO ANULAR: CIRCULACION "PFC" POL
a. P. M. - Hueco =(i) pies x ( ii ) 0.0000 BPP = #VALUE! bls. ( 3.2a )
b. P. M. - Hueco / Rev. =(i) pies x ( ii ) 0.0000 BPP = #VALUE! bls. ( 3.2b ) VI GRAFICO DE MATAR EL POZO: ( VER METODOS EN PAGINA 2 )
c. H.W.P. - Hueco / Rev. =(i) pies x ( ii ) 0.0000 BPP = #VALUE! bls. ( 3.2c )
3500
d. T.P. - Hueco = ( i ) #VALUE! pies x ( ii ) 0.0000 BPP = #VALUE! bls. ( 3.2d ) Emboladas
e. T.P. - Revestidor =(i) pies x ( ii ) 0.0000 BPP = #VALUE! bls. ( 3.2e ) 3000 Presion

2500
- Volúmen Total = #VALUE! BLS.(3.2)
f. Emboladas de Bomba = #VALUE! bls.(3.2) ¸ #VALUE! BPE = #VALUE! Emb. PIC
2000 2000 1916 1833 1749 1850
3.3 VOLUMEN TOTAL DE LODO EN CIRCULACION: = 1666 1665
1500 1582 1499 1480
- Volúmen (3.1) = #VALUE! bls. VER 1415 1331
1295 1248
1110 1164
- Volúmen (3.2) + = #VALUE! bls. 5.2
1000 925
- Volúmen del tanque de lodo activo + = 0.0 bls. 740
500 555
370
185
Volúmen Total = #VALUE! BLS.(3.3) 0
0 EMBOLADAS ¸ 10 3.1.e
(*) : Si se utiliza una valvula ciega tipo "GC"= Medir "PCTP" en circulacion lenta con bomba a "EPM" minima. O #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
REFERIRSE A LAS INSTRCCIONES EN PAGINA 2 PIC PRESION ¸ 10 PFC

Anda mungkin juga menyukai