1. Circulate pumps to blender Fill only the yellow cells !

2. Pressure test to 600 bar


3. Open well
4. Pump 4.3 m3 linear gel
Pump rate 1.5 m3/min
5. Step down with linear gel
Volume 11 m3
6. Reset counters
Pump rate 3 m3/min 1250 Tubing depth

7. Pump Job 15 m x linked gel


3

Flush Top Perfs 4.3 m3 linear gel 1283 Top perforations

8. Wait until closure 1303


Bottom perforations
1310 Plug back depth

Total; Volume Pumped 47.2 m 3

Casing volumes
OD inches Wall mm OD mm Area, m2
5 7.70 127.00 0.009777
Minifrac Calculation 5 1/4 7.70 133.35 0.010921
5 1/2 6.99 139.70 0.012407
Under Flush 5 3/4 7.70 146.05 0.013399
Casing 0.018346 [m3/m] or m2 6 3/4 7.70 171.45 0.019116
Tubing 0.002585 [m3/m] or m2 6 5/8 7.70 168.28 0.018346
BH (plug back depth) 1310 [m] 7 10.36 177.80 0.019369
Tubing Depth 1250 [m] 8 5/8 7.70 219.08 0.032565
TOP Perforations 1283 [m] 9 5/8 13.9 244.48 0.036854
BOT Perforations 1303 [m] Tubing volumes
Hole Fill 4 [m3] OD inches Wall mm OD mm Area, m2
Step up 10 [m3] 2 7/8 7.82 73.03 0.002585
Step down 11 [m3] 3 1/2 6.70 88.90 0.004475
Minfrac Volume 18 [m3] 2 3/8 9.52 60.33 0.001338
Flush Top Perf. 4 [m3]
Total Pumped 47.2 [m3] Vol. with proppant 0.367 m3
ALWAYS COMPARE CA
VOLUMES WITH A
HANDBOOK!!!
Fill only the yellow cells !

WGA-20 OC CL20
3.6 kg 3600 g 0.5 l 500 ml/1l
1000 l 1000 l
3.6 g/1l 0.5 ml/1l
1000 ml 1000 ml
0.0036 g /ml 0.0005 ml /ml
0.72 g/200 ml 0.1 ml/200 ml

OC APS OC CS-11
0.25 kg 250 g 3 l 3000 ml/1l
1000 l 1000 l
0.25 g/1l 3 ml/1l
1000 ml 1000 ml
0.00025 g /ml 0.003 ml /ml
0.05 g/200 ml 0.6 ml/200 ml

DRB-HT OC DE11
0.25 kg 250 g 2 l 2000 ml/1l
1000 l 1000 l
0.25 g/1l 2 ml/1l
1000 ml 1000 ml
0.00025 g /ml 0.002 ml /ml
0.05 g/200 ml 0.4 ml/200 ml

CMHPG OC TEA
0 kg 0 g 0 l 0 ml/1l
1000 l 1000 l
0 g/1l 0 ml/1l
1000 1000 ml
0 g /ml 0 ml /ml
0 g/200 ml 0 ml/200 ml

OC TS11
0 kg 0 g 0 l 0 ml/1l
1000 l 1000 l
0 g/1l 0 ml/1l
1000 1000 ml
0 g /ml 0 ml /ml
0 g/200 ml 0 ml/200 ml

0 kg 0 g 0 l 0 ml/1l
1000 l 1000 l
0 g/1l 0 ml/1l
1000 1000 ml
0 g /ml 0 g /ml
0 g/200 ml 0 g/200 ml
1. Circulate pumps to blender
2. Open well Fill only the yellow cells !
3. Put the whole quantity of necessary sand in the blender's tab and mix with gel
4. Pump in the well that quantity of sand followed by liniar gel to displace
5. Total gel pumped 10.7 m3 gel
Pump rate 1 m3/min
Bulk density proppant 1610 kg/m3
Abs. density proppant 2650 kg/m3

Calculation

Casing 0.036888 [m3/m] or m2 2450 Tubing depth


Tubing 0.004327 [m3/m] or m2
BH (plug back depth1) 2814 [m]
Tubing Depth 2450 [m] 2500 Bottom perforations (plug back d

BOT Perforations 2500 [m]


Volume of S.Plug 11.58 [m3] 2814 BH (plug back depth1)
Mass of proppant 18648 kg Casing volumes
[m3] OD inches Wall mm OD mm Area, m2
[m3] 5 7.70 127.00 0.009777
Tubing volume 10.6 [m3] 5 1/4 7.70 133.35 0.010921
Flush 10.6 [m3] 5 1/2 7.70 139.70 0.012129
Total Flush 10.7 [m3] 5 3/4 7.70 146.05 0.013399
6 3/4 7.70 171.45 0.019116
injection line length 30 m 6 5/8 7.70 168.28 0.018346
injection line volume 0.1 m3 9 5/8 13.85 244.48 0.036888
Tubing volumes
OD inches Wall mm OD mm Area, m2
2 7/8 7.72 73.03 0.002603
12.653886 20372.76 3 1/2 7.33 88.90 0.004327