LEGEND

GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X INDICATOR LIGHT


WITH COVER (LIGHTING/EFM/ICT) P - PRIVILEGED
GALVANIZED STEEL CABLE TRAY, PROTECTION IP2X I - ICT
WITH COVER (SAFETY/SECURITY) M - MEDICAL
TRUNKING PROTECTED REI 120 ME - MEDICAL EQUIPMENT
AHU - HVAC
ALUMINIUM BUSBAR GE - DIESEL GENERATOR
COMPARTEMENT
ALUMINIUM BUSBAR DUCT IN SHAFT FIRE RESISTANT REI 120

FIRE BARRIER PASS-TROUGH


EL.. SERVICE SHAFT

SMSB SUB MAIN SWITCH BOARD

FDB FINAL DISTRIBUTION BOARD ED01


MEB MEDICAL EQUIPMENT BOARD
MDB MEDICAL DISTRIBUTION BOARD IDENTIFICATION OF COMPARTMENT
FIRE PROTECTION
SDB SUB DISTRIBUTION BOARD PROGRESSIVE ITEM
LEVEL INDICATION:
TELECOMMUNICATIONS CABINET FOR DATA & TELEPHONE Z - ROOF TOP I - 3rd FLOOR
A - 11th FLOOR L - 2nd FLOOR
VERTICAL DIRECTIONAL INDICATION BUSBAR B - 10th FLOOR M - 1st FLOOR
C - 9th FLOOR N - GROUND FLOOR
VERTICAL DIRECTIONAL INDICATION D - 8th FLOOR O - BASEMENT 01
E - 7th FLOOR P - BASEMENT 02
EQUIPOTENTIAL NODE F - 6th FLOOR Q - BASEMENT 03
G - 5th FLOOR R - BASEMENT 04
JUNCTION BOX H - 4th FLOOR

PIPELINE SECTION DETAILS: 10H00574PE_DD_MH_HV_D_0044_00

EMERGENCY VOLTAGE SHUT DOWN PUSH BUTTON

NOTE
1. LAYOUTS SHALL BE VERIFIED WITH FINALISED ARCHITECTURAL AND STRUCTURAL DRAWINGS. LAYOUTS HERE ARE FOR REFERENCE ONLY.

KEY-PLAN DISTRIBUTION SPECIAL SYSTEMS ZONES


HD01 HE01

M18
(300 x 560)
M19
(285 x 552)

SMK 18 SMK 19
(140 x 734) (140 x 742)

L01 L02 L03 L04 L05 L06

+108.40
DISTRIBUTION CABINET ZONE

C.01
+112.90 +112.90

Corridor
7266

P-I AHU
Corridor
7264

P(m) A(m²) H(m)


30.4 40.6 2.50
P(m) A(m²) H(m)
30.4 40.6 2.50

P-I AHU
CABINET - FD.04A
L4-C01 L4-C01
CABINET - FD.04B

SDB4.1.01 SMSB.L4.2

FD04A
FD04B
Data & Tele-Comunications
Room

KEY-PLAN DISTRIBUTION ELECTRICAL SERVICE ZONES


Data & Tele-Comunications S4 3095

HA01
Room P(m) A(m²) H(m)
3094
P(m) A(m²) H(m)
S3 9.6 5.4 0.00

8.8 4.7 0.00

SDB4.1.00
EL1 EL2
Data & Tele-Comunications

SMK 16
Room
7190
Data & Tele-Comunications
SDB4.2.00 SMK 17
Room
(250 x 651) P(m) A(m²) H(m)
7189 (265 x 599)
13.1 10.2 0.00
P(m) A(m²) H(m)
12.7 9.5 0.00
E1
(247 x 85) E2
(263 x 85)

SMSB.L4.1
HN01 HO01 SDB4.2.01

Corridor
7263
P(m) A(m²) H(m)
29.9 37.8 2.50 Corridor
7265

M16 P(m) A(m²) H(m) M17


29.9 37.8 2.50
(407 x 522) Technical Area
(399 x 530)
7284

P(m) A(m²) H(m)


546.1 5311 0.00

+117.40 +117.40

L07 L08 L09 L10 L11 L12 L13 L14

HC01 HB01 HM01 HI01 HF01


Corridor Corridor
3045 3047

P(m) A(m²) H(m) P(m) A(m²) H(m)


11.2 5.7 2.50 11.2 5.7 2.50

L22

EL3
Data & Tele-Comunications
Room
7191

HL01
P(m) A(m²) H(m)
16.7 15.5 0.00 M27
(215 x 94)

SMK 1 SMK 1
(248 x 435) (248 x 435)

S5 S6

DISTRIBUTION BOARD ZONE

SDB4.1.01
Technical
HG01
Area
3074
92.5 m²

HP01
HK01 HJ01 SDB4.2.01
HQ01

M22 M21
(310 x 559) (303 x 525)

M22
(310 x 110)

HH01
Corridor Corridor
GENERAL NOTE:
3046 3048

All measurements are to be checked and verified on site by the Contractor before proceeding with the works.
P(m) A(m²) H(m) P(m) A(m²) H(m)
13.4 10.5 2.50 13.9 11.4 2.50

Do not scale the drawings.


Measures are cm unless otherwise noted.
Corridor
7283
Corridor
7282
Corridor
7281
Corridor
7280
P(m) A(m²) H(m)
This document must be read in conjunction with all other design documents and related guidelines codes and regulations.
All items shall be sized and selected as per actual loads for the selected equipment, maintaining proper performace requirements
P(m) A(m²) H(m) 9.2 5.1 2.50
P(m) A(m²) H(m) P(m) A(m²) H(m) 9.1 5.1 2.50
9.2 5.1 2.50 9.1 5.1 2.50

SMK21
(165 x 177)

TRANSMITTAL NO.: DATE:


SMK20
(165 x 177)
L18 L19 L20 L21

S7
M11 S9
M10 (433 x 130)
(294 x 120)

ACTION FROM THE ENGINEER REPRESENTATIVE:


A: NO OBJECTIONS Checking is only for conformity with the design concept of
project and compliance with the information given in the
contract documents contractor is responsible for dimensions to
B: NO OBJECTIONS SUBJECT TO INCORPORATION OF ALL COMMENTS be confirmed and correlated at the job site for the information
that pertains solely to the fabrication process or to techniques of
C: REJECTED, TO BE RESUBMITTED construction and for the co-ordination of the work of all trades.

01 JUL. 2015 REVISION AFTER WORKSHOP

00 FEB. 2015 SUBMISSION

REVISION DELIVERY DESCRIPTION DRAWN CONTR. APPR.

PHASE 4:

FINAL DESIGN

DRAWING TITLE:

MAIN ELECTRICAL LOW AND MEDIUM VOLTAGE DISTRIBUTION


4th FLOOR

PROJ. CODE

1 0.H. 0 0 5 7 4.P C
DRAWING CODE

F D .M H .E L .D .0 0 2 3
REVISION SCALE

0 1 1:200

LOCATION
KUWAIT - KUWAIT CITY