Rekap Vol Harga Rutin JBT
Rekap Vol Harga Rutin JBT
HARGA
No. Mata
Uraian PEKERJAAN
Pembayaran
(Rp)
Terbilang : Sembilan Ratus Tiga Puluh Juta Tiga Ratus Lima Ribu Rupiah,-
* Keterangan : PPN 10% untuk Bahan/Material, Bahan Bakar, Pelumas diperhitungkan pada lembar Basic Price
Disusun Oleh,
St 1 Pembersihan Jembatan m2 102,800.00 2,946.03 2,508.57 0.00 10.65 334.60 20.63 71.57 257,881,142.86 - 1,095,153.85 34,397,103.22 2,121,025.41 7,357,542.86 302,851,968.20
Bronjong m3 825.50 623,214.91 109,250.00 513,425.00 539.91 - - - 90,185,875.00 423,832,337.50 445,698.65 - - - 514,463,911.15
-
Pasangan Batu m3 55.04 666,975.53 55,823.29 593,237.24 - 14,128.86 1,040.92 2,745.22 3,072,514.06 32,651,777.55 - 777,652.67 57,292.44 151,096.71 36,710,333.42
-
Beton mutu sedang , K-300 m3 1.54 1,504,335.42 64,257.03 1,422,163.38 - 14,128.86 1,040.92 2,745.22 98,634.54 2,183,020.79 - 21,687.81 1,597.82 4,213.91 2,309,154.86
-
Timbunan Pilihan m3 140.00 256,051.80 46,015.90 112,410.94 - 66,291.84 4,061.27 27,271.86 6,442,226.05 15,737,531.04 - 9,280,857.45 568,577.54 3,818,060.24 35,847,252.32
-
Perbaikan Sandaran (Railing) m' 12.00 86,980.37 19,600.00 67,380.37 - 235,200.00 808,564.48 - - - - 1,043,764.48
DIBULATKAN 930,305,000.00
514,463,911.15
36,710,333.42
2,309,154.86
35,847,252.32
Disusun Oleh,
-
Pejabat Pembuat Komitmen (PPK 03)
1,043,764.48
Koridor Bts Kota Kolaka - Lasusua
893,226,384.43
982,549,022.88