Module Title
Drilling Engineering I
Module Leader Semester Fall
Dr.Eng. Taher El-fakharany 2016
Key words:
Well design , Drill string, Bottom hole assemblies(BHAs), well planning, rig ,drill
pipe, drill collar, casing, drilling fluids, mud, derrick, hoisting system, Bits.
Assignment (3)
Plot the overburden pressure Vs depth and find the overburden pressure
gradient at 3000, 5000 and 7000 ft.
3- Determine the load on the crown block if the dead end of the drilling line is
fixed :
a- to the leg of the derrick
b- to the travelling block
c- to the crown block.
Given that: the travelling block has 4 sheaves, load on hook Wh = 100 tons.
Friction can be neglected.
4- Determine the load on the four legs of the derrick when the dead end of the
line is fixed:
a- Based the draw works ( 1 m far away from the leg)
b- at the opposite side of the draw works.
c- to the leg of the derrick opposite to the draw works.
Given data are the same as in problem No. 3 & square base of the derrick is 8*8
m.