Anda di halaman 1dari 2
Length, overall Length Breadth, moulded Depth, moulded Draught, moulded Displacement Dead weight Gross tonnage Net tonnage Load carrying capacity S000T The main deckis designed to carry uniformed load 12T/m? ‘ rise ————— EQUIPME! Mooring arrangement: Mooring rope: Mooring rope ( steel wire ropes ) 24 mm (6x12) x 180 mx 4 set, breaking load 188 kN or mooring rope { synthetic fibre rope) ©40 mm (Polyethylene) grade 2 has equivalent breaking load, breaking load 164 kN. Bollard Bollard (35x18 to be A grade steel or other steal to be the same mechanical property. Each side is arranged 5 double bollards 355 x 18 welded with main deck. Fore and aft end barge to be equipped 4 fairlearders, Towing arrangement — towsline cable: Barge to be transferred by tugboat. need be tugged, barge will use 2 towknees as towing post on fore. Navigation light and signal: Navigation light 4 starboard side light (green) a= 1125, |= 3 mie 1 port side light (red) a= 1125, 4 mile 1 stem light (white) a= 135 3 mile 2 not- under-command lights (red) a= 360 , 3 mile 4 A-direction seeing lights (white) a = 360° 3 mile ‘11 daytime signal light ( white, portable type) a = 360° , |= 3 mile ‘With: a [degree]: bright angle of the light in horizontal plane. | [mile]: bright visibility of the light in horizontal plane. Shapes 3 black balls (600mm) 1 black lozenge signal (long side: 1,2 m, short side: 0,6 m) Baffle plate: ‘To move stably, aft of barge put 2 baffle plates. Baffle plate available in box form, to be reinforced by stiffeners, thickness of plating t = 12. Other equipment: Arrange covers 400x600 to go up and down holds. ladders follow covers to be convenient for going up and down to test, maintain inner- Arrange verties bottom holds of barge. rofessional ne-stop ervices

Anda mungkin juga menyukai