TAMPAK DEPAN YANG SUDAH ADA NANTI AKAN BERTAHAP GANTI DENGAN YANG BARU, YANG BARU NANTI
FORMATNYA AKAN 3D (3 DIMENSI), LOGO DANA CEPAT (LINGKARAN MERAH) AKAN MENONJOL KE DEPAN
2 BANNER POHON
UKURAN MINIMAL MIN CETAK
75cm X 50 cm 50
BIAYA MAKSIMAL Rp 10.000 / pcs
3 SPANDUK WARUNG
DESIGN UKURAN MIN CETAK
BESAR 1m X 4m 10
SEDANG 1m X 3m
KECIL 1m X 2m
*) TERAS KANTOR
*) SEPANJANG JALAN MENUJU DAN SESUDAH KANTOR
*) SEJAJAR KANTOR ATO SEBERANG JALAN KANTOR
7 STIKER PROMOSI
UKURAN MINIMAL MIN CETAK
1 HVS / A4 100
BIAYA
EPAN LAMA
2
3
4
5
ATURAN STANDARD PEMASANGAN AT
SPANDUK LOWKER
DESIGN UKURAN MIN CETAK
BESAR 1m X 4m 1
SEDANG 1m X 3m
BANNER POHON
UKURAN MINIMAL MIN CETAK
75cm X 50 cm 50
BIAYA MAKSIMAL Rp 10.000 / pcs
JARAK PEMASANGAN
- satu titik minimal 3 banner
BANNER TESTIMONI
UKURAN MINIMAL MIN CETAK
75cm X 50 cm 50
BIAYA MAKSIMAL Rp 10.000 / pcs
JARAK PEMASANGAN
- satu titik minimal 3 banner
- jarak per banner 1 Meter
- jarak per titik minimal 100 M
- pemasangan menghadap arah berlawanan dengan pengemudi
KORAN
UKURAN MIN. TAYANG
KOLOM 5 X 8 CM 4X TAYANG
PEMASANGAN
DI KORAN SETEMPAT
FREKUENSI SABTU - MINGGU HARUS TAYANG
RADIO
SPOT / HARI
BESAR >6
SEDANG 5
KECIL 4
NB : JIKA JUALAN TIDAK CAPAI , SHG KENA TOLERANSI, MAKA BULAN BERIKUTNYA DI 15 HARI KERJA WAJIB CAPAI TG
TOLERANSI HANYA 1 KALI DARI TARGET TIDAK CAPAI , JIKA SAAT TOLERANSI CAPAI , MAKA ATURAN DARI AWAL
SA
MASA KERJA <= 3 BULAN
TARGET JUAL 1 BULAN TGT PK TGT WIC/CIC
MASA KERJA
UNIT RUPIAH ( WIC 60%, CIC 40%)
0 - 14 HR - - -
15 HR - 1 BULAN 3 15,000,000 4 36
> 1 - 2 BULAN 6 30,000,000 8 71
> 2 - 3 BULAN 8 40,000,000 10 89
KETERANGAN :
* PERIODE PROSES PUNIHMENT :
- PERIODE 1 : 13 HR KERJA PERTAMA.
- PERIODE 2 : AKHIR BULAN.
* MASA KERJA DI HITUNG SAAT PERIODE PROSES PUNISMENT.
* TARGET JUAL UTK SDM MASA KERJA > 3 BULAN :
- PERIODE 1 ( 13 HR KERJA PERTAMA ) : 50% DARI TARGET JUAL 1 BULAN.
- PERIODE 2 ( AKHIR BULAN ) : 100% DARI TARGET JUAL 1 BULAN.
* UNTUK TARGET YANG HARUS DICAPAI : ( UNIT CAIR )
HARI KERJA WAJIB CAPAI TGT SESUAI LIST DIATAS ,JIKA TIDAK AKAN DI LEPAS BY SYSTEM PER TGL 16 -18 ( UNTUK SDM YG KENA TOLERA
MAKA ATURAN DARI AWAL
AO
TARGET
PERIODE PROSES PUNISHMENT
SDM SALES
2 AKHIR BULAN
4 AKHIR BULAN
6 AKHIR BULAN
6 AKHIR BULAN
TARGET
PERIODE PROSES PUNISHMENT
SDM SALES
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
TEAM LEADER /KDH
TARGET
PERIODE PROSES PUNISHMENT
SDM SALES
2 AKHIR BULAN
4 AKHIR BULAN
6 AKHIR BULAN
6 AKHIR BULAN
TARGET
PERIODE PROSES PUNISHMENT
SDM SALES
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
6 SETIAP 2 MINGGU ( 1 BULAN 2X PROSES )
SALES COUNTER
AKHIR BULAN
AKHIR BULAN
AKHIR BULAN
AKHIR BULAN
PUNISHMENT
TL ###
TL ###
TL ###
TL / MUTASI ###
PUNISHMENT
PROSES BELAJAR
15 HARI CO N CO, TDK CAPAI TL
TL
TL
PUNISHMENT
TL
TL
TL
TL / MUTASI / DEMOSI
PUNISHMENT
PROSES BELAJAR
15 HARI CO N CO, TDK CAPAI TL
TL
TL
PUNISHMENT
TL
TL
TL
TL / MUTASI / DEMOSI
PUNISHMENT
PROSES BELAJAR
CO N CO
TL
TL
PUNISHMENT
TL
TL
TL
TL / MUTASI / DEMOSI