Indonesia Economic Outlook
Better than Global Trend DRIVING FACTORS
2016, Indonesia's economic growth has found a
factors driving growth
momentum of recovery, when the global trend is
Forecasts of Economic Growth still slowing
2
Acknowledgments of Indonesian Reform
Improvement of creditworthiness, ease of doing business, trust to the government
3
“Several Areas Still Shortage of 95.35%
Electrification Ratio(%)
Electricity Infrastructure”
Electrification ratio 2017
KALTIM
ACEH 99,99
97,68 JAMBI GORONTALO
KALTARA
SUMUT 93,68 84,78 86,56
99,90 Realization Target
SUMBAR DKIJAKARTA
89,15 99,99
JATENG
96,30
KALTENG
KALSEL MALUKU
80,82 92,12 87,39
BENGKULU
96,49 SULSEL
SULTRA
99,12
81,54
INFORMASI
INFORMATION SUMSEL
> 70 88,38
50 -70 JABAR
JATIM
LAMPUNG
99,99 DIY
92,03 NTT
<50
91,96 NTB
99,99
BALI 84,11 59,85 Installed Capacity (MW)
BANTEN 97,12 2013 2014 2015 2016 2017
99,99
4
#EquitableEnergy
Emphasize Social Wellfare, Condusive Bussiness Climate dan Economic Growth
6
Oil and Gas Blocks Tender in 2017
14
13
10
8 8
5 5
0 0
In 2018 government will offering at
lease 41 Conventional Blocks and 3 2013 2014 2015 2016 2017
7
Investment for Refinery Development Open for Private Investor
Private
Refinery Permit BundlingEnterprises
with Retail (eligible to sell to end user)
8
8
Mineral Mining and Processing Opportunities
Mining Permits Re-Evaluation | Clean and Clear / TOTAL Mining Permit (known as IUPs)
10,643 10,339
9,370 IUP CnC
9,074
Total IUP
6,370 6,202 6,565
6,000
9
National Commitment in Global Climate Change
The GOI also committed to participate on global sustainable action as pledged by President Joko Widodo, at the
21st COP 2015 in Paris, known as Paris Agreement that is committed to reduce greenhouse gas emission in 2030
to 29% on its own efforts. With International support, the reduction of greenhouse gas emission is targeted up
to 41%.
10
Utilization of Renewable Energy for Affordable Electricity Price and Environmental
Ministerial Regulation No. 50/2017
Implementation of Power Purchase * Types of Power Plan
General auction in accordance to the * Geothermal dan Municipal
RKAB: Rencana Kerja dan
provisions of the legislation Waste
Anggaran Power
Plan
Biaya Perusahaan Solar Biogas
Wind Municipal Waste
Hydro, Solar PV, Wind, Biomass, Hydro Geothermal
Through direct selection mechanism Biomass Ocean Currents
Ocean Currents, and Biogas Power
Plant
▪Solar Indexing to generation cost in local system If the power generation cost in the local electricity
▪Wind
▪Biomass National average power generation cost
▪Municipal
Waste
system
> national average power generation cost
▪Biogas ▪Geothermal Maximum purchase price is 100%
Maximum purchase price is 85% of local power of local power generation cost
▪Ocean ▪Hydro
Current generation cost
National average power generation cost Based on agreement, if power generation cost in
Power Generation Cost based on the agreement Sumatera, Java, Bali or local electricity
(BtoB) system ≤ National Average power generation cost
11
26.9 33.4
PLTSa 33.4
33.4
PLTBg
Attractiveness of Indonesian Renewable Energy Projects
23.9
22.9 26.9
33.4 26.9 PLTSa
19.2
PLTBm 26.9 23.9 PLTSa
18.9 PLTSa 22.9
17.9
17.9 26.9 23.9
23.9 PLTP
23.9 PLTBg PLTBg
22.9 23.9 26.9
22.9
26.9 PLTBg 22.9
PLTSa
22.9 18.9
18.9 19.2
PLTMH PLTBm PLTBm18.9
18.9 19.2
23.9 18.9 17.6 17.9
PLTBm
19.2 PLTBg 17.6 17.9 3
19.2
17.6 17.9 17.6
22.9
17.6 17.9 PLTA PLTP
2017 PLTP
PLTP PLTBm
18.9 19.2
13.1
13.1
PLTMH PLTP
PLTB 13.1
PLTMH68 PPA Signed ~
PLTMH
10.9 10.9
10.9 26.9
10.9
PLTA
PLTS PLTA 1,207 MWPLTA
PLTMH
PLTB
PLTSa Total
PLTB
23.9
22.9
PLTB
4.9 PLTA 4.9
Aceh Sulutenggo NTT Sumut Kaltim PLTS Papua
Kalbar 17.6 PLTB
17.9 PLTP 18.9 19.2
PLTS
33.4
33.4
PLTS
Total 33.4 RE Potential
Total
10.39 PLTS Total
13.1 Total Giga Watt (GW)
33.4
o 8.83
NTT
Maluku Sumut
NTB Kaltim
Riau Kalbar
Aceh Papua
10.9
Sulutenggo NTT Total
Sumut Kaltim 26.9
Kalbar Papua PLTSa
Babel MalukuNTT NTB Sumut
Riau Aceh Babel Papua
Sulutenggo Maluku Sumut
NTT NTB Riau
Kaltim Aceh
Kalbar Suluten
Papua
Riau Aceh
9.28
Sulutenggo
10.14
Kaltim Kalbar
22.9
23.9 26.9 PLTSa
PLTBg
MSW
26.9
lutenggo NTT Sumut Kaltim Kalbar 10.2
Papua 12.74 17.32
7.89 8,62 4.9 23.9 23.9 PLTBg
PLTBm
Biogas 23.9
4.9
17.6 12.43
17.9
18.9 19.2
8.67 10.83 22.9 14.72 22.9 22.9
PLTP
PLTBm
Biomass
BPP local=local price 1.3610.57 18.9 19.2
18.9 19.2
19.2 18.9 19.2
cent$/kWh 13.1 17.6
17.6 0.0817.9
0.08
17.6 17.9 17.9 17.6 17.9 PLTMH
PLTP
Geothermal
10.9
13.1 PLTA
100% BPP local Babel 13.1
Maluku
13.1
13.1 NTB 13.1
Riau Aceh Sulutenggo NTT Sumut PLTMH
Micro hydro
Kaltim Kalbar Pa
10.914.33Sulselrabar
10.9
10.9 10.9
Kalselteng PLTB
85% 4.9
BPP local PLTA
Hydro
12.18 9.04 PLTS
PLTB
PLTB
Wind
“
4.9
4.9 4.9 7.68 Total
4.9
There Maluku
are 209 GW RE Riau
potential “ PLTS
Solar
Babel NTB Aceh Sulutenggo NTT Sumut Kaltim Kalbar Papua
spreadBabel
out in 12 regionsNTB Total
Total
Maluku Riau Aceh Sulutenggo NTT Sumut 13.54Kaltim Kalbar Papua
(local BPP > average
Babel
Babel
BPP)
Maluku
Maluku
Babel
NTB
NTB
Maluku
Riau
Riau Aceh
Aceh
NTB
Sulutenggo
Riau
NTT Sumut
Aceh
17.52Kaltim
Sulutenggo
Kalbar11.51
NTT
Papua
Sumut Kaltim
13.68
11.63 14.89
12
70 Contracts
70 of
PPA New Renewable
Energi Baru Energy
Terbarukan 2017
Signed in 2017 Biogas
Never Happened
in previous years
Biomass
Solar
CONTRACTS Contracts Contracts is
has under
COD Construction
Geothermal
70 Contracts of New Renewable Energy Power Generator New Renewable Energy Power
Generation Progress (2014-2017) Contract
Signed in 2017
Contract
Contract Contract
13
Deployment of
Advance Renewable Technology
PLT Bayu (Wind Power) Sidrap Located in Sidereng Rappang Regency Next Progresive Renewable Energy
South Sulawesi Projects
(30x2,5 MW) Expected COD in First Quarter 2018
COD Target
First quarter 2018
PLTB Jeneponto
PPA Price : Capacity 60 MW
US$ 11.41 cent/kWh PLTB Sidrap II
Investment Capacity 50 MW
US$ 150 Million PLTB Tanah Laut
Avarage Wind Speed Capacity 70 MW
(85 m) 7+ m/s (25+ KPH)
PLTS Floating
Cirata
Capacity 200 MW
14
Ministerial
Regulation No
38 Year 2016
ACCELERATION OF INDONESIAN RURAL ELECTRIFICATION
Electrification program up to Renewable Energy Usage
50 MW capacity are given to :
Underdeveloped rural areas
Rural Electrification Acceleration Program
Isolated rural areas
utilizes renewable energy (RE) as a
International border areas
Small populated islands
a source of electricity.