Anda di halaman 1dari 1

ARCHEN TECHNOLOGIES, INC.

DAILY TIME RECORD

Employee Name : Lenah Marie C. Ramos
Designation        : FPG ‐ Depot Engineer
Period Covered : 1‐Mar‐18 15‐Mar‐18

Morning Afternoon Hours Worked Start of Remarks


Date Day in  out in  out a.m. p.m. Working Day am pm
01‐Mar‐18 thursday 9:00 AM 12:00 PM 1:00 PM 6:00 PM 3:00 5:00 9:00 AM LOBP MeetingTo resolve issue in ramp of SSCOR Meeting for LOBP Presentation to SYY
02‐Mar‐18 friday Emergency Leave
Site inspection of Ongoing AVGAS Facility 
Change Oil at Toyota Shaw
03‐Mar‐18 saturday 8:00 AM 12:00 PM 12:00 PM 5:30 PM 4:00 5:30 8:00 AM at Lipa, Batangas
04‐Mar‐18 sunday
05‐Mar‐18 monday 10:00 AM 12:00 PM 1:00 PM 6:30 PM 2:00 5:30 9:00 AM Office Office
06‐Mar‐18 tuesday 9:00 AM 12:00 PM 1:00 PM 7:09 PM 3:00 6:09 9:00 AM Office Office
07‐Mar‐18 wednesday 9:00 AM 12:00 PM 1:00 PM 6:00 PM 3:00 5:00 9:00 AM Regular Site Meeting and Inspection at LOBMeeting with RND
08‐Mar‐18 thursday 9:00 AM 12:00 PM 1:00 PM 6:00 PM 3:00 5:00 9:00 AM LOBP Meeting for COR Commisioning meeting with Jphil
09‐Mar‐18 friday 9:00 AM 12:00 PM 1:00 PM 6:00 PM 3:00 5:00 9:00 AM Navotas: Final Punchlisting for Navotas PierPandacan: Meeting with CCA for LOBP
Reinspection of Punchlist for Navotas pier 1, 
Resolve Hotworks Issue with Veco as Instructed 
By MPC, Onsite Measurement of Pipe rack width 
10‐Mar‐18 saturday 8:00 AM 12:00 PM 12:00 PM 5:00 PM 4:00 5:00 8:00 AM Joint Measurement of COR 42 at Harbour C for road crossing
11‐Mar‐18 sunday
12‐Mar‐18 monday 9:38 AM 12:00 PM 1:00 PM 6:00 PM 2:22 5:00 9:00 AM Office Office
LOBP COR Presentation with JL Ang and Sy 
13‐Mar‐18 tuesday 9:00 AM 12:00 PM 1:00 PM 6:20 PM 3:00 5:20 9:00 AM Yu at SMC LOBP Meeting with MK Surio at Eagle Cement
Site Inspection for Road Crossing, As Built 
14‐Mar‐18 wednesday 9:00 AM 12:00 PM 1:00 PM 9:45 PM 3:00 8:45 9:00 AM Kick off Meeting with EEI Measuring of Perimeter Fence
15‐Mar‐18 thursday 9:00 AM 12:00 PM 1:00 PM 8:00 PM 3:00 7:00 9:00 AM LOBP Laboratory Meeting Pandacan  Meeting for Road Crossing at Pandacan

36:22 68:14
Total
Total hours 104: 36
Prepared by: Approved  by:

LC RAMOS          JS VILLARIN/    CC ADORABLE /      VM CASTILLO

Anda mungkin juga menyukai