Anda di halaman 1dari 33

DAFTAR PUSTAKA

Arief M.Sc., Dr. Ir. Irwandy dan Adisoma Ph.D, Ir Gatut S, 2002. Buku Ajar
Perencanaan Tambang, Departemen teknik Pertambangan. Bandung: ITB.
Arief M.Sc., Dr. Ir. Irwandy, 2003. Diktat Kuliah Manajemen Tambang,
Departemen teknik Pertambangan. Bandung: ITB.
Caterpillar Handbook Performance a CAT publication by Caterpillar Inc., Peoria,
Illinois, U.S.A. October 2003
Chironis, Nicholas P., 1987. “Coal Age Operating Handbook of Coal Surface
Mining and Reclamation”, vol. 2, Mc Graw-Hill, Inc., New York, N.Y.
10020.
Eddy R. Sumaatmadja & Agus Pujobroto. Pemetaan Sebaran Batubara dan
Penentuan Titik Api di Kawasan Hutan Wisata Bukit Suharto dan
Sekitarnya, Propinsi Kalimantan Timur, Subdit. Eksplorasi Batubara dan
Gambut, DSM.
Fergusson A., Mc Clay K., 1997. “Structural modeling within the Sanga-sanga
PSC, Kutai Basin, Kalimantan: its application to paleochannel orientation
studies and timing of hydrocarbon entrapment”, Indonesian Petroleum
Association.
FX. Harkins HP, JA. Prihandono, A. Setiya Budhi, D. Kusnida (PPGL), 1999.
Studi Regional Cekungan Batubara Daerah Pesisir Kalimantan Timur,
Pemaparan Hasil Kegiatan Lapangan DIK-S Batubara, DSM.
Gautama, Dr. Ir. Rudy Sayoga, 1999. Diktat Kuliah Sistem Penyaliran Tambang,
Departemen Teknik Pertambangan. Bandung: ITB.
Hartman, H. L., 1987. “Introductory Mining Engineering”, A Wiley Interscience
Production, John Wiley and Sons Inc., New York.
Komatsu Spesifications and Application Handbook. Japan. March 2005
Martin, J. W., T. J. Martin, T. P. Bennett, and K. M. Martin, 1982. “Surface
Mining Equipment,” Martin Consultants, Golden, CO.

71
Pfleider, E. P., ed., 1973a. “Open pit and Strip Mining Systems and Equipment,”
sec. 17 in SME Mining Engineering Handbook, A. B. Cummins and I. A.
Given, eds., Soc. Mng. Engr. AIME, New York.
Pfleider, E. P., ed., 1973b. “Surface Haulage and Storage,” Sec. 18 in SME
Mining Engineering Handbook, A. B. Cummins and I. A. Given, eds., Soc.
Mng. Engr. AIME, New York.
Prodjosumarto, Partanto, 1993. Diktat Kuliah Pemindahan Tanah Mekanis.,
Departemen Teknik Pertambangan. ITB. Bandung.
Skelly and Loy, 1975, “Economic Engineering Analysis of U.S. Surface Coal
Mines and Effective Land Reclamation,” US Bureau of Mines Contract
Report SO 241049, February.
Stefanko, R., 1983. “Coal Mining Technology, Theory and Practice,” Society of
Mining Engineers, American Institute of Mining, Metalurgical, and
Petroleum Engineers, Inc., New York.
Stefanko, R., Ramani, R. V., and Ferko, M. R., 1973, “An Analysis of Strip
Mining Methods and Equipment Selection, ” Research Report, Contract No.
14-01-0001-390 to Office of Coal Research, US Dept. Of the Interior, May
29.

72
LAMPIRAN A

DATA PENGUKURAN CURAH HUJAN


Grafik dan Data Curah Hujan Tahun 2005-2007
2005 Rain Data (To 2006 Rain Data (To Date)

Rain delays (h ours)


raindelays (hours)
Date)
600.0 2000 800

Rainfall (m m )
1800 700
2500 500.0
1600
Rainfall (mm) 600
400.0 1400
2000 500
1200
300.0
1500 1000 400
200.0 800 300
1000 600
100.0 200
400
200 100
500 0.0
0 0
0 J F M A M J J A S O N D J F M A M J J A S O N D
Month Month
rainfall (mm) raindelays rainfall (mm) raindelays (hrs)

rainfall MTD (mm) raindelays MTD rainfall MTD (mm) raindelays MTD (hrs)
(hrs)

Data tahun 2005


Month Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05
raindelays 12.2 18.2 56.0 74.4 50.8 23.8 46.35 17.8 6.9 78.7 77.8 143.9
raindelays MTD / cum (hrs) 12.22 30.38 86.38 160.78 211.58 235.38 281.73 299.53 306.43 385.13 462.93 540.7
rainfall (mm) 43.4 89.4 148.6 311.8 138.5 87.5 187.0 49.5 43.3 282.0 322.0 244.5
rainfall MTD / cum (mm) 43.4 132.8 281.4 593.2 731.7 819.2 1006.2 1055.7 1099.0 1381.0 1703.0 1947.5

Data tahun 2006


Month Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06
raindelays (hrs) 86.0 80.0 61.1 52.2 99.2 120.5 10.5 41.1 47.0 7.5 61.7 73.4
raindelays MTD / cum (hrs) 86.00 166.00 227.10 279.30 378.50 499.00 509.50 550.60 597.60 605.10 666.80 728.5
rainfall (mm) 295.0 263.5 83.5 142.0 138.8 143.5 12.5 92.3 123.0 15.5 139.0 330.5
rainfall MTD / cum (mm) 295.0 558.5 642.0 784.0 922.8 1066.3 1078.8 1171.1 1294.1 1309.6 1448.6 1779.1
Summary Rain Delays 2007
2500 1200.0

1000.0
2000

Rain Delays (hours)


800.0

RainFall (m m )
1500

600.0
400.0
1000

200.0
500

0 0.0
J F M A M J J A S O
Month

RainFall (mm) Rain/Delays (hrs)


rainfall MTD (mm) raindelays MTD (hrs)

Data tahun 2007


Month Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07
Rain/Delays (hrs) 167.0 92.5 96.0 108.0 118.0 170.8 129.0 67.5 63.5 33.7
raindelays MTD / cum (hrs) 167.00 259.50 355.50 463.50 581.50 752.25 881.25 948.75 1012.25 1045.95
RainFall (mm) 353.0 209.5 211.0 108.0 323.0 273.7 183.7 118.5 163.5 125.5
rainfall MTD / cum (mm) 353.0 562.5 773.5 881.5 1204.5 1478.2 1661.9 1780.4 1943.9 2069.4
LAMPIRAN B

TAHAPAN PENAMBANGAN
35 35 35

250E

500E

750E
325RL 325RL 27 30 32
50 00 50
300RL 300RL E E E

275RL 275RL

250RL
Penampang Melintang Section AA' 250RL

225RL 225RL
A A' 9112500N 9112500N
200RL 200RL

175RL 175RL

150RL OB removed 150RL

125RL design boundary 125RL

100RL 100RL

75RL 75RL
B
50RL 50RL
surface
25RL 25RL

0RL 0RL

-25RL coal mined out coal seam -25RL 9112250N 9112250N


-50RL -50RL

-75RL -75RL
inpit disposal dump area
-100RL -100RL
A
-125RL -125RL

-150RL -150RL

-175RL -175RL

-200RL -200RL
sump area
250E

500E

750E
-225RL -225RL

9112000N 9112000N
250E

500E

750E
325RL 325RL

300RL 300RL

275RL 275RL B'


250RL
Penampang Melintang Section BB' 250RL

225RL
B B' 225RL

200RL 200RL

175RL 175RL

150RL design boundary 150RL

125RL
OB removed 125RL

100RL 100RL
9111750N
A' 9111750N
75RL 75RL

50RL 50RL
surface
25RL 25RL

0RL 0RL

-25RL -25RL
coal seam
-50RL coal mined out -50RL

-75RL -75RL

-100RL -100RL

-125RL -125RL

-150RL -150RL
9111500N 9111500N
-175RL -175RL
SURPAC SOFTWARE INTL
sect1c.pf

-200RL -200RL 35 35
-225RL -225RL
27 30 section
250E

500E

750E

50 00
E E first phase
1

SURPAC_VISION - SURPAC Software International


Scale: 1: 3500 Plan No. Date: 17-May-08
9112500N 35 35 35 35

250E

500E

750E
200RL 200RL 25 27 30 32
00 50 00 50
175RL 175RL E E E E
150RL Penampang Melintang Section CC' 150RL

125RL
C OB removed C' 125RL

100RL 100RL
design boundary
75RL 75RL

50RL 50RL
surface
25RL 25RL

0RL 0RL
9112250N 9112250N
-25RL coal -25RL

-50RL
seam coal mined out -50RL

-75RL -75RL

-100RL -100RL

E
250E

500E

750E
-125RL -125RL
250E

500E

750E
225RL 225RL

200RL 200RL
Penampang Melintang Section DD'
175RL
D D' 175RL

150RL 150RL 9112000N


OB removed 9112000N D
125RL 125RL

100RL design boundary 100RL

75RL 75RL

50RL 50RL inpit disposal dump area


surface
25RL 25RL
coal seam
0RL 0RL
C
-25RL -25RL

-50RL coal mined out -50RL

-75RL -75RL

-100RL -100RL 9111750N 9111750N


250E

500E

750E

sump E'
area

225RL 50 75
25 0E 0E 225RL
0E
200RL
200RL
175RL
175RL Penampang Melintang Section EE'
150RL '

150RL
E E 75RL
125RL
OB removed 125RL C'
100RL design boundary 100RL

75RL

50RL 50RL
surface
25RL 25RL 35
25 35
SURPAC SOFTWARE INTL
-100RL
00 27 section
0RL
-100RL 25 coal seam
50 75 0RL
E 50
0E 0E 0E
E second phase
-25RL -25RL
2
-50RL coal mined -50RL
sect2a.pf

SURPAC_VISION - SURPAC Software International


Scale: 1: 3500 Plan No. Date: 17-May-08
-75RL out -75RL
175RL 25 50 75 175RL 35 35 35 35
0E 0E 0E 22 25 27 30
150RL 150RL 50 00 50 00
E E E E
125RL
F Penampang Melintang Section FF' F'
125RL

100RL design boundary 100RL


OB 9112250N 9112250N

75RL
removed 75RL

50RL
surface 50RL

25RL 25RL

0RL 0RL
coal mined out coal
seam
-25RL -25RL

-50RL -50RL

-75RL 25 50 75 -75RL
25 50 75
175RL 0E
0E
0E
0E
0E
0E
175RL inpit disposal dump area
9112000N 9112000N
150RL 150RL

125RL
G Penampang Melintang Section GG' G' 125RL
100RL design boundary 100RL
OB removed
75RL 75RL I
50RL
surface 50RL

25RL 25RL

0RL
coal mined coal
-25RL
out seam 0RL
H
-25RL

-50RL -50RL

-75RL -75RL
9111750N
-100RL
25 50 75
-100RL
sump 9111750N
0E 0E 0E
area
25 50 75
175RL 175RL
0E 0E 0E
G
150RL 150RL

Penampang Melintang Section HH' H' 125RL


125RL
H
100RL design boundary
OB 100RL

removed
75RL 75RL

50RL
surface
50RL F
25RL 25RL

0RL 0RL
I'
coal mined out coal seam
-25RL -25RL
9111500N 9111500N
-50RL -50RL

-75RL -75RL
25 50 75
-100RL -100RL
0E 0E 0E

175RL 25 50 75 175RL
0E 0E 0E
150RL 150RL

125RL
OB Penampang Melintang Section II' 125RL
100RL I removed I' 100RL

75RL
design boundary 75RL

50RL 50RL
G'
25RL 25RL
9111250N 9111250N
0RL 0RL
coal
-25RL coal mined out -25RL F'
seam
35 -75RL
-50RL -50RL 22 -75RL
25 50 75
50 35
0E 0E 0E
E 25
00
E
SURPAC SOFTWARE INTL 3
35
section third phase 27
50
E Scale: 1: 3500 Plan No. Date: 17-May-08
SURPAC_VISION - SURPAC Software International
sect3a.pf
200RL 200RL
175RL
Penampang Melintang Section JJ' 175RL
9112250N 9112250N

150RL 150RL
125RL 125RL
100RL
J OB design boundary J' 100RL
removed
75RL 75RL
50RL
50RL
surface
25RL 25RL
0RL
coal mined out coal 0RL

seam
-25RL -25RL
-50RL -50RL 9112000N 9112000N
-75RL -75RL
-100RL 10
-100RL
00
-125RL E
25 50 75
0E 0E 0E 0E

10
00
E
0E

25 50
0E 0E 75
225RL 0E

200RL 200RL
175RL
Penampang Melintang Section KK' 175RL
150RL 150RL 9111750N 9111750N
125RL
K OB design boundary K' 125RL
100RL
100RL
75RL
75RL removed surface
50RL 50RL L
25RL 25RL
0RL coal mined coal 0RL
out
seam
-25RL -25RL
-50RL -50RL
-75RL -75RL
9111500N K 9111500N

-100RL -100RL
50 75
-125RL 0E -125RL
0E
10
25
00
0E 0E
E

inpit disposal
dump area
0E 25
0E
50
0E
75
0E
10
00
J
200RL E

175RL
Penampang Melintang Section LL' 175RL
9111250N 9111250N
150RL 150RL
L'
125RL
L L' 125RL

100RL
OB removed design 100RL
boundary
75RL 75RL sump area
50RL surface 50RL
25RL 25RL

0RL
coal
0RL
-25RL
K'
-25RL
-50RL seam coal mined out -50RL

-75RL -75RL
-100RL -100RL 9111000N
35 35
-125RL 22 25
10
25 50 75 50 00
00
0E 0E 0E 0E E E
E
0E 25 50 75 10 35 35 35 35
0E 0E 0E 00 22 25 27 30
E 50 00 50 00
SUR E E E
35
TWARE INTL E
PAC J'
27 section
50
SOF E fourth phase
4

SURPAC_VISION - SURPAC Software International


Scale: 1: 4000 Plan No. Date: 17-May-08
sect4a.pf
35 35 35 35 35

0E

250E

500E

750E

1000E
275RL 275RL 20 22 25 27 30
250RL 250RL 00 50 00 50 00
E E E E E
225RL 225RL
200RL Penampang Melintang Section MM' 200RL
175RL 175RL
150RL 150RL 9112250N 9112250N
design boundary
125RL
100RL
M OB removed M'
125RL
100RL
75RL 75RL
50RL surface 50RL
25RL 25RL
0RL coal seam 0RL
-25RL -25RL
coal mined out
-50RL -50RL
-75RL -75RL
-100RL -100RL 9112000N 9112000N
-125RL -125RL
-150RL -150RL

1000E
-175RL -175RL
250E

500E

750E
0E

-200RL -200RL

300RL 300RL
0E

250E

500E

750E

1000E
275RL 275RL
250RL 250RL
225RL 225RL
200RL Penampang Melintang Section NN' 200RL
9111750N 9111750N

175RL 175RL
150RL 150RL
125RL design boundary 125RL
100RL N OB removed N' 100RL
75RL 75RL
50RL surface 50RL
25RL 25RL
0RL coal 0RL
-25RL -25RL 9111500N 9111500N
-50RL seam coal mined out -50RL
-75RL -75RL
-100RL -100RL
-125RL -125RL
-150RL
-175RL
-150RL
-175RL
O

1000E
-200RL -200RL
250E

500E

750E
0E

9111250N
9111250N N

M
0E

250E

500E

750E

1000E

275RL 275RL
250RL 250RL
225RL 225RL
200RL Penampang Melintang Section OO' 200RL
175RL 175RL inpit disposal dump area
150RL 150RL 9111000N 9111000N
design boundary
125RL
OB removed
125RL
O'
100RL O O' 100RL sump area
75RL 75RL
50RL surface 50RL
25RL 25RL
coal
0RL mined out coal seam 0RL N'
-25RL -25RL
-50RL -50RL
9110750N
-75RL -75RL
M' SURPAC SOFTWARE INTL
-100RL -100RL 35 35
section
sect5b.pf

-125RL -125RL 20 22
00 50 35
-150RL -150RL 25 fifth phase
E E
-175RL -175RL
00 5
1000E

E
250E

500E

750E

-200RL -200RL Scale: 1: 5000 Plan No. Date: 17-May-08


0E

SURPAC_VISION - SURPAC Software International


LAMPIRAN C

HASIL PERHITUNGAN PRODUKTIVITAS ALAT


EQUIPMENT PRODUCTIVITY

Waste Coal Fleet

Month Jan-08 Feb-08 Mar-08 Month Jan-08 Feb-08 Mar-08


Calendar Days 31 29 31 Calendar Days 31 29 31
Non-Production Days 2 1 3 Non-Production Days 2 1 3
Production Days 29 28 28 Production Days 29 28 28

Hours per day 24.0 24.0 24.0 hrs/day Hours per day 24.0 24.0 24.0 hrs/day

Delays Delays
Maintenance Delays Maintenance Delays
Scheduled Maintenance Scheduled Maintenance
Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc 0.8 0.8 0.8 hrs/day
Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day
Unscheduled Maintenance Unscheduled Maintenance
30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift 1.0 1.0 1.0 hrs/day
Idle Time Idle Time
Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day
Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day
Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day
Operating Delays Operating Delays
Blasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day 0.0 0.0 0.0 hrs/day

Effective Working Hours per day 14.2 15.1 16.2 hrs/day Effective Working Hours per day 14.6 15.5 16.6 hrs/day

Effective Working Hours per month 413.1 423.1 454.7 hrs/month Effective Working Hours per month 424.7 434.3 465.9 hrs/month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385 units/month
Backhoe EX710 Komatsu PC3000 1 1 units/month Backhoe EX415 Caterpillar Cat345 1 1 1 units/month
Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino t/hr


Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr Caterpillar Cat345 + 6 Hino 78 78 78 t/hr
Komatsu PC3000 + 7 Cat 777D 745 895 bcm/hr
Komatsu PC1250 + 3 Cat 777D 250 250 300 bcm/hr
.

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 307,772 315,227 406,986 bcm Caterpillar Cat385 + 14 Hino 0 0 0t
Komatsu PC3000 + 7 Cat 777D 315,227 406,986 bcm Caterpillar Cat345 + 6 Hino 33,128 33,877 36,343 t
Komatsu PC1250 + 3 Cat 777D 103,279 105,781 136,420 bcm

Total Production Capacity 411,051 736,236 950,393 bcm Total Production Capacity 33,128 33,877 36,343 t
Waste Coal Fleet

Month Apr-08 May-08 Jun-08 Month Apr-08 May-08 Jun-08


Calendar Days 30 31 30 Calendar Days 30 31 30
Non-Production Days 0 2 0 Non-Production Days 0 2 0
Production Days 30 29 30 Production Days 30 29 30

Hours per day 24.0 24.0 24.0 hrs/day Hours per day 24.0 24.0 24.0 hrs/day

Delays Delays
Maintenance Delays Maintenance Delays
Scheduled Maintenance Scheduled Maintenance
Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc 0.8 0.8 0.8 hrs/day
Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day
Unscheduled Maintenance Unscheduled Maintenance
30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift 1.0 1.0 1.0 hrs/day
Idle Time Idle Time
Weather: Apr -90 hrs, May 60- hrs, Jun - 60 hrs 3.0 2.1 2.0 hrs/day Weather: Apr -90 hrs, May 60- hrs, Jun - 60 hrs 3.0 2.1 2.0 hrs/day
Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day
Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day
Operating Delays Operating Delays
Blasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day 0.0 0.0 0.0 hrs/day

Effective Working Hours per day 15.4 16.3 16.4 hrs/day Effective Working Hours per day 15.8 16.7 16.8 hrs/day

Effective Working Hours per month 461.5 471.5 491.5 hrs/month Effective Working Hours per month 473.5 483.1 503.5 hrs/month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385 1 1 1 units/month
Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345 1 units/month
Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino 253 253 253 t/hr


Komatsu PC3000 + 7 Cat 777D 745 895 895 bcm/hr Caterpillar Cat345 + 6 Hino 98 t/hr
Komatsu PC3000 + 7 Cat 777D 745 895 895 bcm/hr
Komatsu PC1250 + 3 Cat 777D 250 300 300 bcm/hr

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 343,818 421,948 439,893 bcm Caterpillar Cat385 + 14 Hino 119,796 122,212 127,386 t
Komatsu PC3000 + 7 Cat 777D 343,818 421,948 439,893 bcm Caterpillar Cat345 + 6 Hino 0 0 49,343 t
Komatsu PC1250 + 3 Cat 777D 115,375 141,435 147,450 bcm

Total Production Capacity 803,010 985,331 1,027,235 bcm Total Production Capacity 119,796 122,212 176,729 t
Waste Coal Fleet

Month Jul-08 Aug-08 Sep-08 Month Jul-08 Aug-08 Sep-08


Calendar Days 31 31 30 Calendar Days 31 31 30
Non-Production Days 1 1 0 Non-Production Days 1 1 0
Production Days 30 30 30 Production Days 30 30 30

Hours per day 24.0 24.0 24.0 hrs/day Hours per day 24.0 24.0 24.0 hrs/day

Delays Delays
Maintenance Delays Maintenance Delays
Scheduled Maintenance Scheduled Maintenance
Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc 0.8 0.8 0.8 hrs/day
Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day
Unscheduled Maintenance Unscheduled Maintenance
30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift 1.0 1.0 1.0 hrs/day
Idle Time Idle Time
Weather: Jul - 60 hrs, Aug - 60 hrs, Sep - 60 hrs 2.0 2.0 2.0 hrs/day Weather: Jul - 60 hrs, Aug - 60 hrs, Sep - 60 hrs 2.0 2.0 2.0 hrs/day
Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day
Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day
Operating Delays Operating Delays
Blasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day 0.0 0.0 0.0 hrs/day

Effective Working Hours per day 16.4 16.3 16.4 hrs/day Effective Working Hours per day 16.8 16.7 16.8 hrs/day

Effective Working Hours per month 491.5 489.8 491.5 hrs/month Effective Working Hours per month 503.5 501.8 503.5 hrs/month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385 1 1 1 units/month
Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345 1 units/month
Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino 316 253 253 t/hr


Komatsu PC3000 + 7 Cat 777D 895 895 895 bcm/hr Caterpillar Cat345 + 6 Hino 78 t/hr
Komatsu PC3000 + 7 Cat 777D 895 895 895 bcm/hr
Komatsu PC1250 + 3 Cat 777D 300 300 300 bcm/hr

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 439,893 438,349 439,893 bcm Caterpillar Cat385 + 14 Hino 159,106 126,949 127,386 t
Komatsu PC3000 + 7 Cat 777D 439,893 438,349 439,893 bcm Caterpillar Cat345 + 6 Hino 39,273 0 0t
Komatsu PC1250 + 3 Cat 777D 147,450 146,933 147,450 bcm

Total Production Capacity 1,027,235 1,023,632 1,027,235 bcm Total Production Capacity 198,379 126,949 127,386 bcm
Waste Coal Fleet

Month Oct-08 Nov-08 Dec-08 Month Oct-08 Nov-08 Dec-08


Calendar Days 31 30 31 Calendar Days 31 30 31
Non-Production Days 2 2 1 Non-Production Days 2 2 1
Production Days 29 28 30 Production Days 29 28 30

Hours per day 24.0 24.0 24.0 hrs/day Hours per day 24.0 24.0 24.0 hrs/day

Delays Delays
Maintenance Delays Maintenance Delays
Scheduled Maintenance Scheduled Maintenance
Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc 0.8 0.8 0.8 hrs/day
Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day
Unscheduled Maintenance Unscheduled Maintenance
30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift 1.0 1.0 1.0 hrs/day
Idle Time Idle Time
Weather: Oct -90 hrs, Nov - 90 hrs, Dec - 120 hrs 3.1 3.2 4.0 hrs/day Weather: Oct -90 hrs, Nov - 90 hrs, Dec - 120 hrs 3.1 3.2 4.0 hrs/day
Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day
Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day
Operating Delays Operating Delays
Blasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day 0.0 0.0 0.0 hrs/day

Effective Working Hours per day 15.3 15.1 14.4 hrs/day Effective Working Hours per day 15.7 15.5 14.8 hrs/day

Effective Working Hours per month 443.1 423.1 431.5 hrs/month Effective Working Hours per month 454.7 434.3 443.5 hrs/month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385 1 1 1 units/month
Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345 1 units/month
Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino 253 253 253 t/hr


Komatsu PC3000 + 7 Cat 777D 895 745 745 bcm/hr Caterpillar Cat345 + 6 Hino 78 t/hr
Komatsu PC3000 + 7 Cat 777D 895 745 745 bcm/hr
Komatsu PC1250 + 3 Cat 777D 300 250 250 bcm/hr

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 396,589 315,227 321,468 bcm Caterpillar Cat385 + 14 Hino 115,043 109,884 112,206 t
Komatsu PC3000 + 7 Cat 777D 396,589 315,227 321,468 bcm Caterpillar Cat345 + 6 Hino 35,468 0 0t
Komatsu PC1250 + 3 Cat 777D 132,935 105,781 107,875 bcm

Total Production Capacity 926,114 736,236 750,810 bcm Total Production Capacity 150,511 109,884 112,206 bcm
Waste Coal Fleet

Month Jan-09 Feb-09 Mar-09 Month Jan-09 Feb-09 Mar-09


Calendar Days 31 28 31 Calendar Days 31 28 31
Non-Production Days 1 0 0 Non-Production Days 1 0 0
Production Days 30 28 31 Production Days 30 28 31

Hours per day 24.0 24.0 24.0 hrs/day Hours per day 24.0 24.0 24.0 hrs/day

Delays Delays
Maintenance Delays Maintenance Delays
Scheduled Maintenance Scheduled Maintenance
Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc 0.8 0.8 0.8 hrs/day
Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day
Unscheduled Maintenance Unscheduled Maintenance
30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift 1.0 1.0 1.0 hrs/day
Idle Time Idle Time
Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day
Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day
Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day
Operating Delays Operating Delays
Blasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day 0.0 0.0 0.0 hrs/day

Effective Working Hours per day 14.2 15.1 16.2 hrs/day Effective Working Hours per day 14.6 15.5 16.6 hrs/day

Effective Working Hours per month 427.4 423.1 503.5 hrs/month Effective Working Hours per month 439.4 434.3 515.9 hrs/month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385 1 1 units/month
Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345 1 1 1 units/month
Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino 253 316 t/hr


Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr Caterpillar Cat345 + 6 Hino 78 78 98 t/hr
Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr
Komatsu PC1250 + 3 Cat 777D 250 250 300 bcm/hr

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 318,385 315,227 450,592 bcm Caterpillar Cat385 + 14 Hino 111,159 137,246 0t
Komatsu PC3000 + 7 Cat 777D 318,385 315,227 450,592 bcm Caterpillar Cat345 + 6 Hino 34,270 33,877 50,554 t
Komatsu PC1250 + 3 Cat 777D 106,841 105,781 151,036 bcm

Total Production Capacity 743,610 736,236 1,052,220 bcm Total Production Capacity 145,429 171,124 50,554 t
LAMPIRAN D

SPESIFIKASI ALAT
Excavator Komatsu PC 3000
Hydraylic Excavator Komatsu PC 1250
Ekskavator Caterpillar 385 B
Ekskavator Caterpillar 345 B
Dump Truck Caterpillar 777D
Dump Truck HINO FM 260JD

tipe karoseri : Dump


GVW / GCW : 20 - 30 ton
panjang bak : 6 - 7 meter
tenaga mesin : 260 ps
tipe roda penggerak : 6 x 4 (10 roda)
jarak sumbu roda : 4 - 5 meter

PRODUK Model FM 260 JD


PRODUKSI Kode Produksi FM8JNKD-RGJ
PERFORMANCE Kecepatan 86
Maksimum(km/jam)
Daya Tanjak (tan Ø) 47.1
MESIN Model J08E-UF
Tipe Diesel 4 Stroke; In-Line
Tenaga Maks (PS/rpm) 260 / 2500
Momen Putir Maks. 76 / 1500
(Kgm/rpm)
Jumlah Silinder 6
Diameter x Langkah 112 x 130
Piston (mm)
Isi Silinder 7684
KOPLING Tipe Single Dry Plate, with Coil Spring
Diameter 380
TRANSMISI Tipe Low + 8 speeds
Perbanding Gigi -
ke-1 12.637
ke-2 8.806
ke-3 6.55
ke-4 4.768
ke-5 3.548
ke-6 2.481
ke-7 1.845
ke-8 1.343
ke-9 1
mundur 13.21
KEMUDI Tipe Integral Power Steering
Radius Putar Min. (m) 8.8
SUMBU Depan Reverse Elliot,
Belakang Full floating type with hypoid gear
Perbandingan gigi akhir STD = 6.428
Sistem Penggerak Rear 6x4
REM Rem Utama Air Over Hydraulic,
Rem Pelambat With on Exhaust Pipe
Rem Parkirr Internal Expanding tipe pada transmisi output
RODA & BAN Ukuran Rim 20X7.00T-162
Ukuran Ban 10.00-20-16PR
Jumlah Ban 10
SISTIM LISTRIK Accu 12V-65Ah x2
TANGKI SOLAR Kapasitas (L) 200
DIMENSI (mm) Jarak Sumbu Roda 4130+1300
Panjang bak 6420
Total Panjang 8480
Total Lebar 2450
Total Tinggi 2700
Lebar Jejak Depan FR Tr 1930
Lebar jejak Belakang RR STD:1855(JIS-8)
Tr
Julur Depan FPH 1255
Julur Belakang ROH 1795
SUSPENSI Depan & Belakang Rigid Axle with Semi Elliptic
BERAT CHASSIS (kg) Depan 2900
Belakang 3710
Berat Kosong 6610
GVWR 26000
TIPE KAROSERI Dump O
Mobil Boks O
Boks Berpendingin O
Bak Terbuka O
Crane O
Mobil Derek O
Sky Lift -
Tangki O
Los Bak O
Angkut Kendaraan -
Truk Logging O
Molen -
Tangki High Blow O
Arm Roll -
Mobil Pemadam -
Ambulance -
Truk Sampah -
Mobil Penarik -

Anda mungkin juga menyukai