Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Insert electrical (4) Proper working platform for workers / use double
Physical leaf of steel ladder.
5 wiring into conceal -Serious injury 2 4 8 Project Manager
Workers slip and fall (5) Scaffolding erecting by experience workers.
piping (ceiling) (6) To provide appropriate PPE. Site Manager
Site Agent
(4) To provide safe working platform / use a steel ladder. Site Engineer
Physical
-Serious injury 2 4 8 (5) Scaffolding erecting by experience workers. Site Supervisor
Workers slip and fall (6) To provide appropriate PPE.
SHO / SSS
EO
Hacking a recess line -Serious injury
Physical (4) To ensure working platform are properly erected. Scaffolder
to brick wall & end (long term can impair to 2 4 8
6 Dust Exposure (6) To provide appropriate PPE.
point of conceal lung)
Work Leader
piping Machinery opr/
(4) Electrical wire shall hang-up and not obstruct Driver
Mechanical walkway. Signalman
Electrical shock-due to bad -Serious injury 2 4 8 (5) To ensure power tool in good condition before used.
condition of power tools. - Power tool to be test before used. Banksman
(6) To provide appropriate PPE. Rigger
-Serious injury Welder
Patch up with cement Chemical (long term can impair Workers
7 2 4 8 (6) To provide appropriate PPE.
mortar Contact with wet cement worker skin dermatitis)
-Skin burn
Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)