SHOP DRAWING

PEKERJAAN
PEMBANGUNAN SUMUR BOR, RUMAH POMPA
+ TOWER PENAMPUNGAN AIR

LOKASI
DESA BONTOJAI, KEC. TAMALATEA
KABUPATEN JENEPONTO
CATATAN

PIPA PVC 1 1/4 "

A TALI PENGGANTUNG POMPA


SHOP DRAWING
RENCANA KEGIATAN

40
PEMBANGUNAN PASANGAN
RABAT BETON SUMUR BOR + RUMAH POMPA

25
RABAT BETON LOKASI
DUSUN
CEMENT GROUNTING DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
PEMOHON
TANAH LIAT

TAMPAK ATAS
SKALA 1 : 40
MENGETAHUI

CENTENNG CEVIVE
PIPA PVC dia 2"

KABEL LISTRIK TALI PENGGANTUNG


POMPA

MUR BAUT MENYETUJUI


PACKING KARET
PVC 5 " (CASING)
KERIKIL

SARINGAN

DETAIL A
SKALA 1 : 20 PERENCANA

NAMA GAMBAR SKALA


PAS. SUMUR BOR
DOP SOCKET 1 : 40

POTONGAN SUMUR BOR TANGGAL KODE NO. LBR JML. LBR

SKALA 1 : 40
CATATAN

150 SHOP DRAWING


RENCANA KEGIATAN

PEMBANGUNAN PASANGAN

B SUMUR BOR + RUMAH POMPA

LOKASI
DUSUN
DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
PEMOHON

150 A A
MENGETAHUI

MENYETUJUI

B
DENAH RENCANA RUMAH POMPA
PERENCANA
SKALA 1 :30

NAMA GAMBAR SKALA


DENAH RENCANA
1 : 50
RUMAH POMPA

TANGGAL KODE NO. LBR JML. LBR


CATATAN

SHOP DRAWING
RENCANA KEGIATAN

PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA

LOKASI
DUSUN
DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
PEMOHON

MENGETAHUI

MENYETUJUI

TAMPAK SAMPING RUMAH POMPA TAMPAK DEPAN RUMAH POMPA PERENCANA


SKALA 1 :40 SKALA 1 :40

NAMA GAMBAR SKALA


TAMPAK DEPAN &
1 : 40
SAMPING RUMAH
POMPA
TANGGAL KODE NO. LBR JML. LBR
CATATAN

SHOP DRAWING
RENCANA KEGIATAN

PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA

LOKASI
DUSUN
DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
PEMOHON

MENGETAHUI

MENYETUJUI

PERENCANA
TAMPAK BELAKANG RUMAH POMPA
SKALA 1 :40

NAMA GAMBAR SKALA


TAMPAK BELAKANG
1 : 40
RUMAH POMPA

TANGGAL KODE NO. LBR JML. LBR


CATATAN

SHOP DRAWING
150 150
RENCANA KEGIATAN

PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA
LISPLANK 3/20
ATAP SENG GELOMBANG

LOKASI
DUSUN
BALOK KAYU 5/7
RING BALK 15/15
BALOK KAYU 7/10 + 2.85 + 2.85 DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
PEMOHON

MENGETAHUI

MENYETUJUI

SLOEF 15/15

MUKA TANAH

PERENCANA
- 0.85 - 0.85

POTONGAN B - B POTONGAN A - A
SKALA 1 :40
SKALA 1 :40 NAMA GAMBAR SKALA
POTONGAN A - A &
1 : 40
POTONGAN B - B
(RUMAH POMPA)
TANGGAL KODE NO. LBR JML. LBR
400 CATATAN

SHOP DRAWING
RENCANA KEGIATAN
PIPA GALVANIS 3"
PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA

400
LOKASI
DUSUN
DESA BONTOJAI
KECAMATAN TAMALATEA
KABUPATEN JENEPONTO
40
PEMOHON

PONDASI COR 40 X 40 POSISI PONDASI COR


BETON BERTULANG

40
SKALA 1 :60
MENGETAHUI
400

260

DETAIL COR BETON BERTULANG


SKALA 1 : 20 MENYETUJUI
260

400

PERENCANA

NAMA GAMBAR SKALA


DENAH TOWER
1 : 60
PENAMPUNGAN AIR
PONDASI COR 40 X 40
BETON BERTULANG TANGGAL KODE NO. LBR JML. LBR
TOWER TAMPAK ATAS
SKALA 1 :60
CATATAN
260
BESI U 10.5.0,6 cm
15 15 10 10 10 10 10 10 10 10 10 15 15

SHOP DRAWING

38
RENCANA KEGIATAN

PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA

40
LOKASI
DUSUN

40
DESA BONTOJAI
KECAMATAN TAMALATEA

260
BESI U 10.5.0,6 cm
KABUPATEN JENEPONTO
40
40 PEMOHON

MENGETAHUI
38

DETAIL DUDUKAN BAK TAMPAK ATAS


SKALA 1 : 30 MENYETUJUI

15 15 10 10 10 10 10 10 10 10 10 15 15
10

260

POTONGAN A - A PERENCANA

SKALA 1 : 30

BESI U 5.10.0,6 cm

15 24 23 23 23 23 23 23 24 15

NAMA GAMBAR SKALA


10

DETAIL DAN POTONGAN


1 : 30
BAK DUDUKAN TOWER
260

TANGGAL KODE NO. LBR JML. LBR


POTONGAN B - B
SKALA 1 :30
CATATAN

260

BAK FIBER KAPASITAS 5 m3

SHOP DRAWING
RENCANA KEGIATAN

PEMBANGUNAN PASANGAN
SUMUR BOR + RUMAH POMPA

50
PLAT BESI 5 mm LOKASI
DUSUN
DESA BONTOJAI
KECAMATAN TAMALATEA
PIPA GALVANIS 3" KABUPATEN JENEPONTO
PEMOHON

BESI SIKU 60.60.6 mm

BESI SIKU 60.60.6 mm

MENGETAHUI

TANGGA BESI SIKU 50.50.5 mm

600
PIPA PENGURAS PVC 1,5" MENYETUJUI

TIANG MENARA BESI SIKU 80.80.8 mm

PERENCANA

PONDASI COR 40 X 40
BETON BERTULANG

PERMUKAAN TANAH

NAMA GAMBAR SKALA

PIPA SUPLAY PVC 1,5" TOWER TAMPAK DEPAN


1 : 50
PIPA DISTRIBUSI PVC 2"

TOWER TAMPAK DEPAN TANGGAL KODE NO. LBR JML. LBR

SKALA 1 :50