Anda di halaman 1dari 1

STIRRUPS

DOWEL BAR
SCEDULE OF PILE
TIE BEAM
150 150 TYPE DIA DIA NO DEPTH MAIN RING NOS.
OF OF OF OF OF STEEL OF PILE
pedestal pedestal
3-6 ø 3-6 ø
PILE PILE U/R U/R PILE(M)
20D 20D
D

D-150
75 TH. P.C.C
50

50

75
1 2 3 4 75 TH. B.F.S
75
75
11'-8" 9'-5" 11'-8"
150TH SAND FILLING
r
P2 300 750 02 6.00 5-10 ø 6-ø @150 C/C
h
C.L. OF.PILE
A
P2

P2

P2

P2
P3

P3

P3

P3

SECTION 1:1 P3 300 750 02 7.00 5-12 ø 8-ø @150 C/C


300300
P3

P3

11'-2"
00
12 h
r

150
pedestal 150 150
C.L.OF COLUMN T0TAL NOS OF PILE = 48
P2 P2

300300
600
B P3
P3 1 1

150
2'-5" STIRRUPS DOWEL BAR

75
P2 P2
C 600 600 300
P3
P3 75
300 TIE BEAM 150 150
TIE BEAM
P3
P3
DET.OF.PC3
3-6 ø pedestal pedestal 3-6ø
8'-11" 20D 20D

D-150
75 TH. P.C.C 75

50
50
75
75 TH. B.F.S 75
P3 P2 P2 150TH. SAND FILLING
P3
GROND LV. r h REIN DET OF PILE CAP
D P3
P3
C.L. OF.PILE
PILE PILE CAP NO.OF. NO.OF.
SECTION 2:2 CAP BELOWCOLUMN PILE.IN. PILE
h r

300/350
600
MARK THE.GOUP CAP 'D'
P3 P2 P2
P3
A1,A4,B3,B4,D3,D4,E1,
PC2 E2,E3,E4,F3,F4 2-12 ø 550 15-12 ø 14-12 ø
RING 300 300 PC3 A2,A3,C1,C2,D1,D2,F1, 3-12 ø 600 15-12 ø 14-10 ø
11'-4" 600 600
F4

75
300 300

150
MAIN STEEL 150 150

600
pedistal
2 2

150
P2 P2 P2 P2
1800

75
E DET.OF.PC1&PC2
P2 P2 P2 P2
C.L.OF COLUMN
11'-7"
P3

P3

1500
DU
F
P2

P2

P2

P2
P3

P3

P3
11'-8" 9'-5" P3

BUCKET LENGTH
11'-8"
TYPICAL DETS. OF DOUBLE
UNDER REAMED PILE

Anda mungkin juga menyukai