Revision 5
May 2005
WARNING
This document is the property of United Technologies Corporation (UTC). You may not possess, use,
copy, or disclose this document or any other information in it, for any purpose including without limitation
to design, manufacture, or repair parts, or to obtain FAA or other government approval to do so, without
United Technologies Corporation’s express written permission. Neither receipt nor possession of this
document alone, from any source, constitutes such permission. Possession, use, copying, or disclosure
by anyone without United Technologies Corporation’s express written permission is not authorized and
may result in criminal and/or civil liability.
Revision 5 2
PWPS CONTRACTOR SIGN-OFF SHEET (SHEET 1 OF 4)
NOTE
All individuals designated by the Contractor to perform checkout procedures in accordance with
this manual shall provide the following information prior to commencement of all system checkout procedures.
Revision 5 3
PWPS CONTRACTOR SIGN-OFF SHEET (SHEET 2 OF 4)
NOTE
All individuals designated by the Contractor to perform checkout procedures in accordance with
this manual shall provide the following information prior to commencement of all system checkout procedures.
Revision 5 4
PWPS CONTRACTOR SIGN-OFF SHEET (SHEET 3 OF 4)
NOTE
All individuals designated by the Contractor to perform checkout procedures in accordance with
this manual shall provide the following information prior to commencement of all system checkout procedures.
Revision 5 5
PWPS CONTRACTOR SIGN-OFF SHEET (SHEET 4 OF 4)
NOTE
All individuals designated by the Contractor to perform checkout procedures in accordance with
this manual shall provide the following information prior to commencement of all system checkout procedures.
Revision 5 6
FT8® COMMISSIONING MANUAL SIGN-OFF SHEETS REVISION RECORD
Revision 5 7
FT8TM COMMISSIONING MANUAL SWIFTPAC SIGN-OFF SHEETS
TEMPORARY REVISION RECORD (REV. 5)
TEMPORARY INCORPORATED
DATE OF ISSUE AFFECTED SECTION(S)
REVISION NUMBER INTO MANUAL
Procedure 35 (modified to
07-01 3/30/07 include the On-Line 3/30/07
Protective Relay Test)
Procedure 04 – Piping
08-02 12/17/08 Systems Inspection, Testing, 12/18/08
Cleaning And Fluid Fill
The checkout and start-up of the FT8 is the sole responsibility of the Customer through the Contractor.
PWPS, being very protective of the FT8 reputation and performance, supports this activity by providing an experienced site Checkout and Start-up Technical
Advisor (C&STA) and furnishing the Customer with copies of the FT8 Commissioning Manual and the FT8 Commissioning Manual Sign-Off sheets.
The PWPS Project Manager, prior to the commencement of the scheduled checkout activities, sends the C&STA to the site. While on site, C&STA activities
are directed by the PWPS Site Manager. His primary area of responsibility is to work with the Customer and the Contractor to ensure that all systems are
checked and started in accordance with current FT8 procedures. The C&STA does not schedule the checkout activities nor does he supervise the
contractor’s laborers.
2) Provides advice and suggestions to the Customer and Contractor regarding checkout and start-up of the FT8.
3) Works closely with the electrical and mechanical subcontractors to ensure adherence to the checkout procedures.
NOTE
The PWPS site manager, on the advice of the C&STA, will stop checkout activities if procedures are not being
followed.
4) Assists the Contractor in loading the control system software and adjusting the software tunables.
5) Coordinates the site activities of the electrical generator and fire protection system representatives and any other FT8 vendor representatives sent
to the site.
6) Ensures that the system checkout sheets are signed off and placed in the PWPS Site Managers master-commissioning book.
Revision 5 8
NOTE
The C&STA will check the commissioning book on a daily basis. If the sheets are not filled out in a timely fashion
after the checks have been completed, The PWPS site manager, on the advice of the C&STA, will stop checkout
activities until the data in the commissioning books catches up to the checks being done.
9) Does not assist in fixing, adjusting or setting instruments, controls, relays or other devises.
1) Has overall responsibility for both FT8 and Balance of Plant (BOP) checkout and start-up.
2) Is responsible for providing electrical, mechanical and controls labor to complete these tasks.
4) Is responsible, under the direction of the C&STA, for loading the control system software and adjusting the software tunables. This might be
accomplished using a dial-in phone connection in the control house, a PWPS controls representative on site, by the Customer/EPC Contractor
PWPS or by the C&STA through mutual consent.
5) Is responsible for scheduling and monitoring the checkout and start-up activities to meet the contractual dates.
6) Is responsible for providing the appropriate and necessary tooling, instruments and equipment to complete checkout of each procedure provided
in the FT8 Commissioning Manual. Test equipment shall have current, valid calibration stickers.
7) Will utilize the PWPS provided FT8 Commissioning Manual and sign off sheets to complete the checkout of the FT8 scope.
8) Is responsible for checking and setting, as required, all instruments, gauges, protective relays, meters and controls provided in the FT8 scope.
This includes recording all information required by the checkout procedures.
9) Is responsible for ensuring that each FT8 procedure has been completed as described and that the person doing the work or the foreman has
signed the corresponding sign off sheet.
Revision 5 9
10) Will ensure that the signed procedure sign off sheets have been copied and the originals are placed in the master-commissioning book. This master-
commissioning book shall have a record of all the latest checkout data prior to first fire and initial synchronization.
11) Will provide the PWPS site manager with the completed master-commissioning book and a complete set of as-built documentation for any changes
or modifications made during the installation and/or checkout phase. These documents will be used by PWPS to generate the customer required
as-built drawings
2.0 Safety
Because of its importance, site safety information is a prominent part of this manual. In order to insure safety at PWPS gas turbine installations, the
following rules must be adhered to:
The only time personnel are allowed in the gas turbine enclosure when the unit is operating is when the unit is at gas generator idle and/or
synchronous idle.
No personnel are allowed in the gas turbine enclosure during a start cycle. The start cycle is defined from initial rotation on the starter until the gas
generator reaches idle operating conditions. For dual engine configurations, this includes no personnel being allowed in the enclosure on the
opposite side not starting, even for de-coupled gas turbines.
No personnel are allowed in the gas turbine enclosure when the gas turbine is above synchronous idle speed (any time after breaker closure).
If one side of a dual engine configuration is operating, after the start cycle is completed, it is acceptable to be in the opposite side's enclosure if the
gas turbine is windmilling or de-coupled.
It is acceptable to enter the gas turbine enclosure when the gas generator is rotated on the starter only, start cycle not initiated, or during coast down
after the gas turbine has been shutdown (fuel shutoff).
All personnel must be at least 20 feet away from the gas turbine enclosure during start cycles. Start cycle is defined as from when the start horn
activates and until the gas turbine, including both sides of a dual engine configuration if both gas turbines are to be started, reach GG idle and / or
sync idle.
It is recommended that suitable high visibility tape or lines on ground be used to define the 20 feet boundary.
Recommended changes to this manual or any other Pratt and Whitney Power Systems manual may be submitted by anyone via email, standard ground mail
or facsimile transmission. If submitting a change via email, please transmit to: michael.cowan@pw.utc.com
Revision 5 10
If submitting via standard mail, please address to:
If submitting a manual change recommendation via facsimile transmission, please send to: (860) 565-8500. Address the facsimile cover sheet to the
attention of the Publications Supervisor, PWPS Customer Technical Services.
All Pratt and Whitney Manuals are subject to amplification and revision as additional information becomes available. Revised text is indicated by a black
vertical line in either margin of the page, adjacent to the affected text, like the one printed next to this paragraph. The change symbol identifies the addition
of either new information, a changed procedure, the correction of an error, or a rephrasing of the previous material .
WARNING
A procedure, practice or condition, etc. which may result in injury or death if not carefully observed or followed.
CAUTION
A procedure, practice, or condition, etc. which may result in damage to equipment if not carefully observed or followed.
NOTE
Revision 5 11
6.0 Use of Tools and Instrumentation On PWPS Equipment
All Subcontractor tools and/or instrumentation used for the installation and maintenance of PWPS equipment shall be calibrated and/or certified in
accordance with the specific tool or instrument manufacturer’s recommended calibration cycle.
All Subcontractor tools and/or instrumentation shall be used or operated in accordance with the specific tool or instrument manufacturers recommended
operating procedures
Revision 5 12
PROCEDURE 01 – SITE SPECIFIC DATA
Description S/N or Data Remarks
Project Number
Project Manager
Customer
Site
Unit #
Model
Engine(s)
Fuel
H2O Injection
Evaporative Cooler
Inlet Fogger
Water Wash
Control House
Synchronizer
Auxiliary WH Meter
Revision 5 15
HMI Monitor
Printer
Network Switch
Inverter
Micronet Name =
Vibration Monitor
Main Breaker
HV Bus Duct
MW Transducer
MVAR Transducer
Voltage Transducer
Current Transducer
Current Transformers
Potential transformers
LMV Driver A
GMV Driver A
LMV Driver B
GMV Driver B
CAB VFD A
Revision 5 16
H2O Injection VFD A
CAB VFD B
Remote UPS
GG A PWPS
LO Skid A
H2O Flowmeter A
LMV A
GMV A
Inlet Fogger A
Evaporative Cooler A
Engine Heater A
GG B PWPS
Revision 5 17
H2O Flowmeter B
LMV B
GMV B
Inlet Fogger B
Evaporative Cooler B
Engine Heater B
Generator Brush
Generator LO System
Centrifuge Skid
Revision 5 18
PROCEDURE 01 – NOTES OR DISCREPANCIES
Revision 5 19
PROCEDURE 02 - AIRCONDITIONER
DESCRIPTION UNITS UNIT 1 INITIALS DATE UNIT 2 INITIALS DATE REMARKS
VERIFY FREE ROTATION OF CONDENSER
FAN
A= A=
TOTAL AMPERAGE DRAW – COOLING CYCLE Amps B= B=
C= C=
A= A=
TOTAL AMPERAGE DRAW – HEATING CYCLE Amps B= B=
C= C=
CORRECT PHASE ROTATION AT UNIT
TERMINALS – A-B-C
CONDENSATE DRAINS INSTALLED
SET THERMOSTATS
UNIT 1
UNIT 2
Revision 5 20
PROCEDURE 03 - BATTERY BANKS AND CHARGER NOTE: Refer to PWPS drawing XXXX-187-E101D
OPERATING
DEVICE DESCRIPTION DEVICE TAG ADDRESS ACTION OBSERVATIONS INITIALS DATE
POINT
125 VDC BATTERY CHARGER 120 VDC LIFT 5 TO 6 AT 125 VDC ALARM
27DC125_1 2 – 5 - B – 37
VOLTAGE LOW FALLING BATTERY CHARGER ON SM
125 VDC BATTERY CHARGER JUMPER 7 TO 8 AT 125 VDC ALARM
59DC125 2 – 5 – B – 38 145 VDC RISING
VOLTAGE HIGH BATTERY CHARGER ON SM
125 VDC BATTERY CHARGER JUMPER 1 TO 2 AT 125 VDC ALARM
27_59AC125 2 – 5 – B – 39 NO AC INPUT
AC SUPPLY FAILURE BATTERY CHARGER ON SM
125 VDC BATTERY CHARGER SEE NOTE JUMPER 10 TO 11 AT 125 VDC ALARM
BCF125 2 – 5 – B – 40
FAILURE BELOW BATTERY CHARGER ON SM
125 VDC BATTERY CHARGER EITHER LEG JUMPER 13 TO 14 AT 125 VDC ALARM
64BG125 2 – 5 – B – 41
GROUND ALARM GROUNDED BATTERY CHARGER ON SM
24 VDC BATTERY CHARGER JUMPER 4 TO 5 AT 24 VDC ALARM
27DC24 2 – 5 – B – 42 23 VDC FALLING
VOLTAGE LOW BATTERY CHARGER ON SM
24 VDC BATTERY CHARGER JUMPER 7 TO 8 AT 24 VDC ALARM
59DC24 2 – 5 – B – 43 29.5 VDC RISING
VOLTAGE HIGH BATTERY CHARGER ON SM
24 VDC BATTERY CHARGER JUMPER 1 TO 2 AT 24 VDC ALARM
27_59AC24 2 – 5 – B – 44 NO AC INPUT
AC SUPPLY FAILURE BATTERY CHARGER ON SM
24 VDC BATTERY CHARGER SEE NOTE JUMPER 10 TO 11 AT 24 VDC ALARM
BCF24 2 – 5 – B – 45
FAILURE BELOW BATTERY CHARGER ON SM
24 VDC BATTERY CHARGER EITHER LEG JUMPER 13 TO 14 AT 24 VDC ALARM
64BG24 2 – 5 – B – 46
GROUND ALARM GROUNDED BATTERY CHARGER ON SM
NOTE: Loss of charger output will be accompanied by a battery charger failure or loss of AC power failure.
Revision 5 21
125 VDC Battery Bank Part Number:
Name: Date:
Cell No. Voltage Temp. F Cell No. Voltage Temp. F Cell No. Voltage Temp. F
1 21 41
2 22 42
3 23 43
4 24 44
5 25 45
6 26 46
7 27 47
8 28 48
9 29 49
10 30 50
11 31 51
12 32 52
13 33 53
14 34 54
15 35 55
16 36 56
17 37 57
18 38 58
19 39 59
20 40 60
Revision 5 22
24 VDC Battery Bank Part Number:
Name: Date:
Cell No. Voltage Temp. F Cell No. Voltage Temp. F Cell No. Voltage Temp. F
1 5 9
2 6 10
3 7 11
4 8 12
Revision 5 23
PROCEDURE 04 – PIPING SYSTEMS INSPECTION, TESTING, CLEANING and FLUID FILL
4.4 SYSTEMS INSPECTION
ENGINE ENGINE
DESCRIPTION REMARKS INITIALS DATE
A B
Gas Turbine Instrumentation
Liquid Fuel System
Gas Fuel System
Water Injection System
Hydraulic System
GG/PT Lube Oil
Hydraulic Start
Bleed Air System
Thrust Balance System
Muscle Air System
Engine Drying System
Fire Protection System
Buffer Air System
Water Wash
Vent and Drain
Inlet Fogging System
Evaporative Cooler System
Generator Lube Oil System
Balance of Plant
Revision 5 24
Gas Fuel
Liquid Fuel
Demineralized Water
Potable water
Plant Air
Equipment Skid Drains
Revision 5 25
F-101 HYDRAULIC START SYSTEM FILTER
LIQUID FUEL
GAS FUEL
DEMINERALIZED WATER
POTABLE WATER
PLANT AIR
FLUSHING COMPLETED
PIPING RESTORED
Revision 5 26
LEAK CHECK COMPLETED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
Revision 5 27
PUMP LUBE OK
FAN LUBE OK
FLUSHING COMPLETED
PIPING RESTORED
ITEM CHECKED INITIALS DATE ITEM CHECKED INITIALS DATE ITEM CHECKED INITIALS DATE
FLUSHING COMPLETED
PIPING RESTORED
ACM 501 ACCUMULATOR
PRECHARGE SET
A601 ACCUMULATOR PRECHARGE
SET
LEAK CHECK COMPLETED
PUMP LUBE OK
Revision 5 28
CHECK PUMP ALIGNMENT
ITEM CHECKED INITIALS DATE ITEM CHECKED INITIALS DATE ITEM CHECKED INITIALS DATE
FLUSHING COMPLETED
PIPING RESTORED
ACM 501 ACCUMULATOR
PRECHARGE SET
A 601 ACCUMULATOR PRECHARGE
SET
LEAK CHECK COMPLETED
PUMP LUBE OK
FLUSHING COMPLETED
PIPING RESTORED
PUMP LUBE OK
Revision 5 29
TASK REMARKS INITIALS DATE
CLEANING COMPLETED
PIPING RESTORED
CLEANING COMPLETED
PIPING RESTORED
CLEANING COMPLETED
PIPING RESTORED
MOTOR LUBE OK
CLEANING COMPLETED
PIPING RESTORED
MOTOR LUBE OK
Revision 5 30
4.8.7 WATER INJECTION SYSTEM FLUSHING – ENGINE A
FLUSHING COMPLETED
PIPING RESTORED
LUBRICANTS OK
FLUSHING COMPLETED
PIPING RESTORED
LUBRICANTS OK
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
Revision 5 31
LEAK CHECK COMPLETED
Revision 5 32
COMPRESSED AIR SYSTEM – ENGINE A
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
Revision 5 33
4.8.14 INLET FOGGER – ENGINE A
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
FLUSHING COMPLETED
PIPING RESTORED
Revision 5 34
Pratt and Whitney Power Systems, Inc.
Commissioning Manual Sign-Off Sheets (Swift Pac) – Revision 5
TEMPORARY REVISION NO. 08-02
Please insert this Temporary Revision 08-02 in the Commissioning Manual Sign-Off Sheets Rev 5, before page 35.
4.8.16 FUEL NOZZLE LOCKWIRE – ENGINE A
Revision 5 35
TR 08-02, Page 1 of 1
PROCEDURE 05 - FUEL, WATER AND LUBE OIL SAMPLING
DATE DATE RESULTS COPY OF TEST
SYSTEM REMARKS INICIALES FECHA
SAMPLED RETURNED RESULTS INCLUDED
LIQUID FUEL SAMPLE
NOTES: 1. All sampling procedures shall be in accordance with PWPS specifications and site instructions.
Revision 5 36
6.0 – JUNCTION BOX INSPECTION
JB E - ENCLOSURE
JB FC – ENCLOSURE
JB FP - ENCLOSURE
JB P – ENCLOSURE
JBP1 - ENCLOSURE
JBL C - ENCLOSURE
JB L – LUBE SKID
JB F2 – FUEL PLATE
ENGINE HEATER
Revision 5 37
INLET AIR FOGGER SKID
ENGINE ENCLOSURE QUICK
DISCONNECTS
LIQUID FUEL DUPLEX FILTER
GENERATOR INSTRUMENTATION
GENERATOR POWER
NEUTRAL CUBICAL
JB A – ENCLOSURE
T5 EGT THERMOCOUPLES
Revision 5 38
Diode Installation
Device Location A B Remarks
SOV103 HS C/5-C/6
SOV104 HS C/7-C8
SOV601 P 21-22
SOV603 TR 2/32-2/33
SOV604 L 78-79
SOV605 L 88-89
SOV701 P 23-24
SOV801 W 2/1-2/2
SOV802 W 2/3-2/4
SOV1001 F1 1/1-1/2
SOV1002 F1 1/3-1/4
SOV1101 F1 1/5 – 1/6
SOV1102 F1 1/8 – 1/9
SOV1103 DLN Only
SOV1104 DLN Only
SOV1105 F1 1/11 – 1/12
SOV1301 TR 2/35-2/36
SOV1401 F1 1/13 – 1/14
SOV1402 F1 1/15 – 1/16
SOV1403 F1 1/17-1/18
SOV1404 F1 1/19-1/20
SOV1405 F1 1/21 – 1/22
SOV1406 F1 1/23-1/24
SOV1407 F1 1/25-1/26 Not on liquid only
EC017 TR 2/29 – 2/30
EC003 TL 1/19-1/20
EC004 TL 1/22-1/23
EC005 TL 1/25-1/26
EC006 TL 1/28-1/29
EC007 TR 1/26-1/27
EC008 TR 1/29-1/30
EC009 TR 1/32-1/33
Revision 5 39
PROCEDURE 06 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 40
PROCEDURE 07 – GROUNDING ELECTRODE SYSTEM AND EQUIPMENT GORUNDING CONDUCTOR VISUAL INSPECTION
AREA OR SYSTEM ENGINE A ENGINE B REMARKS INITIALS DATE
GENERATOR
NEUTRAL CUBICLE
MAIN TRANSFORMER
AUXILIARY TRANSFORMER
CONTROL ENCLOSURE
BATTERY CHARGER
BATTERY RACK
ELECTRONIC CABINETS
RELAY CABINETS
Revision 5 41
LIQUID FUEL FORWARDING SKID
Revision 5 42
PROCEDURE 08 - INLET FILTER, INLET PLENUM, ENGINE INLET AND GENERATOR INSPECTIONS
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
INLET FILTER
INLET PLENUM
ENGINE INLET
INLET FOGGER
EVAPORATIVE COOLER
GENERATOR INTERNAL
Revision 5 43
PROCEDURE 9 – MCC AND MOTOR ROTATION
INITIALS DATE
MCC BUS Megger 5) 5) 5)
2) 2) 2)
OVERLOAD RESETS IN AUTOMATIC
A TO B B TO C A TO C
H3004 5.0 KW 1) 1) 1) 3) A=
GENERATOR LUBE OIL 7A B=
HEATER 2) 2) 2) 4) C=
AC3005 1.7 KW 1) 1) 1) 3) A=
GENERATOR LUBE OIL 7BL B=
COOLING FAN # 1 2) 2) 2) 4) C=
AC3007 1.7 KW 1) 1) 1) 3) A=
GENERATOR LUBE OIL 7BR B=
COOLING FAN # 2 2) 2) 2) 4) C=
MS3001 7.5 KW 1) 1) 1) 3) A=
GENERATOR LUBE OIL 7CL B=
PUMP # 1 2) 2) 2) 4)
Revision 5 44
C=
MS3003 7.5 KW 1) 1) 1) 3) A=
GENERATOR LUBE OIL 7 CR B=
PUMP # 2 2) 2) 2) 4) C=
Revision 5 45
AC3006 .55 KW 1) 1) 1) 3) A=
GENERATOR VAPOR 7D B=
EXTRACTOR FAN 2) 2) 2) 4) C=
H3001 5.0 KW 1) 1) 1) 3) A=
GENERATOR/EXCITER 7E B=
SPACE HEATER 2) 2) 2) 4) C=
AC103 0.5 HP 1) 1) 1) 3) A=
GT HYDRAULIC STARTER 8A B=
OIL COOLER FAN 2) 2) 2) 4) C=
Y-∆STARTER 150 HP - GT A=
1) 1) 1) 3)
HYDRAULIC STARTER
8B B=
PUMP # 1 (Winding
2) 2) 2) 4)
resistance at 1) ) C=
AC1501A 10 HP 1) 1) 1) 3) A=
GT A SECONDARY AIR 9AL B=
FAN # 1 2) 2) 2) 4) C=
AC1502A 10 HP 1) 1) 1) 3) A=
GT A SECONDARY AIR 9AR B=
FAN # 2 2) 2) 2) 4) C=
MS601A 20 HP 1) 1) 1) 3) A=
POWER TURBINE A LUBE 9BL B=
OIL PUMP # 1 2) 2) 2) 4) C=
MS603A 20 HP 1) 1) 1) 3) A=
POWER TURBINE A LUBE 9BR B=
OIL PUMP # 2 2) 2) 2) 4) C=
1) 1) 1) 3) A=
HC601A 4.5 KW
9CL B=
Revision 5 46
GT A LUBE OIL HEATER 2) 2) 2) 4) C=
ACC601 5.0 HP 1) 1) 1) 3) A=
GT A LUBE OIL COOLING 9CR B=
FAN 2) 2) 2) 4) C=
VP601A 1.5 HP 1) 1) 1) 3) A=
GT A LUBE OIL VACUUM 9DL B=
PUMP 2) 2) 2) 4) C=
Revision 5 47
1) 1) 1) 3) A=
SPARE 9DR B=
2) 2) 2) 4) C=
M1601A 5.0 HP 1) 1) 1) 3) A=
GT A COLD AIR BUFFER 10A B=
HEAT EXCHANGER 2) 2) 2) 4) C=
M1601B 5.0 HP 1) 1) 1) 3) A=
GT B COLD AIR BUFFER 10B B=
HEAT EXCHANGER 2) 2) 2) 4) C=
AC1501B 10 HP 1) 1) 1) 3) A=
GT B SECONDARY AIR 11AL B=
FAN # 1 2) 2) 2) 4) C=
AC1502B 10 HP 1) 1) 1) 3) A=
GT B SECONDARY AIR 11AR B=
FAN # 2 2) 2) 2) 4) C=
MS601B 20 HP 1) 1) 1) 3) A=
POWER TURBINE B LUBE 11BL B=
OIL PUMP # 1 2) 2) 2) 4) C=
MS603B 20 HP 1) 1) 1) 3) A=
POWER TURBINE B LUBE 11BL B=
OIL PUMP # 2 2) 2) 2) 4) C=
1) 1) 1) 3) A=
H601B
11CL B=
GT B LUBE OIL HEATER
2) 2) 2) 4)
C=
AC601B 5.0 HP 1) 1) 1) 3) A=
GT B LUBE OIL COOLING 11CR B=
Revision 5 48
FAN 2) 2) 2) 4) C=
VP601B 1.5 HP 1) 1) 1) 3) A=
GT B AC LUBE OIL 11DL B=
VACUUM PUMP 2) 2) 2) 4) C=
1) 1) 1) 3) A=
SPARE 11DR B=
2) 2) 2) 4) C=
Revision 5 49
M801A 1) 1) 1) 3) A=
VSD801
GT A WATER INJECTION B=
A
PUMP 2) 2) 2) 4)
C=
M801B 1) 1) 1) 3) A=
VSD801
GT B WATER INJECTION B=
B
PUMP 2) 2) 2) 4)
C=
Revision 5 50
PANEL ACD 1 (110/220 VAC, 1-PHASE)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
MAIN BREAKER MAIN 2 ACD 1
SPARE 3 1 ACD 1
INVERTER 11 1 ACD 1
METERING 15 1 ACD 1
Revision 5 51
GT “B” ENCLOSURE LIGHTS 24 and 26 2 ACD 1
SPARE 31 1 ACD 1
SPARE 42 1 ACD 1
Revision 5 52
PANEL ACD 2 (380/480 VAC, 3-PHASE)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
HYDRAULIC STARTER OIL HEATER 1 3 (20A) ACD 2
GAS TURBINE “A” WATER INJECTION VARIABLE SPEED DRIVE 7 3 (100A) ACD 2
GAS TURBINE “B” WATER INJECTION VARIABLE SPEED DRIVE 8 3 (100A) ACD 2
Revision 5 53
PANEL ACD 3 (110/220 VAC HEAT TRACING)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
MAIN BREAKER MAIN 2 ACD 3
Revision 5 54
H1004B 20 1 (20A) ACD 3
Revision 5 55
PANEL ACD 4 (55 – 0 – 55 VAC)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
MAIN BREAKER MAIN 2 ACD 4
Revision 5 56
PANEL ACD 5 (230 VAC)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
MAIN BREAKER MAIN 1 ACD 5
Revision 5 57
PANEL DCD 1 (125 VDC)
TEST RESISTANCE DATE
DESCRIPTION CIRCUIT POLES INITIALS
POINT CHECK ENERGIZED
MAIN BREAKER MAIN 2 DCD 1
SPARE 7 2 DCD 1
SPARE 10 2 DCD 1
SPARE 19 2 DCD 1
SPARE 20 2 DCD 1
Revision 5 58
PANEL DCD 2 (24 VDC)
TEST RESISTANCE
DESCRIPTION CIRCUIT POLES INITIALS DATE
POINT CHECK
MAIN BREAKER MAIN 2 DCD 2
SPARE 9 DCD 2
SPARE 19 2 DCD 2
SPARE 20 2 DCD 2
Revision 5 59
PROCEDURE 9 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 60
PROCEDURE 10 - NL AND NH ROTATION
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
NL ROTATION
NH ROTATION
Revision 5 61
PROCEDURE 11 - VIBRATION MONITOR
CONTROL INPUTS DISCRETE ADDRESS FUNCTIONAL TEST INITIALS DATE
CONTROL OUTPUT
SYSTEM CONTACTS – TRIP MULTIPLY VRM39A
2-3-11 C-37/38
CONTROL INPUT
OK RELAY – MALFUNCTION VAM39A
2-5-B B-6/33
DANGER RELAY ACTIVATED E SLOT 4 CH 2
SLOT 6 CH 2 86EX TRIP 1-7-C/71
B/N SLOT 7 CH 1 SLOT 3 CH 1,2,3,4
Revision 5 62
PT INLET BENTLY
1 Mils 2 Mils
VT002B CHANNEL 2 SLOT 6 CH 3
PT EXHAUST BENTLY
3 Mils 4 Mils+
VT003B CHANNEL 3 SLOT 6 CH 2
29 mm/sec
WATER INJECTION for N/A
10 Seconds
80 mm/sec.
ALIGNMENT for N/A
1800 Seconds
Revision 5 63
VIBRATION PROBE - Y – EXCITER END GAP VOLTAGE - 9.5 to -10 VDC
Revision 5 64
PROCEDURE 12 - MANUAL TRANSFER SWITCH
DESCRIPTION REMARKS INITIALS DATE
PHASE SEQUENCE RELATIONSHIP
EMERGENCY AND NORMAL POWER
KEY INTERLOCK VERIFICATION
Revision 5 65
PROCEDURE 13 - AUTOMATIC TRANSFER SWITCH NOTE: Refer to PWPS drawings XXXX-185-E600D, XXXX-1870E101D and ASCO 940 Operators Manual
Revision 5 66
PROCEDURE 14 - GAS TURBINE ENGINE HEAT SYSTEM NOTE: Refer to PWPS drawing XXXX-187-E101D
Revision 5 67
PROCEDURE 14 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 68
PROCEDURE 15 - LOADING SOFTWARE
DESCRIPTION VERSION NUMBER REMARKS INITIALS DATE
Revision 5 69
PROCEDURE 16 - ENGINE AND UNIT CONTROL
16A DISCRETE INPUTS – PRESSURE, TEMPERATURE, LEVEL AND POSITION SWITCHES
NOTE: Refer to PWPS drawing XXXX-187-E101D
ENGINE A
RESIST. RESIST.
CALIBRATION
INPUT POLE TO POLE TO RESIST. TO SWITCH
DESCRIPTION VALUE – INITIALS DATE
ADDRESS POLE - POLE - GROUND OPERATION
SP/ACTUAL
CLOSED OPEN
Revision 5 70
PSH 1301A - ENGINE BLEED HIGH
2 – 3 IN 21 10 PSI R CLOSE ON HIGH
PRESSURE SWITCH
ENGINE B
RESIST. RESIST.
CALIBRATION
INPUT POLE TO POLE TO RESIST. TO SWITCH
DESCRIPTION VALUE – INITIALS DATE
ADDRESS POLE - POLE - GROUND OPERATION
SP/ACTUAL
CLOSED OPEN
Revision 5 71
PDSH1101B – FILTER DIFFERENTIAL 10 PSI R
2-4 IN 29 CLOSE ON HIGH
PRESSURE HIGH
Revision 5 72
PSL 3002 - GENERATOR LUBE – DC 18.8
2 – 5 IN 4 GD OPEN ON LOW
PUMP DISCHARGE PRESSURE LOW PSI R
Revision 5 73
LSLL601A - GT A LUBE LEVEL 7-INCH
2-3-A-40 L OPEN ON LOW
LOW - LOW OIL
Revision 5 74
ZS605A – GT “A” LUBE OIL ASSIST CLOSED WHEN
2-3-A-33 L CLOSED VALVE CLOSED
VALVE
CLOSED WHEN
ZS1001A – LIQUID FUEL FIRE VALV E 2-3-A-34 LF CLOSED
FV CLOSED
CLOSED WHEN
ZS1101A – GAS FUEL FIRE VALV E 2-4-A-34 LF CLOSED FV CLOSED
CLOSED WHEN
ZS1101B – GAS FUEL FIRE VALVE 2-4-A-35 GF CLOSED FV CLOSED
OPEN WITH
ZS3301 – GENERATOR DAMPER #1 2-5-A-15 G5 OPEN DAMPER
CLOSED
OPEN WITH
ZS3302 – GENERATOR DAMPER #2 2-5-A-16 G5 OPEN DAMPER
CLOSED
52G_CLSD – GENERATOR BREAKER OPEN WITH
1-7-A-16 TB-S2 OPEN
CLOSED (MOC) BREAKER OPEN
CLOSED WITH
52G_TEST – GENERATOR BREAKER
1-7-A-17 TB-S2 CLOSED BREAKER IN
IN TEST POSITION (TOC)
TEST POSITION
Revision 5 75
16B DISCRETE INPUTS – OTHER CONTACT CLOSURES NOTE: Refer to PWPS drawing XXXX-187-E101D
INPUT
CONTROL INPUT DISCRETE REMARKS INITIALS DATE
ADDRESS
MANUAL SPEED LOWER 18 – 1L 1-11-4-2-01
Revision 5 76
XS3602 – AUTOMATIC VOLTAGE
1-7-A-30
REGULATOR FAULT
Revision 5 77
16C T5.0 THERMOCOUPLES (Cr, Al, Type K) NOTE: Refer to PWPS drawing XXXX-187-E101D
ENGINE A
LOWER UPPER RESISTANCE RESISTANCE
INPUT TEST CALIBRATION
DESCRIPTION CALIBRATION CALIBRATION POLE TO TO GROUND INITIALS DATE
ADDRESS POINT OFFSET / GAIN
VALUE VALUE POLE (OHMS) (OHMS)
O=
TE001A 1-8-A-1 AT ENGINE A 0°F +1700°F
G=
O=
TE002A 1-8-A-2 AT ENGINE A 0°F +1700°F
G=
O=
TE003A 1-8-A-3 AT ENGINE A 0°F +1700°F
G=
O=
TE004A 1-8-A-4 AT ENGINE A 0°F +1700°F
G=
O=
TE005A 1-8-A-5 AT ENGINE A 0°F +1700°F
G=
O=
TE006A 1-8-A-6 AT ENGINE A 0°F +1700°F
G=
O=
TE007A 1-8-A-7 AT ENGINE A 0°F +1700°F
G=
O=
TE008A 1-8-A-8 AT ENGINE A 0°F +1700°F
G=
O=
TE009A 1-8-A-9 AT ENGINE A 0°F +1700°F
G=
ENGINE B
O=
TE001B 1-8-B-13 AT ENGINE B 0°F +1700°F
G=
O=
TE002B 1-8-B-14 AT ENGINE B 0°F +1700°F
G=
Revision 5 78
O=
TE003B 1-8-B-15 AT ENGINE B 0°F +1700°F
G=
O=
TE004B 1-8-B-16 AT ENGINE B 0°F +1700°F
G=
O=
TE005B 1-8-B-17 AT ENGINE B 0°F +1700°F
G=
O=
TE006B 1-8-B-18 AT ENGINE B 0°F +1700°F
G=
O=
TE007B 1-8-B-19 AT ENGINE B 0°F +1700°F
G=
O=
TE008B 1-8-B-20 AT ENGINE B 0°F +1700°F
G=
O=
TE009B 1-8-B-21 AT ENGINE B 0°F +1700°F
G=
Revision 5 79
16D RTDs 100 OHM ANALOG INPUTS NOTE: Refer to PWPS drawing XXXX-187-E101D and XXXX-187-E303D
ENGINE A
LOW / HIGH RESISTANCE COMMON
INPUT TEST GROUND CALIBRATION
DESCRIPTION CALIBRATION ELEMENT RESISTANCE INITIALS DATE
ADDRESS POINT RESISTANCE OFFSET/GAIN
VALUE (OHMS) (OHMS)
1–11–2–3–1 L = - 40° F O=
TE010A – T1.7 RTD
100 OHMS AT 0° C
1–11–2–3–1
6–5/4 H = 500° F G=
TE601A – LOW TANK 1–11–2–5–1 L = - 40° F O=
TEMPERATURE RTD 1–11–2–5–1
100 OHMS AT 0° C 6–5/4 H = 500° F G=
TE603A – PT A #8 AND #9 1–11–2–5–2 L = - 40° F O=
BEARINGS SCAVENGE
1–11–2–5–2
TEMPERATURE RTD
10–9/8 H = 500° F G=
100 OHMS AT 0° C
TE604A – PT A #7 1–11–2–5–3 L = - 40° F O=
BEARING SCAVENGE
1–11–2–5–3
TEMPERATURE RTD H = 500° F G=
14–13/12
100 OHMS AT 0° C
TE607A – PT A #4 AND #5 1–11–2–4–2 L = - 40° F O=
BEARING SCAVENGE
1–11–2–4–2
TEMPERATURE RTD
10–9/8 H = 500° F G=
100 OHMS AT 0° C
TE801A – WATER 1–11–2–4–1 L = - 40° F O=
INJECTION INLET
1–11–2–4–1
TEMPERATURE RTD H = 500° F G=
5–6/4/7
100 OHMS AT 0° C
TE1001A – LIQUID FUEL 1–11–2–3–6 L = - 40° F O=
INLET TEMPERATURE RTD 1–11–2–3–6
100 OHMS AT 0° C 26–25/24 H = 500° F G=
TE1002A – LIQUID FUEL 1–11–2–3–2 L = - 40° F O=
SOV INLET TEMPERATURE 1–11–2–3–2
RTD - 100 OHMS AT 0° C 10–9/8 H = 500° F G=
TE1101A – GAS FUEL 1–11–2–3–3 L = - 40° F O=
INLET TEMPERATURE RTD 1–11–2–3–3
100 OHMS AT 0° C 14–13/12 H = 500° F G=
TE1103A – GAS FUEL 1–11–2–4–5
INLET TEMPERATURE RTD 1–11–2–4–5 L = - 40° F O=
100 OHMS AT 0° C 22-21/20
TE1501A – ENCLOSURE 1–11–2–3–4 L = - 40° F O=
ENGINE TEMPERATURE 1–11–2–3–4
RTD - 100 OHMS AT 0° C 18–17/16 H = 500° F G=
Revision 5 80
TE1502A – ENCLOSURE 1–11–2–3–5 L = - 40° F O=
EXHAUST TEMPERATURE 1–11–2–3–5
RTD - 100 OHMS AT 0°C 22–21/20 H = 500° F G=
TE1601A - #4 AND #5 1–11–2–4–3 L = - 40° F O=
BEARING AIR SUPPLY RTD 1–11–2–4–3
100 OHMS AT 0°C 14–13/12 H = 500° F G=
TE1602A - #6 BEARING AIR 1–11–2–4–4 L = - 40° F O=
SUPPLY RTD 1–11–2–4–4
100 OHMS AT 0°C 18–17/16 H = 500° F G=
ENGINE B
1–11–3–3–1 L = - 40° F O=
TE010B – T1.7 RTD
100 OHMS AT 0° C
1–11–3–3–1
6–5/4 H = 500° F G=
TE601B – LOW TANK 1–11–3–5–1 L = - 40° F O=
TEMPERATURE RTD 1–11–3–5–1
100 OHMS AT 0° C 6–5/4 H = 500° F G=
TE603B – PT A #8 AND #9 1–11–3–5–2 L = - 40° F O=
BEARINGS SCAVENGE
1–11–3–5–2
TEMPERATURE RTD
10–9/8 H = 500° F G=
100 OHMS AT 0° C
TE604B – PT A #7 1–11–3–5–3 L = - 40° F O=
BEARING SCAVENGE
1–11–3–5–3
TEMPERATURE RTD H = 500° F G=
14–13/12
100 OHMS AT 0° C
TE607B – PT A #4 AND #5 1–11–3–4–2 L = - 40° F O=
BEARING SCAVENGE
1–11–3–4–2
TEMPERATURE RTD
10–9/8 H = 500° F G=
100 OHMS AT 0° C
TE801B – WATER 1–11–3–4–1 L = - 40° F O=
INJECTION INLET
1–11–3–4–1
TEMPERATURE RTD H = 500° F G=
5–6/4/7
100 OHMS AT 0° C
TE1001B – LIQUID FUEL 1–11–3–3–3 L = - 40° F O=
INLET TEMPERATURE RTD 1–11–3–3–3
100 OHMS AT 0° C 26–25/24 H = 500° F G=
TE1002B – LIQUID FUEL 1–11–3–3–2 L = - 40° F O=
SOV INLET TEMPERATURE 1–11–3–3–2
RTD - 100 OHMS AT 0° C 10–9/8 H = 500° F G=
TE1101B – GAS FUEL 1–11–3–2–4 L = - 40° F O=
INLET TEMPERATURE RTD 1–11–3–2–4
100 OHMS AT 0° C 14–13/12 H = 500° F G=
Revision 5 81
TE1103B – GAS FUEL 1–11–2–4–5 L = - 40° F O=
INLET TEMPERATURE RTD 1–11–3–4–5
100 OHMS AT 0° C 22-21/20 H = 500° F G=
TE1501B – ENCLOSURE 1–11–3–3–4 L = - 40° F O=
ENGINE TEMPERATURE 1–11–3–3–4
RTD - 100 OHMS AT 0° C 18– 17/16 H = 500° F G=
TE1502B – ENCLOSURE 1–11–3–3–5 L = - 40° F O=
EXHAUST TEMPERATURE 1–11–3–3–5
RTD - 100 OHMS AT 0°C 22–21/20 H = 500° F G=
TE1601B - #4 AND #5 1–11–3–4–3 L = - 40° F O=
BEARING AIR SUPPLY RTD 1–11–3–4–3
100 OHMS AT 0°C 14–13/12 H = 500° F G=
TE1602B - #6 BEARING AIR 1–11–3–4–4 L = - 40° F O=
SUPPLY RTD 1–11–3–4–4
100 OHMS AT 0°C 18–17/16 H = 500° F G=
Revision 5 82
16E NL, NH, NP SPEED TRANSDUCERS NOTE: Refer to PWPS drawing XXXX-187-E101D
ENGINE A
CONTINUITY RESISTANCE RESISTANCE TO
INPUT APPROXIMATE SIGNAL
DESCRIPTION TEST POLE TO POLE GRD. INITIALS DATE
ADDRESS RESISTANCE INJECTION
POINT (OHMS) (OHMS)
1–5–A–1
ST001A – SPEED, LOW
ROTOR (NL SENSOR #1)
1–5–A–1 200 Ohms
1–45/2
1–5–A–2
ST002A – SPEED, LOW
ROTOR (NL SENSOR #2)
1–5–A–2 200 Ohms
48–5/49
1–3–A–1
ST003A – SPEED, HIGH
1–3–A–1 200 Ohms
ROTOR (NH SENSOR #1)
20–21/2
1–4–A–1
ST004A – SPEED, HIGH
1–4–A–1 200 Ohms
ROTOR (NH SENSOR #2)
20–21/2
SLOT 2 CH 1
ST005A – SPEED, HIGH BENTLY
200 Ohms
ROTOR (NH SENSOR #3) VIBRATION
KPH - COM
1–4–A–2
ST006A – SPEED, POWER
TURBINE (NP SENSOR #1)
1–4–A–2 200 Ohms
22–23/4
1–3–A–2
ST007A – SPEED, POWER
TURBINE (NP SENSOR #1)
1–3–A–2 200 Ohms
22–23/4
ST008A – SPEED, POWER
AIRPAX
TURBINE. REFER TO AIRPAX
200 Ohms
SHEET 14 OF XXXX-187- N3 TACH
E101D
TB2/7–8/9
ENGINE B
1–5–A–3
ST001B – SPEED, LOW
1–5–A–3 200 Ohms
ROTOR (NL SENSOR #1)
8–52/4
1–5–A–4
ST002B – SPEED, LOW
ROTOR (NL SENSOR #2)
1–5–A–4 200 Ohms
55–12/56
Revision 5 83
1–3–A–3
ST003B – SPEED, HIGH
1–3–A–3 200 Ohms
ROTOR (NH SENSOR #1)
24–25/6
1–4–A–3
ST004B – SPEED, HIGH
1–4–A–3 200 Ohms
ROTOR (NH SENSOR #2)
24–25/6
SLOT 2 CH 2
ST005B – SPEED, HIGH BENTLY
200 Ohms
ROTOR (NH SENSOR #3) VIBRATION
KPH - COM
1–4–A–4
ST006B – SPEED, POWER
TURBINE (NP SENSOR #1)
1–4–A–4 200 Ohms
26–27/8
1–3–A–4
ST007B – SPEED, POWER
TURBINE (NP SENSOR #1)
1–3–A–4 200 Ohms
26–27/8
ST008B – SPEED, POWER
MTB 2
TURBINE. REFER TO AIRPAX
SHEET 14 OF XXXX-187-
200 Ohms
N3 TACH
E101D
54–55/56
Revision 5 84
16F PRESSURE TRANSDUCERS NOTE: Refer to PWPS drawing XXXX-187-E101D – Analog Inputs
ENGINE A
RESIST
RESIST
APPROX. LOW / HIGH POLE
INPUT TEST TO CALIBRA.
DESCRIPTION LOC RESIST. CALIB. TO INITIALS DATE
ADDRESS POINT GRD. OFFSET / GAIN
(OHMS) VALUE POLE
(OHMS)
(0HMS)
Revision 5 85
PT616A – PT LUBE OIL SUPPLY 1–6–A–2 L = 0 PSIG O=
TR 1–6–A–2 1 – 1.5M
PRESSURE H = 200 PSIG G=
40–42
Revision 5 86
ENGINE B
RESIST
RESIST
APPROX. LOW / HIGH POLE
INPUT TEST TO CALIBRA.
DESCRIPTION LOC RESIST. CALIB. TO INITIALS DATE
ADDRESS POINT GRD. OFFSET / GAIN
(OHMS) VALUE POLE
(OHMS)
(OHMS)
Revision 5 87
PT620B – # 7 BEARING 1–11–3–1–3 L = 0 PSIA O=
TL 1–11–3–1–3 1 – 1.5M
SCAVENGE PRESSURE H = 50 PSIA G=
12–13/15
1–6–B–21 L = 0 PSIG O=
PT1701B – THRUST BALANCE
TR 1–6–B–21 1 – 1.5M
SECONDARY PRESSURE H = 200 PSIG G=
27–29/28
Revision 5 88
HYDRAULIC START AND GENERATOR
RESIST
RESIST
APPROX. LOW / HIGH POLE
INPUT TEST TO CALIBRA.
DESCRIPTION LOC RESIST. CALIB. TO INITIALS DATE
ADDRESS POINT GRD. OFFSET / GAIN
(OHMS) VALUE POLE
(OHMS)
(OHMS)
1–11–2–2–6 L = 0 PSIG O=
PT3004 – GENERATOR OIL
GA 1–11–2–2–6 1 – 1.5M
PRESSURE SUPPLY H = 72.5 PSIG G=
24–25/27
Revision 5 89
16G CLUTCH, IGNITORS AND SHUT-OFF VALVES (SOVs) NOTE: Refer to PWPS drawing XXXX-187-E101D
ENGINE A
RESIST
TEST APPROX. POLE RESIST
OUTPUT CONDITION OPERATIONAL
TAG DESCRIPTION POINT RESIST TO TO GRD INITIALS DATE
ADDRESS REQUIRED TEST
MTB (OHMS) POLE (OHMS)
(OHMS)
13TH STAGE BLEED SHUT-OFF
EC003A 1–10–A–25 2A–39/40 N 30
VALVE
Revision 5 90
GAS FUEL SHUT-OFF VALVE
SOV1102A 1–10–A–2 2A–3/4 Y 1400
#2
PT SCAVENGE PRESSURE
SOV603A 1–10–A–11 2A–21/22 N 235
SHUTTLE VALVE
Revision 5 91
MTB2/FU25-
SOV604A GT SCAVENGE ASSIST 2–3–C–21 N 250
MTB2–47
MTB2/FU25-
SOV605A GT A OIL ASSIST 2–3–C–22 N 250
MTB2–48
MTB1/FU23–
SOV103 HYDRAULIC START ENGINE A 2–2–C–19 N
MTB1/39
MTB1/FU23
SOV104 HYDRAULIC START ENGINE B 2–2–C–20 N
MTB1/40
ENGINE B
13TH STAGE BLEED SHUT-
EC003B 1–10–B–57 3A–39/40 N 30
OFF VALVE
EXCITER / IGNITOR
IGN001B
VOLTAGE
Revision 5 92
LIQUID FUEL SHUT-OFF
SOV1002B 1–10–B–36 3A–5/6 Y 750
VALVE #2
PT SCAVENGE PRESSURE
SOV603B 1–10–B–43 3A–21/22 N 235
SHUTTLE VALVE
Revision 5 93
WATER INJECTION SUPPLY
SOV801B 1–10–B–37 C–1–254/255 Y 235
VALVE
MTB3/FU21-
SOV604B GT SCAVENGE ASSIST 2–4–C–21 N 250
MTB3–33
MTB3/FU21-
SOV605B GT A OIL ASSIST 2–4–C–22 N 250
MTB3–34
NOTES: A = common (-) 125-VDC bus at terminal MTB2/FU15 (P25–590) Engine A and MTB3/FU15 (P25–620) Engine B.
B = common (-) 24-VDC bus at terminal MTB2/FU11 (P28–160) Engine A and MTB3/FU15 (P28–470) Engine B.
Revision 5 94
16H GENERATOR RTD CALIBRATION NOTE: Refer to PWPS drawing XXXX-187-E101D
RESIST.
LOW / HIGH RESIST. TO
RTD INPUT POLE TO CALIBRATION
RTD DESCRIPTION TEST POINT CALIBRATION GROUND INITIALS DATE
TAG ADDRESS POLE OFFSET / GAIN
VALUE (OHMS)
(OHMS)
GENERATOR LOW 1–11–1–3–1 L = - 40° F O=
TE3001 BEARING SUPPLY 1–11–1–3–1
TEMPERATURE 4–5/6/7 H = 500° F G=
1–11–1–3–2 L = - 40° F O=
GENERATOR LOW TANK
TE3002 1–11–1–3–2
TEMPERATURE H = 500° F G=
8–9/10/11
GENERATOR LOW 1–11–1–4–2 L = - 40° F O=
TE3003 BEARING DRAIN 1–11–1–4–2
TEMPERATURE – NEE 4–5/6/7 H = 500° F G=
GENERATOR LOW 1–11–1–4–3 L = - 40° F O=
TE3004 BEARING DRAIN 1–11–1–4–3
TEMPERATURE – EE 12–13/14/15 H = 500° F G=
GENERATOR LOW AIR/OIL 1–11–1–4–4 L = - 40° F O=
TE3005 COOLER INLET 1–11–1–4–4
TEMPERTURE 16–17/18/19 H = 500° F G=
GENERATOR STATOR 1–11–1–1–1 L = - 40° F O=
TE3201 TEMPERATURE – 1–11–1–1–1
PHASE 1 - NEE 4/5/2007 H = 500° F G=
GENERATOR STATOR 1–11–1–1–2 L = - 40° F O=
TE3202 TEMPERATURE – 1–11–1–1–2
PHASE 2 - NEE 8/9/2011 H = 500° F G=
GENERATOR STATOR 1–11–1–1–3 L = - 40° F O=
TE3203 TEMPERATURE – 1–11–1–1–3
PHASE 3 - NEE 12/13/2015 H = 500° F G=
GENERATOR STATOR 1–11–1–1–4 L = - 40° F O=
TE3204 TEMPERATURE – 1–11–1–1–4
PHASE 1 - EE 16–17/19 H = 500° F G=
GENERATOR STATOR 1–11–1–1–5 L = - 40° F O=
TE3205 TEMPERATURE – 1–11–1–1–5
PHASE 2 - EE 20–21/23 H = 500° F G=
GENERATOR STATOR 1–11–1–1–6 L = - 40° F O=
TE3206 TEMPERATURE – 1–11–1–1–6
PHASE 3 - EE 24–25/27 H = 500° F G=
Revision 5 95
GENERATOR BEARING 1–11–1–3–3 L = - 40° F O=
TE3213 METAL TEMPERATURE – 1–11–1–3–3
NEE 12–13/14/15 H = 500° F G=
GENERATOR BEARING 1–11–1–3–4 L = - 40° F O=
TE3214 METAL TEMPERATURE – 1–11–1–3–4
EE 16–17/18/19 H = 500° F G=
1–11–1–3–5 L = - 40° F O=
GENERATOR COOLING
TE3301 1–11–1–3–5
AIR INLET TEMPERATURE H = 500° F G=
20–21/22/23
GENERATOR COOLING 1–11–1–3–6 L = - 40° F O=
TE3302 AIR OUTLET 1–11–1–3–6
TEMPERATURE 26–27/7/8 H = 500° F G=
1–11–1–4–1 L = - 40° F O=
EXCITER AIR DISCHARGE
TE3601 1–11–1–4–1
TEMPERATURE
4–5/6/7 H = 500° F G=
Revision 5 96
16I IGV,VSV & FUEL VALVE RESISTANCE CHECK, CALIBRATION AND DRIBER SETUP
NOTE: Refer to PWPS drawing XXXX-187-E101D – Sheets 55, 56, 57 and 58
ENGINE A INLET GUIDE VANES AND VARIABLE STATOR VANES
NOMINAL RESISTANCE RESISTANCE
WINDING
RESISTANCE TO TO
TERMINAL TEST POINTS ON TERMINAL BLOCK 2–8–A RESISTANCE INITIALS DATE
RANGE GROUND GROUND
(OHMS)
(OHMS) (OHMS) (OHMS)
INLET GUIDE VANES (IGVs)
FY001A – TORQUE MOTOR, 2–3 25 Ω 2M Ω TO ∞
EXCITATION, 5–6 10 Ω 2M Ω TO ∞
EXCITATION, 24–25 10 Ω 2M Ω TO ∞
COS 41 – 42 75 – 101 Ω 2M Ω TO ∞
ACTUATOR MOTOR
55/56 – 57/58 < 1.0 Ω 2M Ω TO ∞
Revision 5 97
SET DRIVER ADDRESS
TERMINATION RESISTORS
STROKE VALVE
EXC 35 – 36 40 – 50 Ω 2M Ω TO ∞
SINE 38 – 39 7 – 15 Ω 2M Ω TO ∞
COS 41 – 42 7 – 15 Ω 2M Ω TO ∞
ACTUATOR MOTOR
< 1.0 Ω
55/56 – 57/58 2M Ω TO ∞
< 1.0 Ω
55/56 – 59/60 2M Ω TO ∞
TERMINATION RESISTORS
STROKE VALVE
Revision 5 98
ENGINE B INLET GUIDE VANES AND VARIABLE STATOR VANES
NOMINAL RESISTANCE RESISTANCE
WINDING
RESISTANCE TO TO
TERMINAL TEST POINTS ON TERMINAL BLOCK 2–9–A RESISTANCE INITIALS DATE
RANGE GROUND GROUND
(OHMS)
(OHMS) (OHMS) (OHMS)
INLET GUIDE VANES (IGVs)
EXCITATION, 5–6 10 Ω 2M Ω TO ∞
EXCITATION, 24–25 10 Ω 2M Ω TO ∞
SIN 38 – 39 75 – 101 Ω 2M Ω TO ∞
COS 41 – 42 75 – 101 Ω 2M Ω TO ∞
ACTUATOR MOTOR
55/56 – 57/58 < 1.0 Ω 2M Ω TO ∞
Revision 5 99
TERMINATION RESISTORS
STROKE VALVE
EXC 35 – 36 40 – 50 Ω 2M Ω TO ∞
SINE 38 - 39 7 – 15 Ω 2M Ω TO ∞
COS 41 - 42 7 – 15 Ω 2M Ω TO ∞
ACTUATOR MOTOR
< 1.0 Ω
55/56 – 57/58 2M Ω TO ∞
< 1.0 Ω
55/56 – 59/60 2M Ω TO ∞
TERMINATION RESISTORS
STROKE VALVE
Revision 5 100
INLET GUIDE VANE (IGV) AND VARIABLE STATOR VANE (VSV) CALIBRATION
DESCRIPTION REMARKS – DISCREPANCIES ENCOUNTERED INITIALS DATE
ENGINE A
ENGINE B
Revision 5 101
PROCEDURE 17 – FIRE PROTECTION SYSTEM NOTE: Refer to PWPS drawing XXXX-185-E501D
NOTE: See Fire Protection System Vendor Report for complete Commissioning details and a list of all installed devices.
Revision 5 102
QAHH2001B GAS MONITOR B DENSITY HIGH-HIGH 1–11–4–3–13
Revision 5 103
ENGINE A – FIRE PROTECTION SYSTEM
EMPTY BOTTLE WEIGHT CO2 BOTTLE SERIAL NUMBER LOCATION – UNIT # WEIGHT INITIALS DATE
Revision 5 104
ENGINE B – FIRE PROTECTION SYSTEM
EMPTY BOTTLE WEIGHT CO2 BOTTLE SERIAL NUMBER LOCATION – UNIT # WEIGHT INITIALS DATE
Revision 5 105
GENERATOR – FIRE PROTECTION SYSTEM
EMPTY BOTTLE WEIGHT CO2 BOTTLE SERIAL NUMBER LOCATION – UNIT # WEIGHT INITIALS DATE
Revision 5 106
PROCEDURE 18 – HYDRAULIC START-PAC NOTE: Refer to PWPS drawing XXXX-187-E101D
Revision 5 107
PROCEDURE 18.3 – HYDRAULIC STARTER SPEED
PARAMETER ENGINE A ENGINE B REMARKS INITIALS DATE
NL
PT101
PT102
PT501
PT502
PT612
PT616
PT620
PT621
PT1002
PT1003
Revision 5 108
PROCEDURE 19 – CHIP DETECTORS NOTE: Refer to PWPS drawing XXXX-187-E101D
TAG NUMBER ENGINE ENGINE LOCATION INPUT ADDRESS FUNCTIONAL TEST PROBE CLEARED INITIALS DATE
Revision 5 109
PROCEDURE 20 – AIRPAX TACHPAK 3 – OVERSPEED NOTE: Refer to PWPS drawing XXXX-187-E101D – Unit Control Schematic
DESCRIPTOR CONSTANT
DESCRIPTION INITIALS DATE
(See NOTE 1) (See NOTE 2)
FS *500003
A0 00000
AF 0000000
*300003 OR
CF 3000 or 3600 RPM
*360003
S1 *100002
H1 *EAh010
S2 (60-Hz) *396003
3300, 3450 OR 3960 RPM DROPOUT
*330003 OR
S2 (50-Hz)
*345003
H2 *dAh010
S3 (60-Hz) *396003
3300, 3450 OR 3960 RPM DROPOUT
*330003 OR
S3 (50-Hz)
*345003
H3 *dAh010
S4 000000
H4 *eAh10.0
SP *0*P*01
NOTE 1: An asterisk (*) is used to denote a blank, therefore NO value should be entered into this slot.
NOTE 2: Descriptors A0, AF, S4 and H4 are NOT used, therefore all input values are zero (0).
Revision 5 110
DESCRIPTION A B INITIALS DATE
ST008 RESISTANCE
ST008 GROUND
TUNABLES CHECKED
Revision 5 111
PROCEDURE 21 – FLOW METERS
21.1 LIQUID FUEL FLOW METERS
WIRING CHECKS
DEVICE TEST POINT @ Liq Fuel Flow RESIST RESIST – INITIAL DATE
Computer P-P GRND
TEC410A – TEMPERATURE Input 4-20 Temp – 24VDC IN to +
CONDITIONER
FTC410A – FLOW Input Pulse Flow – COM to +
CONDITIONER
TEC410B – TEMPERATURE Input 4-20 Temp – 24VDC IN to +
CONDITIONER
FTC410B – FLOW Input Pulse Flow – COM to +
CONDITIONER
Engine A Data Engine B Data
“A” Serial Number “B” Serial Number
POINT K FACTOR FREQ/VISC K FACTOR FREQ/VISC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Revision 5 112
16
17
18
19
20
ITEM SETTING A B INITIAL DATE
TABLE DATA ENTERED
KDP 0000.00
RATE MULTIPLIER 6000.00
DEFAULT VISCOSITY 4.0 cSt @104° F
V max 15.
T max 20° F
V min 4.0
T min 104° F
TEMP @ 4ma 0° F
TEMP @ 20MA 200° F
FLOW @ 4ma 0 GPM
FLOW @ 20ma 40 GPM
RATE SMOOTHING 0.5
RATE CTRL INPUTS NONE
RESET NONE
DEC Pt. 0000.00
RATE HEADER GPM
TEMP HEADER F
Revision 5 110
FT1101A – VORTEX Vortex Pulse Input + Supply
XDUCER to - Supply
Vortex Pulse Input + Supply
to SIG
Vortex Pulse Input - Supply
to SIG
TE1102B – RTD1 RTD Analog IN TMP to -S
RTD Analog IN TMP to +S
RTD Analog IN -S to+S
PT1102B – PPRESSURE Pressure Analog IN +Supply
TRANSDUCER to 4-20ma
FT1101B – VORTEX Vortex Pulse Input + Supply
XDUCER to - Supply
Vortex Pulse Input + Supply
to SIG
Vortex Pulse Input - Supply
to SIG
“A” FLOW METER SERIAL NUMBER
“A” RTD SERIAL NUMBER
“B” FLOW METER SERIAL NUMBER
“B” RTD SERIAL NUMBER
COLUMN DATA VALUE SETTING A B INITIAL DATE
1 – APPLICATION FLUID NATURAL GAS
2 – FLOW INPUT FLOW FREQUENCY
FLOWMETER LINEAR
BIDIRECTIONAL OFF
PIPE DIAMETER 2”
K-FACTOR (From flow meter)
3 – ANALOG INPUT TEMP INPUT RTD
SUB TEMP #1 60° F
RTD #1 cal A (From cal sheet)
RTD #1 cal B (From cal sheet)
RTD #1 cal R 0 (From cal sheet)
PRESSURE INPUT 4-20ma
SUB PRESSURE 400 PSIG
Revision 5 111
ZERO SCALE 0 PSIG
FULL SCALE 750 PSIG
ATM PRESSURE 14.73
4- FLUID REF DENSITY 0.044923 LB/Ft3 (Based
PARAMETERS on SG = 0.587)
SPECIFIC GRAVITY 0.5870
MOLE FRAC CO2 0.7920
MOLE FRAC N2 1.1227
SUPERCOMP 1.00849 @ (450 PSIG,
236° F assumed)
5 – TOTALIZER TOTALIZER #1 MASS FLOW
SCALE FACTOR 1 LB/Hr
TOTALIZER #2 NONE
6 – ANALOG OUTPUT ANALOG OUTPUT MASS FLOW
ZERO SCALE 0 PPH
FULL SCALE 16,719 PPH
7 – RELAY OUTPUT RELAY OUTPUT NONE
8 – DISPLAYED BAR GRAPH OFF
VALUES
DENSITY ON
TEMPERATURE ON
TEMP STATS ON
PRESSURE ON
PRESSURE STATS ON
LINE VELOCITY ON
VOLUME FLOW ON
VOL FLOW STATS ON
COMP VOL FLOW ON
COMP VOL STATS ON
MASS FLOW ON
MASS FLOW STATS ON
ANALOG OUTPUT ON
RELAY OUTPUT OFF
TOTAL #1 ON
TOTAL #2 OFF
Revision 5 112
CLOCK/CALENDAR ON
VERIFICATION OFF
9 – DISPLAY UNITS VELOCITY FT/SEC
VOLUME CUBIC FEET
MASS POUNDS
FLOW TIME BASE /SECOND
TEMP °F
PRESSURE PSI
PRESSURE DISPLAY GAUGE
DENSITY LB/FT3
10 – SYSTEM UNIT NUMBER
BAUD RATE NOT USED
DATA FORMAT NOT USED
STOP BITS NOT USED
COMM HAND NOT USED
SHAKE
MODEM COM OFF
PASSWORD 37540 (default)
DISPLAY SCAN SEC
SYNC CALC ON
TEMPERATURE TC 2.0 SEC (default)
PRESSURE TC 2.0 SEC (default)
FLOW TC 0.0 SEC (default)
A/D REFERENCE FACTORY SET
A/D INT COUNT
D/A ZERO COUNT 700 (default)
D/A SPAN COUNT 2800 (default)
Revision 5 113
21.3 WATER INJECTION FLOW METERS
DEVICE CIRCUIT TEST POINT RESIST P-P RESIST – GND INITIAL DATE
FM801A – Water Injection Flow Meter A PWR MTB2 FU5-FU9
OUTPUT 1-5-A / 84-41
ZERO METER
FM801B – Water Injection Flow Meter B PWR MTB3 FU5-FU9
OUTPUT 1-6-B / 31-68
ZERO METER
Revision 5 114
PROCEDURE 22 ALIGNMENT VERIFICATION OF POWER TURBINE AND GENERATOR
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
RUNOUT AT °F
INTIALS DATE
6:00 6:00
Revision 5 115
PERIPHERAL RUNOUT
12:00 12:00
RUNOUT AT °F
INTIALS DATE
6:00 6:00
RUNOUT AT °F
INTIALS DATE
6:00 6:00
Revision 5 116
AXIAL MEASUREMENT
12:00 12:00
RUNOUT AT °F
INTIALS DATE
6:00 6:00
RUNOUT AT °F
INTIALS DATE
6:00 6:00
Revision 5 117
PROCEDURE 22 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 118
PROCEDURE 23 – LUBE OIL SYSTEM FUNCTIONAL CHECKS
DESCRIPTION ENGINE A ENGINE B GENERATOR REMARKS INITIALS DATE
SWITCH AC PUMPS
Revision 5 119
#1 AC OVERLOAD RELAY INDICATOR PULLED -
DC PUMP START
Revision 5 120
PROCEDURE 24 – COLD AIR BUFFER SYSTEM INSTALLATION Refer to PWPS drawings XXXX-187-E101D Sheets 9,10,26,30,43,47,50; XXX-181-M502D
PIPING INSTALLATION
ORIFICE INSTALLATION
MOTOR ROTATION CHECK – REFER TO
PROCEDURE 9
RTD CALIBRATION – REFER TO PROCEDURE 16D
NOTE: Check Allen-Bradley variable frequency drive (VFD) set-up before proceeding.
FREQUENCY SELECT 1 4 – 20 mA
Revision 5 121
MAXIMUM FREQUENCY 60-Hz (50-Hz)
FREQUENCY SELECT 1 4 – 20 mA
Revision 5 122
OVERLOAD CURRENT 7.83 Amps
Revision 5 123
PROCEDURE 25 – THRUST BALANCE NOTE: Refer to PWPS drawing XXXX-187-E101D Sheets 18,19,32
RESISTANCE TO GRD
DESCRIPTION INPUT ADDRESS TEST POINT RESIST P-P CALIBRATION INITIALS DATE
(OHMS)
V1701O_A – THRUST BALANCE MOV 61
1–10–A–21
OPEN COMMAND 62
Revision 5 124
PROCEDURE 25 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 125
PROCEDURE 26 – EVAPORATIVE COOLER
INPUT
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
ADDRESS
Revision 5 126
PROCEDURE 27 – FUEL FORWARDING AND CONDITIONING, LIQUID AND GAS Refer to PWPS drawings XXXX-181-M201D, XXXX-M202D,
XXXX-187-E101D
27.1 – LIQUID FUEL FORWARDING SKID
INSPECTION /
INPUT
DESCRIPTION I/O FUNCTION REMARKS INITIALS DATE
ADDRESS
CHECK
INSTALLATION INSPECTION NA NA
CAL - 35
PSL421 – FUEL PUMP #1 LOW PRESSURE LOCAL
PSI F
CAL - 35
PSL422 – FUEL PUMP #2 LOW PRESSURE LOCAL
PSI F
1) 1) 1) 3)
M421 – LIQUID FUEL OIL
A= B= C=
PUMP #1
2) 2) 2) 4)
1) 1) 1) 3)
M422 – LIQUID FUEL OIL
A= B= C=
PUMP #1
2) 2) 2) 4)
Revision 5 127
INSPECTION /
INPUT
DESCRIPTION I/O FUNCTION REMARKS INITIALS DATE
ADDRESS
CHECK
INSTALLATION INSPECTION NA NA
INSPECTION /
INPUT
DESCRIPTION I/O FUNCTION REMARKS INITIALS DATE
ADDRESS
CHECK
INSTALLATION INSPECTION NA NA
FUEL FLUSH NA NA
INSPECTION /
INPUT
DESCRIPTION I/O FUNCTION REMARKS INITIALS DATE
ADDRESS
CHECK
Revision 5 128
INSTALLATION INSPECTION NA NA
Revision 5 129
PROCEDURE 28 – INCOMPLETE SEQUENCE STARTS
ENGINE A
ENGINE B
Revision 5 130
PROCEDURE 29 – INITIAL LIGHT-OFF AND POWER TURBINE BREAK-IN
ENGINE A
ENGINE B
Revision 5 131
PROCEDURE 30 – OVERSPEED TEST
DESCRIPTION TRIP SPEED REMARKS INITIALS DATE
Revision 5 132
PROCEDURE 31 – HIGH VOLTAGE SWITCHGEAR
DESCRIPTION INSPECT/SET REMARKS INITIALS DATE
INSTALLATION INSPECTION
REMOVE PT FUSE DRAWER SHIPPING
RESTRAINTS
REMOVE MAIN BREAKER SHIPPING
RESTRAINTS
TORQUE BUS BOLTS
VERIFY ALL WIRING ON S1, S2 & S3 TERMINALS
IS TIGHT
VERIFY PROPER CT JUMPERS & SHORTING
BLOCKS INSTALLED PER 3 LINE DIAGRAM
AUX TRANSFORMERDISCONNECT SWITCH
OPERATION
BREAKER DISCONNECT SWITCH OPERATION
Revision 5 133
CURRENT SW 1
CURRENT SW 2
FAN ALARM
Revision 5 134
PROCEDURE 32 – PROTECTIVE RELAY CALIBRATION AND TESTING
OPERATED UNIT CONTROL FUNCTIONAL
DEVICE TAG FUNCTION CALIBRATION INITIALS DATE
DEVICE ADDRESS TEST
Out 6 1/7A/41
76E EXCITER FIELD OVERCURRENT
86G2 86G2
Revision 5 135
78 86E OUT OF STEP N/A
Revision 5 136
CHECK VOLTAGE BALANCE RELAY
Revision 5 137
PROCEDURE 33 – SHORT CIRCUIT TEST
DESCRIPTION REMARKS INITIALS DATE
Revision 5 138
PROCEDURE 34 – PHASING AND SYNCHRONIZING CHECKS NOTE: Refer to Brush Generator vendor report for additional data.
GENERATOR PT A B C
B
BUS PT
C
GENERATOR PTs
BUS PTs
CHECK PHASING ACROSS THE 52G BREAKER WITH HOT STICK VOLTMETER
MANUAL SYNCHRONIZATION
AUTOMATIC SYNCHRONIZATION
Revision 5 139
INPUT FUNCTIONAL
DESCRIPTION REMARKS INITIALS DATE
ADDRESS TEST
XS4501 – TROUBLE ALARM 1–7–A–31
Revision 5 140
MVR_R – RAISE MANUAL EXCITATION VOLTAGE 1–7–C–6
Revision 5 141
Pratt and Whitney Power Systems, Inc.
Commissioning Manual Sign-Off Sheets - Revision 4
TEMPORARY REVISION NO. 07-01
Please insert this Temporary Revision 07-01 in the Commissioning Manual Sign-Off Sheets Rev 4, before page 129.
This Sign-Off Sheet has been modified the to include the On-Line Protective Relay Test.
PROCEDURE 35 – BREAKER CLOSURE, ON-LINE AVR AND PROTECTIVE RELAY TESTS NOTE: Refer to Brush
Generator vendor report for additional data.
CAUTION: ENSURE THE GENERATOR BREAKER OPEN RACK GENERATOR BREAKER IS IN PLACE AND LOCKED
BEFORE COMMENCING TEST.
DESCRIPTION SETTING / VALUE REMARKS INITIALS DATE
VOLTS /
PMG SUPPLY
Hz
VOLTAGE MONITOR
EXCITATION MONITOR
OVER-EXCITATION MONITOR X4
INCLUDE TPM375
CAUTION: ENSURE THE GENERATOR BREAKER OPEN RACK GENERATOR BREAKER IS IN PLACE AND LOCKED BEFORE COMMENCING TEST.
Revision 5 142
CHECK QCC SETTING
VOLTAGE MONITOR
EXCITATION MONITOR
OVER-EXCITATION MONITOR X4
UNDER-EXCITATION LIMITER ON X1
GENERAL REQUIREMENT
Revision 5 143
PROCEDURE 35 – NOTES, COMMENTS OR DISCREPANCIES
Revision 5 144
PROCEDURE 36 – WATER INJECTION
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
PIPING FLUSHED
Revision 5 146
PROCEDURE 37 – FULL LOAD DATA RUN
TAG
FUNCTION UNITS A BASE B BASE INITIALS DATE
NUMBER
PDI 421 LIQUID FUEL FILTER F421 DIFFERENTIAL PRESSURE PSID
PDI 607 LUBE OIL SKID - # 8 AND # 9 BEARING SCAVENGE PRESSURE INCHES Hg
PDI 630 LUBE OIL MIST ELIMINATOR OME602 DIFFERENTIAL PRESSURE INCHES H2O
PDI 4005 INLET AIR FILTER FINAL FILTER DIFFERENTIAL PRESSURE INCHES H2O
PDI 4006 INLET AIR FILTER TOTAL DIFFERENTIAL PRESSURE INCHES H2O
Revision 5 147
TI 606 OIL SKID – OIL COOLER OUTPUT TEMPERATURE °F
INITIATE AN ANALOG DATA REPORT AT PARTIAL AND BASE LOADS. INCLUDE COPIES.
Revision 5 148
PROCEDURE 38 – DROP LOAD TEST
DESCRIPTION REMARKS INITIALS DATE
Revision 5 149
PROCEDURE 39 – WATER WASH SYSTEM
DESCRIPTION ENGINE A ENGINE B REMARKS INITIALS DATE
PIPING FLUSHED
Revision 5 150
PROCEDURE 40 – PERFORMANCE TESTING NOTE: See Performance Report for complete details.
Revision 5 151