2 Incomer Supply Voltage 415 V, AC, 3 Phase, 50 Hz 3 Mounting On skid/Wall 4 Cable Entry Bottom, vendor to provide holes with gland for cables 5 Protection Class Weatherproof, to be mounted outdoores under roof 6 Material of construction CRCA sheet fabricated or readymade panel 7 Dimensions Vendor to provide dimensions and GA drawing for approval prior toamnufacturing 8 Incomer Voltmeter/Ammeter Required at Incomer 9 Incomer Isolation Switch Required 10 Phase indication Lamps at Incomer Required 11 Warning Lables Safety Warning lablesto be put on MCC Feeder List
Start/Stop/Reset Push Feeder No. Description Tag No. Qty, Nos. kW Rating Phase, Voltage Buttons
1 Lift Station Pump P-101 1 0.75 3 Phase, 415 V Required
2 Sewage Transfer Pump - 1 P-102 A 1 0.75 3 Phase, 415 V Required
3 Sewage Transfer Pump - 2 P-102 B 1 0.75 3 Phase, 415 V Required
4 Air Blower - 1 B-101 A 1 3.7 3 Phase, 415 V Required 5 Air Blower - 2 B-101 B 1 3.7 3 Phase, 415 V Required
6 Sludge Transfer Pump P-104 1 2.2 3 Phase, 415 V Required
7 Filter Feed Pump - 1 P-103 A 1 1.5 3 Phase, 415 V Required
8 Filter Feed Pump -2 P-103 B 1 1.5 3 Phase, 415 V Required
Single Phase, 230 V,
9 NaOCL Dosing Pump DP-01 1 0.03 AC Required Local/Remote operation with Auto Start/Stop by level switch Indication Lamps : LPBS contacts On/Off/Trip Remarks Start on "HIGH" Level switch input when in "Auto" mode, stop on "LOW" level switch input. Required. Required
Start on "HIGH" Level switch Lead/Lag Selector
input when in "Auto" mode, Switch to be provided. stop on "LOW" level switch In position 1, Sewage Not Required input. Required Transfer Pump-1 will start on "High Level and in posiotion 2, Sewage Transfer Pump-2 will start on "High" Level. Start on "HIGH HIGH" Level switch input when in "Auto" mode, stop on "HIGH" level Not Required switch input. Required Not Required Not required Required Not Required Not required Required