ESPECIFICACIONES ML y M2 PRECIO X ML Y M2 TOTAL


BASE 75 ml s/. 30.00 s/. 2250.00
SOBREBASE 75 ml s/. 50.00 s/. 3750.00
21 COLUMNAS s/. 200.00 s/. 4200.00
PARED DE LADRILLO 230 m2 s/. 15.00 s/. 3450.00
TARRAJEO DE PAREDES 535 m2 s/. 15.00
MUROS Y DERRAMES 100% s/. 8025.00
VIGA COLLARIN 73 ml s/. 30.00 s/. 2190.00
TECHO Y CIELORAZO 164 m2 s/. 40.00 s/. 6560.00
RAMPA Y 2 ESCALERAS s/. 700.00

RELLENADO, COMPACTADO Y 103 m2 s/. 15.00 s/. 1545.00


FALSO PISO

ARMADO DE ESTRUCTURA S/. 500.00


DE COCINA
INSTALACIONES DE SERVICIOS BASICOS
DESAGUE s/. 700.00
LUZ s/. 1100.00

INSTALACION DE AGUA, S/. 3700.00


TANQUE ELEVADO, TANQUE
CISTERNA, TANQUE FLUVIAL
TOTAL S/. 38 670.00

BCP
PERCY ROJAS SANGAMA
CTA AHORROS:
55090020822057
MADERA HUAYRURO
CANT. DESCRIPCION P. UNIT. TOTAL
20 3 X 7 X 30 S/. 315,00 S/.6300,00
2 8 X 8 X 10 S/. 239,00 S/. 478,00
32 2 X 2 X 15 S/. 24,00 S/. 768,00
14 3 X 7 X 16 S/. 148,00 S/. 2072,00
10 2 X 2 X 16 S/. 28,00 S/. 280,00
TOTAL S/. 9 898,00
CANT. DESCRIPCION P. UNIT. TOTAL
50 barra de const. 1 /2 23.80 1,190.00
96 barra de const. 3 /8 14.00 1,344.00
105 barra de const. 1 /4 6.30 661.50
50 KG alambre # 8 4.50 225.00
35 KG alambre # 16 4.50 157.50
20 KG clavo 2" 1/2 4.40 88.00
20 KG clavo 3" 4.40 88.00
20 KG clavo 4" 4.40 88.00
350 cemento pacasmayo 24.20 8,470.00
17 tubo desague de 4" 19.50 331.50
6 tee de 4 x 4 5.00 30.00
6 yee de 4 x 2 5.00 30.00
3 codo 4" x 90° 4.50 13.50
4 tee de 4 x 2 5.00 20.00
22 codos de 2" x 90° 1.50 33.00
8 tubo de desague 2" 9.50 76.00
2 pegamento oatey 1/4 GLN 33.00 66.00
TOTAL S/. 12,912.00

CANT. DESCRIPCION P. UNIT. TOTAL


15 tubo de agua 3 /4 11.00 165.00
6 reduccion agua 3/4 - 1/2 1.00 6.00
12 codos 3/4 1.50 18.00
12 codos 1/2 1.00 12.00
12 tee de 1/2 1.50 18.00
1 valvula esferica 3/4 C/R y union PVC 16.00 16.00
10 teflon 1.00 10.00
4 valvula esferica 1/2 C/R y union PVC PCP 16.00 64.00
20 adaptador de 1/2 1.00 20.00
3 llave ducha 1/2 PeX 46.00 138.00
12 codo galvanizado 1/2 1.50 18.00
50 tubo de luz 3/4 3.50 175.00
60 curvas luz 3/4 0.60 36.00
16 cajas octagonales 1.00 16.00
25 cajas rectangulares 1.00 25.00
TOTAL S/. 737.00

CANT. DESCRIPCION P. UNIT. TOTAL


3 rollos cable 7 hilos # 14 110.00 330.00
3 rollos cable 7 hilos # 12 150.00 450.00
3 cinta aislante grande 3.00 9.00
TOTAL S/. 789.00

12,912.00
MATERIALES 737.00
789.00
TOTAL 14,438.00
COSTOS DE MATERIALES
ESPECIFICACIONES CANT. P. UNIT. TOTAL
LADRILLO 4 millares 4,000.00
HORMIGON 60 cubos 50 3,000.00
ARENA 16 cubos 50 800.00
PIEDRA 6 cubos 50 300.00
RELLENO 60 m3 30 1,800.00
TOTAL S/. 9,900.00

NOTA: El presupuesto no esta considerado varios imprevistos, como


traslado de todo el material hacia el otro lado del río donde se ejecutara
la obra
RESUMEN
MANO DE OBRA S/. 38 670.00
MADERA HUAYRURO S/. 9 898,00
MATERIALES S/. 14 438,00
COSTO DE MATERIALES S/. 9 900,00
PRESUPUESTO TOTAL S/. 72 906.00