SUBJECT: METHOD STATEMENT FOR
REINFORCEMENT
METHOD STATEMENT
FOR
REINFORCEMENT
WORKS
Prepared by: Ashwini Kumar Checked by: Mr. A.K.Tripathi
PROJECT NAME: LOGIX BLOSSOM COUNTY, SEC137, DATE: 01.12.10
NOIDA
PAGE: 2 OF 5
SUBJECT: METHOD STATEMENT FOR
REINFORCEMENT
INDEX OF CONTENTS
1. OBJECTIVE
2. SCOPE
3. RESOURCES USED
4. WORK METHODOLOGY
5. SAFETY MEASURES
Prepared by: Ashwini Kumar Checked by: Mr. A.K.Tripathi
PROJECT NAME: LOGIX BLOSSOM COUNTY, SEC137, DATE: 01.12.10
NOIDA
PAGE: 3 OF 5
SUBJECT: METHOD STATEMENT FOR
REINFORCEMENT
WORK METHODOLOGY FOR REINFORCEMENT WORKS
Objective – The objective of this method statement is to describe in detail all the
operation concerned with the Logix Blossom County Project.
Resources used
1. Materials: Reinforcement bars of various diameter, GI Binding wires,
Cement Cover Blocks
3. Manpower : Engineer, Supervisors/Foremen, Fitters Gang.
WORK METHODOLOGY
1. Initially, Reinforcement of the specified type and grade will be
mobilized to site.
2. All reinforcements will be stored off the ground by providing concrete
sleepers battens underneath to prevent distortion and corrosion.
3. Unit weight of reinforcement bars of each dia will be checked at site to
compare with standard weight and whether if variation is within
permissible limit.
4. The samples of reinforcement steel taken in presence of client is sent to
approved external laboratory for various tests.
Prepared by: Ashwini Kumar Checked by: Mr. A.K.Tripathi
PROJECT NAME: LOGIX BLOSSOM COUNTY, SEC137, DATE: 01.12.10
NOIDA
PAGE: 4 OF 5
SUBJECT: METHOD STATEMENT FOR
REINFORCEMENT
5. Drawings are studied and Bar Bending Schedule is prepared and got
approved by the Customer’s Representative before any cutting of bars is
taken up.
6. After obtaining approval of BBS by client, bars are cut and bent
according to it manually or by using bending and cutting machines. The
first piece of each shape of bar will be checked by concerned engineer
and after its verification and conformance to BBS, fitter will be allowed
for mass production.
7. These are shifted to the workspot and will be stacked nearby the
placing location over wooden battens/ concrete blocks. Shaped bars
will be placed in position on specified cover blocks and tied with
binding wires in Raft and Slab. In columns they are aligned vertically in
position with the help of stirrups at regular intervals and cover blocks
are tied as specified.
8. Laps, Spacers, Chairs and other secondary reinforcements will be
provided as shown in the drawing and as per requirements.
9. After placing of steel in raft / slab and beams, client’s representative
will be requested to conduct checking of the same before casting. While
in case of columns and walls, this checking will be offered before
placing the shuttering.
SAFETY MEASURES:
1. Provisions for workmen:
All persons working at the site shall be provided with the safety
equipments, protection means such as hand gloves, safety helmets and
other necessary kinds.
Prepared by: Ashwini Kumar Checked by: Mr. A.K.Tripathi
PROJECT NAME: LOGIX BLOSSOM COUNTY, SEC137, DATE: 01.12.10
NOIDA
PAGE: 5 OF 5
SUBJECT: METHOD STATEMENT FOR
REINFORCEMENT
2. Provisions for Equipment, Machine:
All equipment will be ensured to operate safely, maintained and
repaired periodically.
All power equipment should be insulated and covered to all exposed
live parts.
A competent person shall inspect equipment during shift duty.
3. Provisions for Job Site:
Relevant Caution boards and sufficient lighting system shall be installed
at the working area to ensure safety for construction activities at night
time.
The working area shall be free from hazards before starting the work.
Unnecessary materials such as empty bags and rubbish shall be
removed periodically.
Prepared by: Ashwini Kumar Checked by: Mr. A.K.Tripathi