Page 1 of 5
No.BOQ Calculation Unit Sket Drawing
SECTION
Page 2 of 5
No.BOQ Calculation Unit Sket Drawing
4.1/30 Sod Facing
- Left Side
A = p x l x n
= 168.800 x 0.500 x 2.000
= 168.800
- Right Side
A = p x l x n
= 155.250 x 0.500 x 2.000
= 155.250
A total = 324.050 m2
V total = 220.969 m3
V total = 110.485 m3
- Right Side
= 339.742
- Bridge
= p x b
= 126.200 x 4.200
Page 3 of 5
No.BOQ Calculation Unit Sket Drawing
= 530.040
V total = 1,266.604 m2
Summary
4.1/30 Sod Facing 324.050 m2
4.1/31 Subbase Course, t = 300 mm (Compacted) 220.969 m3
4.1/32 Base Course, t = 150 mm (Compacted) 110.485 m3
4.1/33 Surface Course, t = 50 mm (Compacted) 1,266.604 m2
( ) ( ) ( )
Page 4 of 5
Summary Pavement