Anda di halaman 1dari 1

Start

Material
Received at
Incoming

Design
Drawings Quality Inspection

Inspection Status ?

Accepted

Handed Over to Testing

Test
Procedures

Testing

Testing Status ?

Rejected

NCR Raised

Accepted

Minor Defected/In-
house Repairable

Re-work by Repair
section

Re-offered to
Quality/Testing

Accepted Testing Status ? Rejected

Handed over to
Rejected
Store for release to
Test Results Production
Recorded Returned to
Quarantine Supplier

END

Anda mungkin juga menyukai