Volume
Jumlah Harga Satuan Jumlah Biaya
No. Uraian
(Orang/Unit) Billing (Rp) (Rp)
Satuan
Rate
I BIAYA LANGSUNG PERSONIL
3 Sewa Alat Ukur (Theodolit & GPS) 1.00 2 Unit/Bln 1,500,000.00 3,000,000.00
BIAYA OPERASIONAL &
B
TRANSPORTASI
1 Biaya Oprerasi Tugas Luar (OSA)
- Team Leader / Ahli Teknik Jalan 1.00 5.0 Org/Hari 150,000.00 750,000.00
REKAPITULASI BIAYA
TOTAL HARGA
NO. URAIAN
(Rp.)
b. Laporan 2,554,000.00
Total 49,999,400.00
Dibulatkan 50,000,000.00
Dibuat Oleh
KEPALA BIDANG BINA KONSTRUKSI
KAB.MOROWALI UTARA
ISKANDAR, ST
19710423 200701 0 016