References
Pokhara University
• Bhattarai, D. An Introduction to Construction Management
M.Sc. in Construction Management Practice in Nepal: Nepal Engineering College.
Third Semester • Emad Elbeltagi, Lecture notes on Construction Management,
Mansoura University, Egypt
• Fryer, B. The Practice of Construction Management. London:
Collins
• Gould F.E., & Joyce, N.E. Construction Project Management. New
ECM 621: Construction Project Engineering York: Prentice Hall.
and Administration • ILO, Introduction to Work Study, Geneva: ILO Publication.
• Joyce, N.E. & Gould, F.E. Construction Project Management. New
Jersey: Prentice Hall
Nec
cps

Construction Project Engineering Construction Project Engineering


• Construction - material or immaterial objects, systems or • The term “Project” has a wider meaning.
organizations, • A project is accomplished by performing a set of
• comes from Latin constructionem (fromcom- "together" activities of the non-routine nature.
and struere "to pile up“) • Each project is unique in the sense that the activities of
• Construction is used as a verb: the act of building, and a noun: a project are unique and non-routine.
how a building was built, the nature of its structure.
• According to the Encylocpaedia of Management,
• Construction is often used as a synonym with building in its verb project is ‘an organized unit dedicated to the attainment
tense.
of goal—the successful completion of a development
• Construction : project on time, within budget, in conformance with
– constructing, altering, erecting, repairing, and demolishing pre-determined programme specifications’.
building, civil engineering, works, and other similar structure.
It also contains assembly and installation on site of • According to Little & Mirrless, a project is any scheme
prefabricated component and building engineering services. or part of a scheme for investing resources which can be
– E.g. Building a house, repairing a road, demolishing dams, reasonably analysed and evaluated as an independent
erecting bridge, etc unit.

Construction Project Engineering


Construction Project Engineering
• Engineering combines the fields of science and maths to solve • In the 18th century, the term civil engineering was coined
real world problems that improve the world around us. What to incorporate all things civilian as opposed to military
really distinguishes an engineer is his ability to implement engineering.
ideas in a cost effective and practical approach. This ability to • The first self-proclaimed civil engineer was John
take a thought, or abstract idea, and translate it into reality is Smeaton, who constructed the Eddystone Lighthouse.
what separates an engineer from other fields of science and • In 1771 Smeaton and some of his colleagues formed the
mathematics. Smeatonian Society of Civil Engineers, a group of leaders
• The American Engineers' Council for Professional of the profession who met informally over dinner.
Development (ECPD,) has defined "engineering" as: • In 1818 the Institution of Civil Engineers was founded in
• ENGINEERING is the profession in which a knowledge of the London,
mathematical and natural sciences gained by study, • In 1820 the eminent engineer Thomas Telford became its
experience, and practice is applied with judgment to develop first president.
ways to utilize economically the materials and forces of • The institution received a Royal Charter in 1828, formally
nature for the benefit of mankind. recognising civil engineering as a profession.

1
7/5/2017

Construction Project
Construction Project
Engineering and Management
• Construction engineering is a professional discipline that deals with
Engineering and Administration
the designing, planning, construction, and • Construction management or construction
management of infrastructures such
as highways, bridges, airports, railroads, buildings, dams, and utilities. project management (CPM) is the overall
These Engineers are unique such that they are a cross between civil planning, coordination, and control of a project
engineers and construction managers. from beginning to completion. CPM is aimed at
• Construction engineers learn the designing aspect much like civil meeting a client's requirement in order to
engineers and construction site management functions much like
construction managers. produce a functionally and financially viable
• The primary difference between a construction engineer and a project.
construction manager is that the construction engineer has the ability
to sit for the Professional Engineer license (PE) whereas a construction • Engineering Management is a term that is used
manager cannot. to describe a specialized form of management
• Civil engineering students concentrate more on the design work, that is required to successfully lead engineering
gearing them toward a career as a design professional. This essentially personnel and projects.
requires them to take a multitude of design courses. Construction
engineering students take design courses as well as construction
management courses.

Chapter:- 1 Civil Engineering: Development


Introduction to
Construction Project Engineering • Engineering- aspect of life since the beginnings of
human existence.
• The earliest practice of civil engineering may have
commenced between 4000 and 2000 BC
• Fields of Civil Engineering Contract Works in Ancient Egypt and Mesopotamia (Ancient Iraq)
• Functions of Construction Management when humans started to abandon
a nomadic existence, creating a need for the
• Successful construction Entrepreneur construction of shelter.
• During this time, transportation became
increasingly important leading to the
development of the wheel and sailing.

Various Fields of Civil Engineering Contract


Civil Engineering: Development
Works
• In the 18th century, the term civil engineering was
coined to incorporate all things civilian as opposed to • Project planning
military engineering.
• The first self-proclaimed civil engineer was John • Project scheduling
Smeaton, who constructed the Eddystone Lighthouse.
• In 1771 Smeaton and some of his colleagues formed the
• Project implementation, controlling and
Smeatonian Society of Civil Engineers, a group of leaders monitoring
of the profession who met informally over dinner.
• In 1818 the Institution of Civil Engineers was founded in
London,
• In 1820 the eminent engineer Thomas Telford became its
first president.
• The institution received a Royal Charter in 1828, formally
recognising civil engineering as a profession.

2
7/5/2017

Scope of civil engineering Contract Works Scope of civil engineering Contract Works
• Civil engineering is a professional engineering discipline
• Contract Documentation for Civil Engineering contract
that deals with the construction and design of public and works:-
private sector works such as bridges, roads, dams and 1. Conditions of contract –a written agreement intended to be
buildings. enforceable by law to bind the appointed contractor with
the employer based on an agreed conditions.
2. Contract Drawings – technical / detailed construction
• General civil engineers work closely with surveyors and drawings for measurement / costing by QS / engineers –
specialized civil engineers to fit and serve fixed projects prepared by architect / engineers.
within their given site, community and terrain by designing 3. Specification / Preambles - A concise description of materials
grading, drainage, pavement, water supply, sewer service, and workmanship, standard or quality of workmanship. It
electric and communications supply and land (real must convey the architect and engineer’s requirements.
property) divisions. 4. Bill of Quantities – prepared by Quantity Surveyor based on
measurement from the construction drawings / building
• Construction engineers engage in the design of structures plans This document were itemized all the quantities for
temporary, cost estimating, planning and scheduling, each categories of works applied in constructing the
materials procurement, selection of equipment, and cost buildings. E.g. building works, mechanical, electrical works,
civil, structural works, infrastructure works, etc. The
control. contractor will priced /estimate all the works associated in
completing the buildings during pre-construction stage.

civil engineering construction project: Stages civil engineering construction project: Stages
• Design
• The design stage contains a lot of steps: programming and feasibility, 1. Procurement Stage
schematic design, design development, and contract documents. It is the
responsibility of the design team to ensure that the design meets all building • The procurement stage is when labor, materials and
codes and regulations. It is during the design stage that the bidding process equipment needed to complete the project are purchased.
takes place.
• Programming and feasibility: The needs, goals, and objectives must be • This can be done by the general contractor if the company
determined for the building. Decisions must be made on the building size, does all their own construction work.
number of rooms, how the space will be used, and who will be using the
space. This must all be considered to begin the actual designing of the • If the contractor does not do their own work, they obtain it
building. through subcontractors.
• Schematic design: Schematic designs are sketches used to identify spaces, • Subcontractors are contractors who specialize in one
shapes, and patterns. Materials, sizes, colours, and textures must be
considered in the sketches. particular aspect of the construction work such as concrete,
• Design development (DD): This step requires research and investigation into welding, glass, or carpentry.
what materials and equipment will be used as well as their cost.
• Subcontractors are hired the same way a general contractor
• Contract documents (CDs): Contract documents are the final drawings and
specifications of the construction project. They are used by contractors to would be, which is through the bidding process. Purchase
determine their bid while builders use them for the construction process. orders are also part of the procurement stage.
Contract documents can also be called working drawings.

civil engineering construction project: Stages civil engineering construction project: Stages
2. Pre-construction Stage
• The pre-construction stage begins when the owner gives a notice to
3. Construction Stage
proceed to the contractor that they have chosen through the bidding • The construction stage begins with a pre-construction
process. A notice to proceed is when the owner gives permission to the
contractor to begin their work on the project. The first step is to assign meeting brought together by the superintendent.
the project team which includes the project manager (PM), contract • The pre-construction meeting is meant to make
administrator, superintendent, and field engineer.
• Project manager: The project manager is in charge of the project decisions dealing with work hours, material storage,
team. quality control, and site access.
• Contract administrator: The contract administrator assists the
project manager as well as the superintendent with the details of the • The next step is to move everything onto the
construction contract. construction site and set it all up.
• Superintendent: It is the superintendent's job to make sure
everything is on schedule including flow of materials, deliveries, and • At this stage, construction monitoring and supervision is
equipment. They are also in stage, a site investigation must take of great importance to ensure that a project is
place.
completed on time and on budget, while meeting all
• Field engineer: A field engineer is considered an entry-level position
and is responsible for paperwork. relevant regulations and quality standards.

3
7/5/2017

civil engineering construction project: Stages civil engineering construction project: Stages
• Contractor progress payment schedule
• A Contractor progress payment schedule is a schedule of 4.Owner occupancy Stage
when (according to project milestones or specified dates)
contractors and suppliers will be paid for the current progress – Once the owner moves into the building, a
of installed work. warranty period begins. This is to ensure that all
• Progress payments are partial payments for work completed materials, equipment, and quality meet the
during a portion, usually a month, during a construction
period. Progress payments are made to general contractors, expectations of the owner that are included
subcontractors, and suppliers as construction projects within the contract.
progress. Payments are typically made on a monthly basis but
could be modified to meet certain milestones. 5.Contract Closeout-
• Progress payments are an important part of contract – Defects corrections, final payment, PCR etc.
administration for the contractor. Proper preparation of the
information necessary for payment processing can help the
contractor financially complete the project.

The functions of construction management The functions of construction management


• The Construction Management Association of America (a US
• The functions of construction management typically construction management certification and advocacy body) says the
include the following: 120 most common responsibilities of a Construction Manager fall into
the following 7 categories:
I. Specifying project objectives and plans including 1. Project Management Planning,
delineation of scope, budgeting, scheduling, setting
2. Cost Management,
performance requirements, and selecting project
participants. 3. Time Management,
4. Quality Management,
II. Maximizing the resource efficiency through 5. Contract Administration,
procurement of labour, materials and equipment. 6. Safety Management, and
III. Implementing various operations through proper 7. CM Professional Practice.
coordination and control of planning, design, CM professional practice includes specific activities, such as defining
estimating, contracting and construction in the entire the responsibilities and management structure of the project
process. management team, organizing and leading by implementing project
IV. Developing effective communications and mechanisms controls, defining roles and responsibilities, developing
communication protocols, and identifying elements of project design
for resolving conflicts. and construction likely to give rise to disputes and claims.

The role of a contractor Becoming a Successful Construction


Entrepreneur
• A contractor is assigned to a construction project once
the design has been completed by the person or is still • 1. Love what you do
in progress. This is done by going through
– The road to success is a hard one.
a bidding process with different contractors.
• The contractor is selected by using one of three • 2. Build a team immersed in your vision.
common selection methods: low-bid selection, best- – It's important to demonstrate the type of organization you
value selection, or qualifications-based selection. this is want to be.
the main role of a contractor. • 3. Come up with innovative ways to solve problems.
• A construction manager should have the ability to  Necessity really is the mother of invention.
handle public safety, time management, cost
management, quality management, decision • 4. Create a delightful customer experience.
making, mathematics, working drawings, and human – Several components come together to win customers, and
resources. everyone at the company needs to know their own role in
retaining customers.

4
7/5/2017

Becoming a Successful Construction


Entrepreneur
• 5. Quickly learn from your mistakes.
– Mistakes are inevitable. The key is to learn from them
• 6. Rely on people smarter than you.
– You can't know and do everything. You must rely on
others. "Surround yourself with people who know more
than you do.
• 7. Never sacrifice quality.
– "The key to the success of any business is to establish a
philosophy and have everyone in the business buy into
it,”
• 8. Take risks.
– In order to succeed, you must first be willing to fail – and
you must have the courage to go for it anyway.