Anda di halaman 1dari 250

DAFTAR HARGA SATUAN UPAH

DINAS PEKERJAAN UMUM KABUPATEN REMBANG


UNTUK TAHUN 2011

HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
(Rp)
1 Pekerja Hr 34,500.00
2 Tukang Kayu Hr 48,875.00
3 Tukang Batu Hr 48,875.00
4 Tukang Besi Hr 48,875.00
5 Tukang Cat Hr 48,875.00
6 Tukang Leideng Hr 48,875.00
7 Tukang Gali Hr 46,000.00
8 Tukang Plitur Hr 46,000.00
9 Tukang Kepala Hr 49,450.00
10 K e p . T u k a n g K a y u Hr 51,750.00
11 K e p . T u k a n g B a t u Hr 51,750.00
12 K e p . T u k a n g C a t Hr 51,750.00
13 K e p . T u k a n g P l i t u r Hr 51,750.00
14 K e p . T u k a n g G a l i Hr 51,750.00
15 M e k a n i k Hr 43,125.00
16 P e m b . M e k a n i k Hr 43,125.00
17 Operator alat berat Hr 49,450.00
18 P e m b . Operator Hr 40,250.00
19 S o p i r Hr 46,575.00
20 P e m b . Sopir Hr 34,500.00

Rembang, Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN UPAH
EKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

edisi januari 2011

KETERANGAN

KEPALA DINAS PEKERJAAN UMUM

file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN BAHAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 98,000
Bulat Belah m3 99,400
Pecah 5/7 m3 123,500
Pecah 3/5 m3 189,600
Tempel m2 62,500
Batu apung kg 5,500
2 KERIKIL Sawur / Koral m3 25,000
Beton 0,5 / 1 m3 237,500
Beton 1 / 1 m4 216,700
Beton 1 / 2 m3 226,300
Beton 2 / 3 m3 224,400
Biasa m3 25,850
3 BATU BATA Ex lokal I bh 365

4 PASIR Urug m3 56,300


Pasang m3 138,500
Beton (Muntilan) m3 281,300
Beton (Cepu) m3 156,300
Sirtu (pasir batu) m3 96,900
Sirtu royalty m3 24,800
Grosok m3 93,800
Abu batu m3 106,300
Abu batu (Tayu) m3 192,000
Batu alam m2 81,900
5 TANAH Padas m3 30,600
Liat m3 50,000
Biasa m3 45,400
Pilihan m3 62,500

6 KAPUR Pasang (padam) m3 178,200


Labor Kg 2,500
7 PORTLAND CEMENT
PC 50 kg zak 64,800
PC 40 kg zak 51,900
PC 50 kg Sm. Warna zak 81,300
Semen warna kg 4,600

7 BETON Adukan beton K 175 ready mix m3 816,200


Adukan beton K 225 ready mix m3 866,250
Adukan beton K 300 ready mix m3 903,870

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak 235,400

2 GENTENG BETON Genteng Beton Warna standard bh 2,500


file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Kerpus Beton Warna Standard bh 8,250
3 GENTENG TANAH LIAT
Mantili bh 900
Nok kerpus Mantili bh 2,650
Plentong Mantili besar bh 1,100
Genteng biasa bh 600
Genteng pres bh 900
Genteng Beton bh 4,000
Genteng keramik bh 10,100
Sirap bh 5,700
Genteng kerpus jatiwangi bh 9,600
Genteng kerpus lokal bh 2,900
Genteng kerpus Beton bh 8,250
Genteng kerpus keramik bh 17,600
Genteng Jatiwangi bh 3,500
5 ASBES GELOMBANG
Asbes gelombang ( 80 x 210 ) cm bh 41,700
Asbes gel. Kecil 5 mm (90 x 180) lbr 48,950
Asbes gel. Kecil 5 mm (120 x 240) lbr 73,500
Asbes gel. Besar 5 mm (90 x 180) lbr 62,500
Asbes gel. Besar 5 mm (120 x 240) lbr 96,300
Asbes gel. Kecil 0,8 x 1,80 m lbr 43,400
Asbes gel. Kecil 0,8 x 2,40 m lbr 56,300

6 ASBES PLAT
- 100cm X 100 cm X 5 mm bh 17,300
- 100cm X 200 cm X 5 mm bh 48,000
- 100cm X 240 cm X 5 mm bh 61,600
Sekrup asbes bh 1,300

7 SENG PLAT
BJLS 0,30 panjang 180 cm m' 49,850
BJLS 0,30 panjang 240 cm m' 64,750
BWG 28 x 80 m' 38,250
BWG 28 x 90 m' 42,900
8 SENG GELOMBANG
Seng gel. Kecil 0,70 x 1,80 m lbr 49,700
Seng gel. Kecil 0,70 x 2,10 m lbr 57,400
BJLS 0,28 m' 73,800
BJLS 0,28 panjang 180 cm lbr 43,800
BJLS 0,28 panjang 240 cm lbr 58,800
9 SENG TALANG
Seng talang BJLS 26 lebar 0,60 m' 21,300
Seng talang BJLS 26 lebar 0,90 m' 30,400
Seng talang BJLS 26 lebar 1,20 m' 46,200

III . B A H A N K A Y U
1 JATI Papan m3 14,687,500
Balok/pesagen m3 14,687,500

2 KAMPER Papan m3 8,125,000


Balok/pesagen m3 8,125,000

file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
3 KRUING Papan m3 5,937,500
Balok/pesagen m3 5,937,500

4 MERANTI Papan m3 3,125,000


Balok/pesagen m3 3,125,000

5 LANAN Papan m3 3,125,000


Balok/pesagen m3 3,125,000

6 BENGKIRAI Papan m3 8,125,000


Balok/pesagen m3 8,750,000

7 DOLKEN Kayu dolken sengon Ø 8-10 cm,4m. bt 32,450


Kayu perancah m3 1,875,000
8 LAIN-LAIN
Kayu randu (papan) m3 573,900
Bambu bt 15,500
Bambu Apus bt 3,800
Kayu hutan lokal sekwalitas Kruing (A) m3 4,413,750
Kayu hutan lokal sekwalitas Kruing (B) m3 2,354,000
Glugu m' 187,500
Kayu lis 2/3 m' 5,900

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 28,200
20 X 20 cm m2 21,700
20 X 20 cm Warna m2 26,100

2 KERAMIK
Keramik warna (KW-1) 30 X 30 cm m2 45,200
Keramik warna (KW-2) 30 X 30 cm m2 40,400
Keramik putih (KW-1) 30 X 30 cm m2 36,200
Keramik putih (KW-2) 30 X 30 cm m2 32,800
Keramik 10 x 20 cm m2 50,600
Keramik 20 x 20 cm m2 43,800
Keramik 20 x 25 cm m2 48,100
Keramik 10 x 20 cm m2 39,700
3 MARMER
Marmer Tulung Agung m2 552,200
Marmer Kalimantan m2 926,750
Marmer Itali m2 1,255,550

4 GRANITO
Granito 40 x 40 polished (lokal) m2 420,750
Granito 40 x 40 polished (import) m2 459,050
Granito 60 x 60 polished (lokal) m2 419,100
Granito 60 x 60 polished (import) m2 437,500

5 GRANIT
Granit lokal m2 119,350
Granit import m2 219,800
Batu Tempel m2 61,250
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
V.BAHAN CETAK
1 BUIS BETON O dan U
Ø 15 cm - 100 cm bh 35,500
Ø 20 cm - 100 cm bh 50,000
Ø 25 cm - 100 cm bh 53,200
Ø 30 cm - 100 cm bh 62,500
Ø 40 cm - 100 cm bh 78,700
Ø 50 cm - 100 cm bh 98,200
Ø 60 cm - 100 cm bh 116,900
Ø 80 cm - 100 cm bh 177,500
Ø 100 cm - 100 cm bh 292,200
U 15 cm - 100 cm bh 49,100
U 20 cm - 100 cm bh 38,600
U 30 cm - 100 cm bh 47,500

VI . B A H A N B E S I
1 BESI BETON
Besi beton polos kg 10,100
Besi beton prestress kg 16,850
Besi beton ulir kg 13,800

2 BESI PLAT
Besi Strip kg 14,700

3 BAJA
Baja profil " L" dan "C" kg 16,850
Baja profil "IWF" kg 17,650

4 KAWAT
Kawat Ikat beton/bendrat kg 16,200
Kawat bronjong kg 16,850
Kawat las listrik kg 30,000

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 ø 1/2" m' 4,100
Pipa PVC. S. 12,5 ø 3/4" m' 6,000
Pipa PVC. S. 12,5 ø 1" m' 10,250
Pipa PVC. S. 12,5 ø 1-1/4" m' 13,000
Pipa PVC. S. 12,5 ø 1-1/2" m' 20,200
Pipa PVC. S. 12,5 ø 2" m' 30,500
Pipa PVC. S. 12,5 ø 2-1/2" m' 43,750
Pipa PVC. S. 12,5 ø 3" m' 62,650
Pipa PVC. S. 12,5 ø 4" m' 93,550
Pipa PVC. S. 12,5 ø 5" m' 154,375
Pipa PVC. S. 12,5 ø 6" m' 200,400
Pipa PVC. S. 12,5 ø 8" m' 316,650
Pipa PVC. S. 12,5 ø 10" m' 499,500
Pipa PVC. S. 12,5 ø 12" m' 796,100
Pipa PVC. S. 12,5 ø 16" m' 1,342,050
2 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" ) m' 108,450
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Pipa Galvanis ( 1 1/2" ) m' 147,300
Pipa Galvanis ( 2" ) m' 276,100

VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240 X 4 mm lbr 89,600
- Tripleks
120 X 240 X 3 mm lbr 50,700
120 X 240 X 4 mm lbr 65,700
120 X 240 X 6 mm lbr 83,600
- Multipleks
. 120 X 240 X 9 mm lbr 122,900
. 120 X 240 X 12 mm lbr 184,400
Harplek 60 x 200 lbr 16,500
Harplek 50 x 200 lbr 14,300
Harplek 40 x 200 lbr 8,350
Harplek 30 x 200 lbr 10,650
Harplek 5 mm (90 x 180) lbr 27,250
Harplek 5 mm (120 x 240) lbr 100,000
Gypsum 6 mm lbr 61,900
Gypsum 9 mm lbr 75,000
Gypsum 12 mm lbr 50,750
Gypsum 20 mm lbr 54,250
Eternit 4 mm ( 100 x 100) m2 22,900
List Kayu Profil m' 6,900
Formika ukuran pintu lbr 229,550

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 20,400
Plamur kayu kg 19,200
Ambril/amplas lbr 3,200
Batu Apung kg 5,500
Cat kayu (cukup) kg 39,700
Cat kayu (baik) kg 51,000
Siralax kg 47,300
Spiritus ltr 10,800
Dempul kg 18,500
Plinkut kg 18,800
Wood filer (INFRA) kg 31,300
Oker putih kg 20,900
Oker warna kg 22,900
Melamin kg 69,400
Kuwas 3" bh 6,900
Thinner Super daimaru liter 24,600
Thinner A liter 19,200
Foxi Cat Kg 33,200
2 TEMBOK
Kapur sirih kg 800
Plamur kg 17,500
Cat Tembok dalam (cukup) kg 14,400
Cat Tembok dalam (baik) kg
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Cat Tembok luar (cukup) kg 17,100
Cat Tembok luar (baik)
Roll cat bh 15,500

3 BESI
Menie kg 23,700
Cat besi (baik) kg 46,700
Cat besi (cukup) kg 45,700
Minyak cat ltr 14,600
Lem Aica Aibon kg 20,700
Amplas Besi lbr 5,600
Ampelas norton no.3 buah 6,100
Ampelas Dico no.280 buah 3,400
Ampelas Dico no.120 buah 3,400

X.BAHAN KACA
Bening 5 mm m2 87,500
Rayband 5 mm m2 96,900

XI . BAHAN INSTALASI LISTRIK


Stop Kontak bh 7,150

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Besar bh 140,700
Kecil bh 59,400
2 ENGSEL DAN GERENDEL
Engsel H bh 5,400
Engsel Nylon bh 6,500
Grendel bh 9,500
Hak Angin bh 17,700

XIII . BAHAN SANITAIR

1 Kloset duduk Porselen bh 531,300


2 Kloset jongkok bh 112,500
3 Westafel Counter top bh 456,300
4 Bak Cuci Stainlist bh 237,500
XIV . ALAT PENGIKAT KAYU
1 Paku - ukuran 1" s/d 4" kg 15,200
2 Paku - payung kg 22,700
3 Paku - sekrup kg 20,700
4 Mur Baut 3/8 " buah 4,500
5 Lem kayu (fox) bh 16,650
6 Tali Ijuk kg 12,450
7 Lem kuning (aica aibon) kg 45,650

XV . POMPA AIR DAN TANGKI AIR


1 POMPA AIR LISTRIK
Mesin pompa 1 lt / dt buah 2,410,320
Mesin pompa 1-1/2 lt / dt buah 4,217,400
Tangki air fiber glass 3.000 lt 5mm buah 6,179,250
X VI . PAVING BLOCK
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
1 Paving Blok Holland t: 6 cm (ALDAS) m2 54,100
2 Paving Blok Holland t: 6 cm (lokal) m2 33,400
3 Paving Blok Holland t: 8 cm (ALDAS) m2 92,800
4 Paving Blok Holland t: 8 cm (lokal) m2 43,800
5 Paving blok warna 6 cm (lokal) m2 47,100
6 Paving blok warna 8 cm (lokal) m2 50,000
7 Kanstin 10/12,5 x 30 x 50 (ALDAS) bh 20,200
8 Paving Blok Hexagonal Kecil t: 6 cm, (ALDAS) m2 69,700
9 Paving Blok Hexagonal Kecil t: 8 cm, (ALDAS) m2 93,900
10 Kanstin 10 x 20 x 50 (ALDAS) bh 10,100
11 Kanstin 10/12,5 x 25 x 50 (ALDAS) bh 16,500

XVII. RTH (JALUR HIJAU DAN TAMAN)


1 PUPUK
KCL, KS, ZK Kg 4,950
Pupuk Kandang Ton 275,000
Pupuk Kompos Ton 825,000
Pupuk Organik/Bokhasi Kg 2,200
Pupuk Phonska Kg 2,750
SP 36 Kg 2,750
Urea Kg 2,750

2 OBAT - OBATAN
Fastac 25 EC 50 mL 11,000

3 TANAMAN HIAS
Agape Batang 66,000
Angsana Batang 11,000
Apinika Buah 2,750
Bambu Hias Rumpun 26,400
Bambu Jepang Buah 18,150
Bougenville Biasa Batang 24,200
Bougenville Parigata Batang 36,300
Cemara Bola Buah 9,680
Cemara Buaya Buah 6,600
Cemara Gimbal Batang 55,000
Cemara Kipas Batang 26,620
Cemara Non Flok/Ventris Batang 72,600
Daun Walisongo Buah 11,000
Glodogan Batang 72,600
Glodogan Pecut Batang 205,700
Jaranan Batang 6,600
Kamboja Jepang Batang 48,400
Ketapang Batang 33,000
Krokot Putih Rumpun 2,750
Lamtana Rebah Batang 2,750
Lamtana Tegak Batang 18,150
Mahoni 1 Meter Batang 10,164
Mimbo Batang 6,050
Mirten Buah 11,000
Palem Botol Batang 347,300
Palem Ekor Tupai Batang 172,500
Palem Kuning Batang 23,000
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Palem Merah Batang 28,000
Palem Raja/Putri Batang 115,000
Palem Wergu Batang 28,500
Pangkas Kuning Batang 4,000
Pangkas Merah Batang 4,000
Pinisium Batang 34,500
Rumput Jepang M2 4,600
Sawo Kecik Batang 50,600
Sikas Batang 575,000
Tanaman Taiwan Buah 3,500
Tanjung Batang 69,000
Teh - tehan Rumpun 14,000

4 ALAT - ALAT PERTAMANAN


Ajir Tanaman Buah 500
Ajir Tanaman Mangrove Buah 700
Batu Asahan Buah 12,000
Bambu Usuk Buah 6,000
Busi Mesin Potong Rumput Buah 11,000
Cetok Buah 20,900
Chain Saw 038 STIHL Buah 11,000,000
Chain Saw 070 STIHL Buah 13,750,000
Gunting Dahan Buah 125,400
Membran Karburator Chain Saw Buah 165,000
Membran Oli Chain Saw Buah 55,000
Mesin Potong Rumput Dorong Buah 6,600,000
Mesin Potong Rumput Gendong Buah 7,700,000
Mesin Pompa Air G x 160 + Ø 2" Buah 3,575,000
Patok Batas Buah 5,500
Pisau M. Ptng Rmput Dorong/Gendong Buah 550,000
Piston Set Chain Saw Buah 660,000
Piston Set M. Ptng Rmpt Drong/Gndong Buah 660,000
Pot Tanaman Hias Buah 275,000
Pot Tanaman Palem Buah 137,500
Rantai Chain Saw 038 STIHL Buah 275,000
Rantai Chain Saw 070 STIHL Buah 280,000
Seal Ker As Mesin M. Ptng Rmput Buah 60,500
Srumbung Bambu Buah 35,000
Srumbung Kayu Buah 22,000
Selang Biasa 2" Meter 14,000
Selang Lipat 2" Meter 6,000
Selang Spiral Meter 39,000
Tali Starter Chain Saw Buah 17,000
Trucuk Bambu Batang 7,000

5 BAHAN KEND. TDK. BERMOTOR


As Belakang Buah Buah 11,000
As Tengah Buah Buah 19,000
Ban Dalam Buah Buah 15,000
Ban Luar Buah Buah 50,000
Bos Samping Buah Buah 15,000
Laker Buah Buah 7,000
Pedal Buah Buah 12,000
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Pelek Buah Buah 56,000
Per Buah Buah 35,000
Rantai Buah Buah 12,000
Ruji Buah Buah 500
Sadel Buah Buah 18,000

6 PERALATAN KEBERSIHAN DAN BHN. PEMBERSIH


Angkus Buah Buah 17,000
Bendo Buah Buah 22,000
Cangkul Buah Buah 30,800
Ekrak Buah Buah 8,800
Ganco Buah Buah 33,000
Gunting Pangkas Buah Buah 105,000
Linggis Buah Buah 13,750
Sabit Buah Buah 19,250
Sapu Lidi Buah Buah 6,600
Skrap Buah Buah 5,500

XVIII. LAMPU PENERANGAN JALAN UMUM (LPJU)


1 Baut 3/8” Buah 1,000
2 Besi L Buah 60,000
3 Box KWH Meter 1 Phasa Buah 299,000
4 Box Trafo Buah 38,500
5 Conector Buah 6,250
6 Contactor SN 35 Buah 423,500
7 Cor Ornamen Tiang Listrik Buah 350,000
8 Cup Piring Buah 25,000
9 Cupit Urang Buah 3,300
10 Fitting E 40 Buah 32,500
11 Fitting WD 27 Buah 17,500
12 Fotto cell 10 A Buah 125,400
13 Fotto cell 6 A Buah 84,700
14 Groundhing/ardhe Buah 23,000
15 Housing Lamp 125 W Buah 800,000
16 Housing Lamp 250 W Buah 1,540,000
17 Ignisitor Buah 52,000
18 Isolasi Buah 10,000
19 Kabel LVTC 2 x 10 mm Meter 65,000
20 Kabel LVTC 2 x 16 mm Meter 7,500
21 Kabel NYM 2 x 2,5 mm Meter 8,000
22 Kabel NYM 2 x 4 mm Meter 20,000
23 Kabel NYY 2 x 4 mm Meter 16,000
24 Kabel NYY 2 x 6 mm Meter 18,200
25 Kapasitor Buah 48,750
26 Konsul Besi Ø 1,25" MG Batang 185,000
27 Konsul Besi Ø 2" MG Batang 225,000
28 Kotak APP/Double cover Buah 750,000
29 KWH Meter 20/60 A Buah 475,000
30 KWH Meter 50/20 A Buah 397,500
31 L Booh 1" Buah 2,000
32 Lampu HPIT 250 W Buah 240,500
33 Lampu Mercury 250 W Buah 87,500
34 Lampu Mercury 125 W Buah 42,500
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
35 Lampu Mercury 80 W Buah 40,000
36 Lampu Selang Meter 30,000
37 Lampu Son T 150 W Buah 98,000
38 Lampu Son T 250 W Buah 115,700
39 M C B 25 A Buah 31,000
40 M C B 63 A Buah 173,500
41 OK KWH Meter Buah 28,000
42 Pal Besi Ø 2" dan 1" MG Buah 499,000
43 Pal Besi Ø 4 & 3 MG Buah 1,550,000
44 Pemasangan LPJU Unit 90,000
45 Pole Band Ø 8,5” Buah 26,000
46 SJ. 5 Buah 42,400
47 Soket Lampu Selang Meter 13,500
48 T Does/Boxlit Buah 19,500
49 Terminal Box Meter Buah 26,000
50 Trafo Mercury 125 W Buah 114,500
51 Trafo Mercury 250 W Buah 188,500
52 Trafo BSN 150 W Buah 197,000
53 Trafo BSN 250 W Buah 235,000
54 Lampu Hias Christmas Unit 26,812,500
55 Lampu Hias Windmill Unit 21,000,000
56 Lampu Hias Cotton Rose Unit 20,687,500
57 Lampu Hias Number One Unit 20,312,500
58 Lampu Hias Dragon Phoenix Unit 19,625,000
59 Lampu Hias Hepla Unit 19,625,000
60 Tangga Besar 12 m Buah 8,562,500
61 Tangga Kecil 6 m Buah 4,375,000
62 Crystalite Buah 112,500
63 Lampu XL 18 Watt Buah 37,500
64 Sabuk Pengaman Buah 2,775,000

XIX. ALAT PEMADAM KEBEKARAN


1 Selang Pemadam Kebakaran fire house Appron/Murata/ Yamato with Machino Working Pressure 10 Kg/cm2
- 1,5” x 30 m, W/Coupling roll 1,643,375
- 1,5” x 20 m, W/Coupling roll 1,343,750
- 2” x 30 m, W/Coupling roll 1,593,750
- 2” x 20 m, W/Coupling roll 1,381,250
- 2,5” x 40 m roll 2,650,500
- 2,5” x 30 m, W/Coupling roll 2,437,500
- 2,5” x 20 m, W/Coupling roll 1,981,250

2 Without Coupling
- 1,5” x 20 m Tertera 334,800
- 1,5” x 30 m Tertera 502,800
- 2” x 20 m Tertera 502,800
- 2” x 30 m Tertera 765,600
- 2,5” x 20 m Tertera 612,000
- 2,5” x 30 m Tertera 931,200
- 2,5” x 40 m Tertera 1,239,600

3 Hydrant Box Kosong


- A1 (66 x 52 x 15 cm) Appron 780,000
- A1 (100 x 80 x 18 cm) Appron 2,122,200
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
- A1 (125 x 75 x 18 cm) Appron 2,543,400
- A1 (95 x 66 x 20 cm) Appron 2,122,200
- A1KACA + Kunci, Tempered 5 mm Appron 1,441,800
- A2KACA + Kunci, Tempered 5 mm Appron 2,478,600
- B KACA + Kunci, Tempered 5 mm Appron 2,899,800
- C KACA + Kunci, Tempered 5 mm Appron 2,478,600

4 Fire Fighting Equipment Machino Coupling material Brass


- 1,5’ Tertera 107,500
- 2” Tertera 131,250
- 2,5” Tertera 192,500
- 3” Tertera 305,000

5 Straight Nozzle (Machino Coupling) With Nozzle tip, Material Brass/ Branch pipa with straight Nozzle
- 1,5’ Seamless Tertera 420,000
- 2” Seamless Tertera 532,500
- 2,5” Seamless, Short, W/O Grip Tertera 582,500
- 2,5” Seamless, Long, W/O Grip Tertera 725,000
- 2,5” Seamless, Long, W/ Grip Tertera 746,250
- 1,5’ Appron 42,250
- 2” Appron 593,125
- 2,5” Appron 966,875

6 Hydrant Valve (Machino Coupling) 90


Material Brass. 10 K
- 1,5’ Tertera 207,600
- 2” Tertera 290,000
- 2,5” Tertera 472,800

7 Hydrant Valve (Machino Coupling) 90


Material Brass. 20 K
- 1,5’ Tertera 429,600
- 2” Tertera 666,250
- 2,5” Tertera 898,750

8 Hose Rack
- 1,5”, 1,24 COMB Unit 536,250
- 2,5”, 1,24 COMB Unit 585,000

9 Spray Nozzle Head


- 1,5’ Tertera 258,750
- 2” Tertera 390,000

10 Hose Reel
- 1” Hose Reel, Swing Type Complete
With box Siamese Conention
4” x 2,5” x 2,5” Machino Coupling Tertera 1,860,000

11 Hydrant Pillar
- H14 AP 4” x 2,5” x 2,5” Tertera 5,768,400
- H13 AP 3” x 2,5” Tertera 3,084,200

12 On Trollen
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
- Type AC 15 kapasitas 6 kg buah 2,048,150
- Type AC 50 kapasitas 23 kg buah 5,830,500

13 Pemancar Pemadam Kebakaran


- 1,5” (Variable) Tertera 2,160,000
- 2,5” (Variable) Tertera 3,000,000

14 Noksel Foam buah 11,354,970


15 Foise Cabang 2 (dua) buah 4,455,000
16 Liquite kg 110,400
17 Pengisian Tabung Pemadam Kebakaran kg 72,000
18 Selang Isap 2,3” – 4 M unit 32,500,000

XX . L A I N - L A I N
1 Alat bantu (harga rata-rata) lot 12,500
2 Aspal kg 8,500
3 Minyak aspal ltr 2,000
4 Bensin ltr 4,500
5 Solar liter 4,500
6 Minyak tanah ltr 3,600
7 Olie (minyak pelumas) liter 31,300
8 Stempet Kg 18,200
9 Gebalan rumput m2 12,450
10 Wiremesh MS m2 66,000
11 Kayu bakar m3 88,275
12 Pintu Ronsel Doble 200 x 200 x 300 buah 37,500,000
13 Pintu Ronsel Doble 150 x 150 x 300 buah 31,250,000
14 Pintu Ronsel Engkel 100 x 100 x 300 buah 15,625,000
15 Pintu Intake 100 x 100 x 300 buah 8,750,000
16 Pintu Intake 90 x 100 x 300 buah 6,875,000
17 Pintu Intake 80 x 80 x 300 buah 6,250,000
18 Pintu Intake 60 x 60 x 300 buah 5,625,000
19 Pintu Intake 50 x 50 x 300 buah 4,375,000
20 Pintu Intake 40 x 40 x 300 buah 4,062,500
21 Pintu Intake 30 x 40 x 300 buah 3,750,000
22 Nomenklatur Marmer ( 30 x 40 ) buah 494,500
23 Nomenklatur Marmer ( 15 x 20 ) buah 123,500
24 Pile Scale ( 20 x 100 ) buah 494,500
25 Pile Scale ( 12 x 100 ) buah 309,000
26 Lapisan kedap air kg 53,000
27 Nako lengkap daun 49,500
28 PAGAR BRC. Pagar BRC 90 A1 /lb 441,500
Pagar BRC 120 A1 /lb 515,000
Pagar BRC 150 A1 /lb 809,500
Pagar BRC 90 A2 /lb 367,500
Pagar BRC 120 A2 /lb 441,500
Pagar BRC 150 A2 /lb 735,500
Pipa Tiang BRC 90 - 2" unit 184,000
Pipa Tiang BRC 120 - 2" unit 213,500
Pipa Tiang BRC 150 - 2" unit 228,500
29 Minyak Beton & bekisting ltr 20,000
30 Allumunium sheet 0,3 mm (90 x 180) lbr 118,800
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
31 Shear Connector kg 10,000

rasionalisasi Rembang, A
tidak ada bahan, harga tahun kemarin tambah 5%
perbedaan tll mencolok KEPALA DINAS PEKE
sama dengan harga tahun kemarin KABUPATEN R

NIP. 19620715 19

file:///conversion/tmp/scratch/385673381.xlsx
G

MUBAROK ARDI KARYA SINAR LAUT AL HASAN


RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

200,000
70,000 100,000
125,000

60,000
15,000

225,000

170,000 225,000
165,000 225,000

275 300 350

110,000
130,000 175,000 80,000
350,000
130,000 175,000
85,000
85,000
145,000
175,000

55,000
40,000
55,000 53,000

800,000
1,500

52,500 52,000 41,500 51,000 41,000

65,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

800 800 500 550 500

1,000 650
300
600 800 550 550
1,500 1,100
4,900 5,500 5,000

7,500 8,800
2,000 3,500 1,500
2,500
17,000 17,500
1,600

31,000
27,500 27,000 22,500
51,000
55,000
70,000
27,000 33,000
37,000

12,500 17,500 12,000 11,000


80,000 12,000 12,000

750 2,500

40,000
47,000

55,000
68,000

15,000 16,000
22,500 27,500

17,000,000
17,000,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
4,500,000 6,000,000 4,000,000
4,500,000 6,000,000 4,000,000

4,000,000 6,000,000
4,000,000 6,000,000

7,000,000 9,000,000 6,500,000


7,000,000 9,000,000 6,500,000

400,000

25,000

5,000

21,000
20,000
22,000

35,000 42,000 28,000 27,000


33,000 38,000 27,000 26,000
30,000 28,000 26,000 25,000
28,000 26,000 23,500

40,000 35,000 32,500


35,000 43,000 34,000 31,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

40,000

30,000 55,000
50,000 70,000
70,000 80,000
85,000 100,000
115,000 115,000
165,000 185,000

30,000
19,000 33,000
27,500 50,000

12,500 15,000 13,000 13,000


17,000
26,000 21,000

18,000 6,000 17,500 10,000


22,500 7,000 22,000 13,000
28,000 9,000 27,000

13,000 27,000
25,000
31,000
44,000
62,000 52,500 50,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

95,000

40,000 45,000 38,000 34,000


60,000
65,000 70,000 65,000 55,000

115,000 95,000

60,000
60,000
60,000

12,500 15,000 11,000

90,000

25,000 20,000 15,000 12,500 12,000


20,000 10,000
5,000 2,500 3,500

35,000 35,000 33,000


50,000 52,000 35,000 36,000 37,000
75,000 75,000 55,000 60,000
8,500 12,000 12,000 8,000 8,000
20,000

25,000 25,000
25,000
25,000
40,000
9,000 5,000 5,000

24,000 18,000

20,000
35,000
35,971 12,000 60,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
3,555 8,000 62,000 7,000
22,000
12,500 16,000 11,000 12,000

25,000 20,000 17,000 30,000


50,000 52,000 36,000
35,000 35,000 38,000
15,000 12,000 16,000 8,000

5,000
5,000
5,000 2,000
5,000 2,000

225,000 55,000
55,000 25,000

950,000 250,000
90,000 100,000 82,500 90,000
300,000 250,000
450,000 150,000

13,000 15,000 13,000 11,000 13,000


16,000 30,000 20,000 17,500 20,000

11,500 12,000 11,000 9,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

28,000
28,000

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

Pressure 10 Kg/cm2

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9

Rembang, April 2010

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

75,000 90,000

150,000
90,000

150,000
150,000
170,000 175,000
170,000 175,000

300 270 280 300

75,000
100,000 95,000

110,000
95,000

110,000

60,000

20,000

1,000

52,000 53,000 52,000 52,500

75,000 90,000 62,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

600 700

850
300
500 540

1,050 2,000

38,000
45,000 23,000 23,000

74,000

13,000
26,000

40,000
45,000

19,000 15,500
26,000 22,500

8,000,000
8,000,000

8,000,000
8,000,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
7,000,000
7,000,000

7,000,000 7,500,000
7,000,000 7,500,000

20,000

30,500 31,000
27,500 27,000
27,500 26,000 27,500
25,000 25,000

27,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

25,000

35,000
55,000 42,500
65,000
70,000
85,000 90,000
160,000 122,500
240,000

17,500 19,000
25,000 29,000

14,000 15,000 15,000 15,500 15,000

25,000 23,000 21,000

8,500 12,000 22,000 17,500


12,500 14,000 21,500
17,000 16,000 27,000

35,000 20,000 27,000

120,000 56,000

210,000
371,000
647,500

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

100,000

38,000 42,000 47,000 43,000 40,000


65,000 47,500
60,000 75,000 70,000 62,500

110,000 95,000
140,000 127,500

12,000 11,000

15,000 17,500 21,000 12,500


18,000 20,000 21,000 11,500
3,750 3,000 3,000 3,000 3,125

36,000 30,000 37,000


40,000
60,000 55,000 70,000 65,000 55,000
7,500 8,000 8,000 8,500 8,000
20,000
21,000 20,000
25,000 26,000 25,000
6,000 20,000
15,000 15,000 20,000
45,000
4,000 5,000 9,000 4,000 6,500
25,000 24,000
22,500 18,000 19,000 18,500
29,000 48,000

10,000 20,000
8,000 9,000 12,000
15,000 8,800
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
12,000
33,500
9,500 12,000 15,000 10,500 9,500

20,000 30,000
36,000 60,000 37,000
42,000 35,000
20,000 6,500 18,500
45,000 40,000 45,000
3,750 3,000 5,000 3,500 3,000
5,000 4,000
2,000 3,000 3,000 2,000
2,000 3,000 3,000 2,000

65,000 95,000 60,000

120,000 95,000
27,500 100,000 65,000

95,000 90,000

155,000 175,000 165,000 165,000

11,000 12,000 15,000 14,000 12,000


27,000 25,000 24,000 18,500 20,000

2,000
12,000 11,500 12,000 11,000 10,500
5,000
45,000 40,000 45,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

23,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

24,000

file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

71,429 65,000 75,000


100,000
100,000 125,000

150,000 155,000
150,000 120,000 160,000
150,000 110,000 150,000

275 250

107,143 140,000

60,000
45,000
50,000

60,000 55,000

25,000
25,000
30,000

52,000 52,000 41,000

80,000

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

500 500 550 600

800 800 600


300 650
800 500 650 650
1,200 1,500
4,500

5,000 5,000
1,500 2,000
5,000
12,000
2,250 2,000

27,000
33,000 30,000
47,000

35,000
40,000

12,000 12,000

500

33,000
43,000

17,000 19,500 15,000


22,000 25,000 22,000

6,500,000
6,500,000

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
3,500,000
3,500,000

6,000,000
6,000,000

5,000
10,000

20,000 20,000 25,000 37,500


15,000 17,000
19,000 22,000

27,000 27,500 29,500


25,000 26,500
23,000 25,000
20,000 24,000

30,000 35,000 37,000


30,000 35,000 35,000
25,000

85,000
100,000
85,000
100,000

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

14,000 14,000 12,000

22,000

4,200 8,500 11,500


5,000 12,500 14,500
6,300 15,000

11,700 20,000

13,000 50,000

49,000
88,000
153,000
208,000
353,000

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

45,000

35,000 38,000 40,000 45,500 37,000


45,000 45,000 50,000
55,000 65,000 60,000

90,000 95,000
115,000 110,000 130,000

11,000 12,000 15,000

15,000 17,500
13,000
2,000 3,500

20,000 37,500 25,000


36,000
65,000
9,000 9,000
12,500 13,000

30,500
30,000
30,000 20,000

5,000 5,000

15,000

8,000 6,000 8,000 7,500


10,000 12,000 14,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
12,000
20,000
10,000 10,000

15,000 20,000
37,500

5,000 8,000

3,500

80,000

150,000
70,000 90,000
225,000
175,000

12,000 13,000 13,000 10,000


20,000 21,000 18,000 20,000

9,000 11,000 13,000

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

27,500

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

3,800 3000
5,700 5833
9,620 7667
11,880 12042
18,770 18708
28,390 27625
40,970 40833
60,210 59167
88,120 85542
144,050
190,000 184583
295,450 288333
466,220 451250
743,260 712500
1,245,690

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

6,000
125,000
1,000,000
700
2,300
2,000
1,600

6,500

12500 - 75000

15000 - 25000
15000 - 25000
5000 - 75000
7500 - 75000
5000 - 25000
7500 - 25000
7500 - 25000
7500 - 25000
17500 - 75000
7500 - 50000
5000 - 35000
5000 - 35000

15000 - 75000
5000 - 25000
2500 - 5000
2500 - 5000
2500 - 5000

2500 - 5000
15000 - 250000
7500 - 150000
7500 - 150000
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
15000 - 150000
7500 - 60000
15000 - 35000
2500 - 15000
2500 - 15000

10,000
10000 - 35000
45000 - 150000
2500 - 7500
5000 - 15000
2500 - 15000

10,000
25,000
6,700,000

30,000

1,000,000
1,300,000

35,000

165,000

15,000
7,500

3,200
22,500
5,000

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24

file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29

102,900 126,053 126,100 28,100


78,061 95,625 95,700 (3,700)
112,500 137,813 137,900 14,400
183,750 183,800 (5,800)
75,000 91,875 91,900 29,400
15,000 18,375 18,400 12,900
26,300
187,500 229,688 229,700 (7,800)
189,875 190,000 (26,700)
167,143 204,750 204,800 (21,500)
163,571 200,375 200,400 (24,000)
27,200
289 354 400 35

59,115 59,200 2,900


118,163 144,750 144,800 6,300
214,375 214,400 (66,900)
138,333 169,458 169,500 13,200
80,000 98,000 98,000 1,100
65,000 79,625 79,700 54,900
97,500 119,438 119,500 25,700
142,500 174,563 174,600 68,300
201,600
58,333 71,458 71,500 (10,400)
32,200
40,000 49,000 49,000 (1,000)
42,000 42,000 (3,400)
46,000 56,350 56,400 (6,100)

187,110 187,200 9,000


1,250 1,531 1,600 (900)

49,375 60,484 60,500 (4,300)


54,500
74,400 91,140 91,200 9,900
4,900

857,100
909,600
949,100

247,200

2,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
8,700

600 735 800 (100)


2,800
783 960 1,000 (100)
388 475 500 (100)
614 752 800 (100)
1,325 1,623 1,700 (2,300)
4,975 6,094 6,100 (4,000)
6,000
6,575 8,054 8,100 (1,500)
1,936 2,371 2,400 (500)
3,750 4,594 4,600 (3,650)
15,500 18,988 19,000 1,400
1,950 2,389 2,400 (1,100)

32,000 39,200 39,200 (2,500)


28,875 35,372 35,400 (13,550)
49,000 60,025 60,100 (13,400)
55,000 67,375 67,400 4,900
72,000 88,200 88,200 (8,100)
31,667 38,792 38,800 (4,600)
38,500 47,163 47,200 (9,100)

12,857 15,750 15,800 (1,500)


32,500 39,813 39,900 (8,100)
64,700
1,250 1,531 1,600 300

52,400
68,000
40,200
45,100

40,000 49,000 49,000 (700)


46,000 56,350 56,400 (1,000)
77,500
44,000 53,900 53,900 10,100
55,500 67,988 68,000 9,200

16,714 20,475 20,500 (800)


23,929 29,313 29,400 (1,000)
48,600

12,500,000 15,312,500 15,312,500 625,000


12,500,000 15,312,500 15,312,500 625,000

7,250,000 8,881,250 8,881,300 756,300


7,250,000 8,881,250 8,881,300 756,300

file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
5,000,000 6,125,000 6,125,000 187,500
5,000,000 6,125,000 6,125,000 187,500

3,281,250 3,281,300 156,300


3,281,250 3,281,300 156,300

3,281,300
3,281,300

7,166,667 8,779,167 8,779,200 654,200


7,166,667 8,779,167 8,779,200 29,200

34,100
1,968,750 1,968,800 93,800

602,600
16,275 16,300 800
3,990 4,000 200
4,634,500
2,471,700
196,900
5,000 6,125 6,200 300

23,917 29,298 29,300 1,100


17,333 21,233 21,300 (400)
21,000 25,725 25,800 (300)

30,833 37,771 37,800 (7,400)


28,750 35,219 35,300 (5,100)
26,444 32,394 32,400 (3,800)
24,500 30,013 30,100 (2,700)
53,200
34,917 42,773 42,800 (1,000)
33,750 50,505 50,600 2,500
25,000 41,685 41,700 2,000

579,900
973,100
1,318,400

85,000 441,788 441,800 21,050


100,000 482,003 482,100 23,050
85,000 440,055 440,100 21,000
100,000 459,375 459,400 21,900

125,400
230,800
64,400
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29

32,500 39,813 39,900 4,400


52,500
40,000 49,000 49,000 (4,200)
54,375 66,609 66,700 4,200
71,667 87,792 87,800 9,100
85,000 104,125 104,200 6,000
101,250 124,031 124,100 7,200
158,125 193,703 193,800 16,300
240,000 294,000 294,000 1,800
51,555 51,600 2,500
34,650 35,000 (3,600)
32,875 40,272 40,300 (7,200)

10,700
17,700
14,500

15,500

17,700
18,600

14,000 17,150 17,200 1,000


17,000 20,825 20,900 4,050
23,000 28,175 28,200 (1,800)

3,400 4,131 4,200 100


5,767 7,007 7,100 1,100
8,643 10,502 10,600 350
11,961 14,532 14,600 1,600
18,739 22,768 22,800 2,600
28,008 34,029 34,100 3,600
40,902 49,696 49,700 5,950
59,688 72,521 72,600 9,950
86,831 105,499 105,500 11,950
144,050 175,021 175,100 20,725
187,292 227,559 227,600 27,200
291,892 354,648 354,700 38,050
458,735 557,363 557,400 57,900
727,880 884,374 884,400 88,300
1,245,690 1,513,513 1,513,600 171,550

113,900
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
154,700
290,000

80,000 98,000 98,000 8,400

40,179 49,219 49,300 (1,400)


52,083 63,802 63,900 (1,800)
63,864 78,233 78,300 (5,300)

100,000 122,500 122,500 (400)


171,500 171,500 (12,900)
17,400
15,100
8,800
11,200
28,700
105,000 105,000 5,000
60,000 73,500 73,500 11,600
60,000 73,500 73,500 (1,500)
53,300
57,000
12,438 15,236 15,300 (7,600)
7,300
241,028 241,100 11,550

16,636 20,380 20,400 -


16,214 19,863 19,900 700
3,238 3,966 4,000 800
5,800
32,056 39,268 39,300 (400)
40,857 50,050 50,100 (900)
63,500 77,788 77,800 30,500
8,875 10,872 10,900 100
16,375 20,059 20,100 1,600
20,500 25,113 25,200 6,400
26,083 31,952 32,000 700
20,250 24,806 24,900 4,000
20,833 25,521 25,600 2,700
55,125 55,200 (14,200)
5,750 7,044 7,100 200
24,500 30,013 30,100 5,500
19,286 23,625 23,700 4,500
35,525 35,600 2,400

900
16,667 20,417 20,500 3,000
11,688 14,317 14,400 -
20,971 25,690 25,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
17,426 21,347 21,400 4,300
25,167 30,829 30,900
11,636 14,255 14,300 (1,200)

22,125 27,103 27,200 3,500


44,071 53,988 54,000 7,300
37,000 45,325 45,400 (300)
12,111 14,836 14,900 300
43,333 53,083 53,100 32,400
3,821 4,681 4,700 (900)
4,667 5,717 5,800 (300)
2,833 3,471 3,500 100
2,833 3,471 3,500 100

91,900
75,000 91,875 91,900 (5,000)

7,600

123,750 151,594 151,600 10,900


54,500 66,763 66,800 7,400

5,700
6,900
10,000
18,600

450,000 551,250 551,300 20,000


88,438 108,336 108,400 (4,100)
367,500 367,500 (88,800)
205,000 251,125 251,200 13,700

12,643 15,488 15,500 300


21,214 25,988 26,000 3,300
21,800
2,000 2,450 2,500 (2,000)
11,125 13,628 13,700 (2,950)
5,000 13,073 13,100 650
43,333 53,083 53,100 7,450

2,530,900
4,428,300
6,488,300

file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
56,900
26,167 32,054 32,100 (1,300)
28,000 97,440 97,500 4,700
46,000
49,500
52,500
21,300
73,200
98,600
10,700
17,400

6,000 7,350 7,400 2,450


288,750 288,800 13,800
866,250 866,300 41,300
700 858 900 (1,300)
2,300 2,818 2,900 150
2,000 2,450 2,500 (250)
1,600 1,960 2,000 (750)

6,500 7,963 8,000 (3,000)

12500 - 75000 15313 - 91875 15400 - 91900


11,600
2,900
15000 - 25000 18375 - 30625 18400 - 30700
15000 - 25000 18375 - 30625 18400 - 30700
5000 - 75000 6125 - 91875 6200 - 91900
7500 - 75000 9188 - 91875 9200 - 91900
5000 - 25000 6125 - 30625 6200 - 30700
7500 - 25000 9188 - 30625 9200 - 30700
7500 - 25000 9188 - 30625 9200 - 30700
7500 - 25000 9188 - 30625 9200 - 30700
17500 - 75000 21438 - 91875 21500 - 91900
7500 - 50000 9188 - 61250 9200 - 61300
5000 - 35000 6125 - 42875 6200 - 42900
5000 - 35000 6125 - 42875 6200 - 41900
7,000
15000 - 75000 18375 - 91875 18400 - 91900
5000 - 25000 6125 - 30625 6200 - 30700
2500 - 5000 3063 - 6125 3100 - 6200
2500 - 5000 3063 - 6125 3100 - 6200
2500 - 5000 3063 - 6125 3100 - 6200
10,700
6,400
2500 - 5000 3063 - 6125 3100 - 6200
15000 - 250000 18375 - 306250 18400 - 306300
7500 - 150000 9188 - 183750 9200 - 183800
7500 - 150000 9188 - 183750 9200 - 183800
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
15000 - 150000 18375 - 183750 18400 - 183800
7500 - 60000 9188 - 73500 9200 - 73500
15000 - 35000 18375 - 42875 18400 - 42900
2500 - 15000 3063 - 18375 3100 - 18400
2500 - 15000 3063 - 18375 3100 - 18400
36,300
10,000 12,250 12,300 7,700
10000 - 35000 12250 -- 42875 12300 - 42900
45000 - 150000 55125 - 183750 55200 - 183800
2500 - 7500 3063 - 9188 3100 - 9200
5000 - 15000 6125 - 18375 6200 - 18400
2500 - 15000 3063 - 18375 3100 - 18400

600
800
12,600
6,300
10,000 12,250 12,300 1,300
25,000 30,625 30,700 9,800
11,550,000 11,550,000 550,000
14,437,500
131,670 131,700 6,300
173,300
57,800
6,930,000
8,085,000 8,085,000 385,000
3,753,750 3,753,800 178,800
5,800
577,500 577,500 27,500
693,000
693,000
288,800
144,400
288,750 288,800 13,800
294,000
63,525 63,600 3,100
36,750 36,800 1,800
23,100
14,700
6,300 6,300 300
40,950 41,000 2,000
17,850 17,900 900
7,400

11,600
20,000
15,800
52,500
15,800
7,400
12,600
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
58,800
36,800
12,600
600
18,900

17,900
23,100
32,400
9,300
34,700
110,300
14,500
20,300
7,000
5,800

1,100
63,000
314,000
40,500
6,600
444,700
367,500
26,300
3,500
34,200
18,400
131,700
89,000
24,200
840,000
1,617,000
54,600
10,500
68,300
7,900
8,400
21,000
16,800
19,200
51,200
194,300
236,300
787,500
498,800
417,400
2,100
252,600
91,900
44,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
42,000
31,500
102,900
121,500
32,600
182,200
29,400
524,000
1,627,500
94,500
27,300
44,600
14,200
20,500
27,300
120,300
198,000
206,900
246,800
28,153,200
22,050,000
21,721,900
21,328,200
20,606,300
20,606,300
8,990,700
4,593,800
118,200
39,400
2,913,800

1,988,470 1,988,470 2,435,876 2,435,900 792,525


1,625,977.5 1,625,977.5 1,991,822 1,991,900 648,150
1,928,439.5 1,928,439.5 2,362,338 2,362,400 768,650
1,671,312.5 1,671,312.5 2,047,358 2,047,400 666,150
3,207,105 3,207,105 3,928,704 3,928,800 1,278,300
2,949,375 2,949,375 3,612,984 3,613,000 1,175,500
2,397,312.5 2,397,312.5 2,936,708 2,936,800 955,550

405,130 405,130 496,284 496,300 161,500


608,410 608,410 745,302 745,400 242,600
608,410 608,410 745,302 745,400 242,600
926,365 926,365 1,134,797 1,134,800 369,200
748,520 748,520 916,937 917,000 305,000
1,126,785 1,126,785 1,380,312 1,380,400 449,200
1,499,905 1,499,905 1,837,384 1,837,400 597,800

943,800 943,800 1,156,155 1,156,200 376,200


2,567,895 2,567,895 3,145,671 3,145,700 1,023,500
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
3,677,525 3,677,525 4,504,968 4,505,000 1,961,600
2,567,895 2,567,895 3,145,671 3,145,700 1,023,500
1,744,600 1,744,600 2,137,135 2,137,200 695,400
2,999,150 2,999,150 3,673,959 3,674,000 1,195,400
3,508,780 3,508,780 4,298,256 4,298,300 1,398,500
2,999,150 2,999,150 3,673,959 3,674,000 1,195,400

130,075 130,075 159,342 159,400 51,900


158,812.5 158,813 194,545 194,600 63,350
232,925 232,925 285,333 285,400 92,900
369,050 369,050 452,086 452,100 147,100

508,200 508,200 622,545 622,600 202,600


644,325 644,325 789,298 789,300 256,800
704,825 704,825 863,411 863,500 281,000
877,350 877,350 1,074,754 1,074,800 349,800
902,962.5 902,963 1,106,129 1,106,200 359,950
51,122.5 51,123 62,625 62,700 20,450
717,695 717,695 879,176 879,200 286,075
1,169,905 1,169,905 1,433,134 1,433,200 466,325

230,000 230,000 281,750 281,800 74,200


250,000 250,000 306,250 306,300 16,300
570,000 570,000 698,250 698,300 225,500

512,500 512,500 627,813 627,900 198,300


782,850 782,850 958,991 959,000 292,750
1,250,500 1,250,500 1,531,863 1,531,900 633,150

600,000 600,000 735,000 735,000 198,750


675,500 675,500 827,488 827,500 242,500

315,500 315,500 386,488 386,500 127,750


500,000 500,000 612,500 612,500 222,500

2,100,000 2,100,000 2,572,500 2,572,500 2,572,500

- 1,953,000 1,953,000 93,000

6,979,775 6,979,775 8,550,224 8,550,300 2,781,900


3,731,915 3,731,915 4,571,596 4,571,600 1,487,400

file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
2,478,245 2,478,245 3,035,850 3,035,900 987,750
7,054,905 7,054,905 8,642,259 8,642,300 2,811,800

2,613,600 2,613,600 3,201,660 3,201,700 1,041,700


3,630,000 3,630,000 4,446,750 4,446,800 1,446,800

6,500,000 6,500,000 7,962,500 7,962,500 (3,392,470)


3,500,000 3,500,000 4,287,500 4,287,500 (167,500)
133,595 133,595 163,654 163,700 53,300
87,120 87,120 106,722 106,800 34,800
39,325,000 39,325,000 48,173,125 48,173,200 15,673,200

13,200
8,925 9,000 500
2,100
4,800
4,800
3,800
32,900
19,200
13,100
69,300
92,700
37,500,000
31,250,000
15,625,000
8,750,000
6,875,000
6,250,000
5,625,000
4,375,000
4,062,500
3,750,000
519,300
129,700
519,300
324,500
55,700
52,000
463,600
540,800
850,000
385,900
463,600
772,300
193,200
224,200
240,000
21,000
124,800
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
10,500

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
KET.

30

file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN BAHAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

NO. J E N I S B A H A N MEREK SATUAN

1 2 3 4

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3
Pecah 5/7 m3
Pecah 3/5 m3
Tempel m2
Batu apung kg
2 KERIKIL Sawur / Koral m3
Beton 0,5 / 1 m3
Beton 1 / 1 m4
Beton 1 / 2 m3
Beton 2 / 3 m3
Biasa m3
3 BATU BATA Ex lokal I bh

4 PASIR Urug m3
Pasang m3
Beton (Muntilan) m3
Beton (Cepu) m3
Sirtu (pasir batu) m3
Sirtu royalty m3
Grosok m3
Abu batu m3
Abu batu (Tayu) m3
Batu alam m2
5 TANAH Padas m3
Liat m3
Biasa m3
Pilihan m3

6 KAPUR Pasang (padam) m3


Labor Kg
7 PORTLAND CEMENT
PC 50 kg zak
PC 40 kg zak
PC 50 kg Sm. Warna zak
Semen warna kg

7 BETON Adukan beton K 175 ready mix m3


Adukan beton K 225 ready mix m3
Adukan beton K 300 ready mix m3

8 TRAS (TANAH KAPUR) Tras m3

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak

2 GENTENG BETON Genteng Beton Warna standard bh


Kerpus Beton Warna Standard bh
3 GENTENG TANAH LIAT
Mantili bh
Nok kerpus Mantili bh
Plentong Mantili besar bh
Genteng biasa bh

file:///conversion/tmp/scratch/385673381.xlsx 94
1 2 3 4

Genteng pres bh
Genteng Beton bh
Genteng keramik bh
Sirap bh
Genteng kerpus jatiwangi bh
Genteng kerpus lokal bh
Genteng kerpus Beton bh
Genteng kerpus keramik bh
Genteng Jatiwangi bh
5 ASBES GELOMBANG
Asbes gelombang ( 80 x 210 ) cm bh
Asbes gel. Kecil 5 mm (90 x 180) lbr
Asbes gel. Kecil 5 mm (120 x 240) lbr
Asbes gel. Besar 5 mm (90 x 180) lbr
Asbes gel. Besar 5 mm (120 x 240) lbr
Asbes gel. Kecil 0,8 x 1,80 m lbr
Asbes gel. Kecil 0,8 x 2,40 m lbr

file:///conversion/tmp/scratch/385673381.xlsx 95
1 2 3 4

6 ASBES PLAT
- 100cm X 100 cm X 5 mm bh
- 100cm X 200 cm X 5 mm bh
- 100cm X 240 cm X 5 mm bh
Sekrup asbes bh

7 SENG PLAT
BJLS 0,30 panjang 180 cm m'
BJLS 0,30 panjang 240 cm m'
BWG 28 x 80 m'
BWG 28 x 90 m'
8 SENG GELOMBANG
Seng gel. Kecil 0,70 x 1,80 m lbr
Seng gel. Kecil 0,70 x 2,10 m lbr
BJLS 0,28 m'
BJLS 0,28 panjang 180 cm lbr
BJLS 0,28 panjang 240 cm lbr
9 SENG TALANG
Seng talang BJLS 26 lebar 0,60 m'
Seng talang BJLS 26 lebar 0,90 m'
Seng talang BJLS 26 lebar 1,20 m'

III . B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3

2 KAMPER Papan m3
Balok/pesagen m3

3 KRUING Papan m3
Balok/pesagen m3

4 MERANTI Papan m3
Balok/pesagen m3

5 LANAN Papan m3
Balok/pesagen m3

6 BENGKIRAI Papan m3
Balok/pesagen m3

7 DOLKEN Kayu dolken sengon Ø 8-10 cm,4m. bt


Kayu perancah m3
8 LAIN-LAIN
Kayu randu (papan) m3
Bambu bt
Bambu Apus bt
Kayu hutan lokal sekwalitas Kruing (A) m3
Kayu hutan lokal sekwalitas Kruing (B) m3
Glugu m'
Kayu lis 2/3 m'

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2
20 X 20 cm m2
20 X 20 cm Warna m2

2 KERAMIK
Keramik warna (KW-1) 30 X 30 cm m2
Keramik warna (KW-2) 30 X 30 cm m2
Keramik putih (KW-1) 30 X 30 cm m2

file:///conversion/tmp/scratch/385673381.xlsx 96
1 2 3 4

Keramik putih (KW-2) 30 X 30 cm m2


Keramik 10 x 20 cm m2
Keramik 20 x 20 cm m2
Keramik 20 x 25 cm m2
Keramik 10 x 20 cm m2
3 MARMER
Marmer Tulung Agung m2
Marmer Kalimantan m2
Marmer Itali m2

4 GRANITO
Granito 40 x 40 polished (lokal) m2
Granito 40 x 40 polished (import) m2
Granito 60 x 60 polished (lokal) m2
Granito 60 x 60 polished (import) m2

5 GRANIT
Granit lokal m2
Granit import m2
Batu Tempel m2
V.BAHAN CETAK
1 BUIS BETON O dan U
Ø 15 cm - 100 cm bh
Ø 20 cm - 100 cm bh
Ø 25 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 40 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh

VI . B A H A N B E S I
1 BESI BETON
Besi beton polos kg
Besi beton prestress kg
Besi beton ulir kg

2 BESI PLAT
Besi Strip kg

3 BAJA
Baja profil " L" dan "C" kg
Baja profil "IWF" kg

4 KAWAT
Kawat Ikat beton/bendrat kg
Kawat bronjong kg
Kawat las listrik kg

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 ø 1/2" m'
Pipa PVC. S. 12,5 ø 3/4" m'
Pipa PVC. S. 12,5 ø 1" m'
Pipa PVC. S. 12,5 ø 1-1/4" m'
Pipa PVC. S. 12,5 ø 1-1/2" m'
Pipa PVC. S. 12,5 ø 2" m'
Pipa PVC. S. 12,5 ø 2-1/2" m'

file:///conversion/tmp/scratch/385673381.xlsx 97
1 2 3 4

Pipa PVC. S. 12,5 ø 3" m'


Pipa PVC. S. 12,5 ø 4" m'
Pipa PVC. S. 12,5 ø 5" m'
Pipa PVC. S. 12,5 ø 6" m'
Pipa PVC. S. 12,5 ø 8" m'
Pipa PVC. S. 12,5 ø 10" m'
Pipa PVC. S. 12,5 ø 12" m'
Pipa PVC. S. 12,5 ø 16" m'
2 Pipa PVC AW
Pipa PVC. AW ø 1/2" m'
Pipa PVC. AW ø 3/4" m'
Pipa PVC. AW ø 1" m'
Pipa PVC. AW ø 1 1/2" m'
Pipa PVC. AW ø 2" m'
Pipa PVC. AW ø 3" m'
Pipa PVC. AW ø 4" m'
3 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" ) m'
Pipa Galvanis ( 1 1/2" ) m'
Pipa Galvanis ( 2" ) m'

VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240 X 4 mm lbr
- Tripleks
120 X 240 X 3 mm lbr
120 X 240 X 4 mm lbr
120 X 240 X 6 mm lbr
- Multipleks
. 120 X 240 X 9 mm lbr
. 120 X 240 X 12 mm lbr
Harplek 60 x 200 lbr
Harplek 50 x 200 lbr

file:///conversion/tmp/scratch/385673381.xlsx 98
1 2 3 4

Harplek 40 x 200 lbr


Harplek 30 x 200 lbr
Harplek 5 mm (90 x 180) lbr
Harplek 5 mm (120 x 240) lbr
Gypsum 6 mm lbr
Gypsum 9 mm lbr
Gypsum 12 mm lbr
Gypsum 20 mm lbr
Eternit 4 mm ( 100 x 100) m2
List Kayu Profil m'
Formika ukuran pintu lbr

XII . B A H A N F I N I S H I N G
1 KAYU
Menie kg
Plamur kayu kg
Ambril/amplas lbr
Cat kayu (cukup) kg
Cat kayu (baik) kg
Siralax kg
Spiritus ltr
Dempul kg
Plinkut kg
Wood filer (INFRA) kg
Oker putih kg
Oker warna kg
Melamin kg
Kuwas 3" bh
Thinner Super daimaru liter
Thinner A liter
Foxi Cat Kg
2 TEMBOK
Kapur sirih kg
Plamur kg
Cat Tembok dalam (cukup) kg
Cat Tembok dalam (baik) kg
Cat Tembok luar (cukup) kg
Cat Tembok luar (baik)
Roll cat bh

3 BESI
Menie kg
Cat besi (baik) kg
Cat besi (cukup) kg
Minyak cat ltr
Lem Aica Aibon kg
Amplas Besi lbr
Ampelas norton no.3 buah
Ampelas Dico no.280 buah
Ampelas Dico no.120 buah

XIII. B A H A N K A C A
Bening 5 mm m2
Rayband 5 mm m2

XIV. BAHAN INSTALASI LISTRIK


Stop Kontak bh

XV . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Besar bh
Kecil bh
2 ENGSEL DAN GERENDEL

file:///conversion/tmp/scratch/385673381.xlsx 99
1 2 3 4

Engsel H bh
Engsel Nylon bh
Grendel bh
Hak Angin bh

XVI. BAHAN SANITAIR


1 Kloset duduk Porselen bh
2 Kloset jongkok bh
3 Westafel Counter top bh
4 Bak Cuci Stainlist bh

file:///conversion/tmp/scratch/385673381.xlsx 100
1 2 3 4

XVII. ALAT PENGIKAT KAYU


1 Paku - ukuran 1" s/d 4" kg
2 Paku - payung kg
3 Paku - sekrup kg
4 Mur Baut 3/8 " buah
5 Lem kayu (fox) buah
6 Tali Ijuk kg
7 Lem kuning (aica aibon) kg

XVIII. POMPA AIR DAN TANGKI AIR


1 POMPA AIR LISTRIK
Mesin pompa 1 lt / dt buah
Mesin pompa 1-1/2 lt / dt buah
Tangki air fiber glass 3.000 lt 5mm buah
XIX . PAVING BLOCK
1 Paving Blok Holland t: 6 cm (ALDAS) m2
2 Paving Blok Holland t: 6 cm (lokal) m2
3 Paving Blok Holland t: 8 cm (ALDAS) m2
4 Paving Blok Holland t: 8 cm (lokal) m2
5 Paving blok warna 6 cm (lokal) m2
6 Paving blok warna 8 cm (lokal) m2
7 Kanstin 10/12,5 x 30 x 50 (ALDAS) bh
8 Paving Blok Hexagonal Kecil t: 6 cm, (ALDAS) m2
9 Paving Blok Hexagonal Kecil t: 8 cm, (ALDAS) m2
10 Kanstin 10 x 20 x 50 (ALDAS) bh
11 Kanstin 10/12,5 x 25 x 50 (ALDAS) bh
13 Paving Block Holland t: 6 cm K250 (NUSA JAYA) m2

XXIII. L A I N - L A I N
1 Alat bantu (harga rata-rata) lot
2 Aspal kg
3 Minyak aspal ltr
4 Bensin ltr
5 Solar liter
6 Minyak tanah ltr
7 Olie (minyak pelumas) liter
8 Stempet Kg
9 Gebalan rumput m2
10 Wiremesh MS m2
11 Kayu bakar m3
12 Pintu Ronsel Doble 200 x 200 x 300 buah
13 Pintu Ronsel Doble 150 x 150 x 300 buah
14 Pintu Ronsel Engkel 100 x 100 x 300 buah
15 Pintu Intake 100 x 100 x 300 buah
16 Pintu Intake 90 x 100 x 300 buah
17 Pintu Intake 80 x 80 x 300 buah
18 Pintu Intake 60 x 60 x 300 buah
19 Pintu Intake 50 x 50 x 300 buah
20 Pintu Intake 40 x 40 x 300 buah
21 Pintu Intake 30 x 40 x 300 buah
22 Nomenklatur Marmer ( 30 x 40 ) buah
23 Nomenklatur Marmer ( 15 x 20 ) buah
24 Pile Scale ( 20 x 100 ) buah
25 Pile Scale ( 12 x 100 ) buah
26 Lapisan kedap air kg
27 Nako lengkap daun
28 PAGAR BRC. Pagar BRC 90 A1 /lb
Pagar BRC 120 A1 /lb
Pagar BRC 150 A1 /lb
Pagar BRC 90 A2 /lb
Pagar BRC 120 A2 /lb
Pagar BRC 150 A2 /lb
Pipa Tiang BRC 90 - 2" unit

file:///conversion/tmp/scratch/385673381.xlsx 101
1 2 3 4

Pipa Tiang BRC 120 - 2" unit


Pipa Tiang BRC 150 - 2" unit
29 Minyak Beton & bekisting ltr
30 Allumunium sheet 0,3 mm (90 x 180) lbr
31 Shear Connector kg

Rembang, Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx 102
R HARGA SATUAN BAHAN
AAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011

HARGA (Rp)

126,100
95,700
137,900
208,550
91,900
18,400
27,500
261,250
238,400
248,950
246,850
28,450
425

61,950
144,800
309,430
171,950
106,600
79,700
119,500
116,950
211,200
90,100
33,650
55,000
49,950
68,750

196,000
2,750

65,625
54,500
91,200
11,250

897,850
952,875
994,250

116,600

258,950

2,750
9,075

1,000
2,900
1,200
1,200

file:///conversion/tmp/scratch/385673381.xlsx 103
5

1,000
4,400
11,100
6,300
10,550
3,200
9,075
19,350
3,850

45,850
53,850
80,850
88,200
105,950
47,750
61,950

file:///conversion/tmp/scratch/385673381.xlsx 104
5

19,050
52,800
67,750
1,450

54,850
71,225
42,075
47,200

54,700
63,150
81,200
53,900
68,000

23,450
33,450
50,850

15,312,500
15,312,500

8,881,300
8,881,300

6,125,000
6,125,000

3,281,300
3,281,300

3,281,300
3,281,300

8,779,200
8,779,200

35,700
2,062,500

602,600
17,050
4,200
4,855,125
2,589,400
206,250
6,500

31,050
23,900
28,750

48,750
44,450
39,850

file:///conversion/tmp/scratch/385673381.xlsx 105
5

38,400
55,650
48,200
52,900
43,700

607,450
1,019,425
1,381,100

462,825
505,000
461,000
481,250

131,300
241,800
67,375

39,050
55,000
58,550
68,750
87,800
108,050
128,600
195,250
294,000
54,000
42,450
52,250

11,100
18,550
15,200

16,200

18,500
19,400

17,850
18,550
33,000

4,500
7,100
11,275
14,600
22,800
34,100
49,700

file:///conversion/tmp/scratch/385673381.xlsx 106
5

72,600
105,500
175,100
227,600
354,700
557,400
875,700
1,513,600

5,800
6,900
8,600
16,000
23,500
43,500
65,000

119,300
162,050
303,700

98,550

55,800
72,300
91,950

135,200
202,850
18,200
15,750

file:///conversion/tmp/scratch/385673381.xlsx 107
5

9,200
11,700
29,975
110,000
73,500
82,500
55,825
59,675
25,200
7,600
252,500

22,450
21,150
3,550
44,400
56,100
77,800
11,900
20,350
25,200
34,450
24,900
25,200
76,350
7,600
30,100
23,700
36,550

900
19,250
20,000
25,700
21,400
25,700
18,600

16,100
54,000
50,300
16,050
53,100
6,150
6,700
3,750
3,750

96,250
106,600

7,900

154,800
66,800

file:///conversion/tmp/scratch/385673381.xlsx 108
5

5,950
7,150
10,450
19,500

584,450
123,750
501,950
261,250

file:///conversion/tmp/scratch/385673381.xlsx 109
5

16,750
26,000
22,800
4,950
18,300
13,700
53,100

2,651,350
4,639,150
6,797,175

59,500
36,750
102,100
46,000
51,800
55,000
22,250
76,700
103,300
11,100
18,150
71,250

13,750
9,500
2,200
4,500
4,500
10,000
20,000
20,050
13,700
72,600
97,100
41,250,000
37,500,000
17,187,500
9,625,000
7,562,500
6,875,000
6,187,500
4,812,500
4,468,750
4,125,000
543,950
135,850
543,950
339,900
58,300
54,450
485,650
566,500
890,450
404,250
485,650
809,050
193,200

file:///conversion/tmp/scratch/385673381.xlsx 110
5

224,200
240,000
22,000
130,680
11,000

Rembang, Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx 111
DAFTAR ANALISA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

I A PEKERJAAN PERSIAPAN

A.1 1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


1.2500 Btg Kayu Dolken diameter 8 - 10 / 400 cm
2.5000 Kg Portland Semen
1.2000 Lbr Seng Gelombang 3" - 5"
0.0050 m3 Pasir Pasang
0.0090 m3 Koral Beton
0.0720 m3 Kayu 5/7X4m Kayu Meranti
0.0600 Kg Paku Biasa 2" - 5"
0.4500 Kg Meni Besi

0.2000 OH Tukang Kayu


0.4000 OH Pekerja
0.0200 OH Kepala Tukang

A.2 1M' Pengukuran dan Pemasangan Bouwplank


0.0120 m3 Kayu 5/7x 4m Kayu Kruing
0.0200 Kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan 3/20 Kayu Kruing

0.1000 OH Tukang Kayu


0.1000 OH Pekerja
0.0100 OH Kepala Tukang

A.3 1M2 Pembuatan Kantor Sementara dg Lantai Plesteran


1.2500 Btg Kayu Dolken Ø 8 - 10 / 4 m
0.1800 m3 Kayu
0.8500 Kg Paku Biasa 2" - 5"
1.1000 Kg Besi Strip
35.0000 Kg Portland Sement
0.2500 m3 Pasir pasang
0.1500 m3 Koral Beton
30.0000 buah Batu bata Merah
0.2500 Lbr Seng Plat
2.0000 daun Jendela Naco
0.0800 m2 Kaca Polos
0.1500 buah Kunci Tanam
0.3000 buah Engsel
0.0600 Lbr Plywood 4 mm

2.0000 OH Tukang Kayu


1.0000 OH Tukang Batu
2.0000 OH Pekerja
0.3000 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 112
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

A.4 1M2 Pembuatan Gudang Semen dan Alat-alat


1.7000 Btg Kayu Dolken diameter 8 - 10 / 400 cm
0.2100 m3 Kayu
0.3000 Kg Paku Biasa 2" - 5"
10.5000 Kg Portland Semen
0.0300 m3 Pasir Beton (Cepu)
0.0500 m3 Koral Beton
1.5000 Lbr Seng Gelombang BJLS 32

2.0000 OH Tukang Kayu


1.0000 OH Pekerja
0.2000 OH Kepala Tukang

A.5 1M2 Membersihkan Lapangan dan Perataan


0.1000 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 113
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

A.6 1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm


1.0000 Btg Bambu diameter 6 - 8 / 600 cm
0.2500 Kg Tali Ijuk

0.1700 OH Tukang Kayu


0.2500 OH Pekerja
0.0020 OH Kepala Tukang

A.7 1M3 Bongkaran Beton Bertulang


6.6670 OH Pekerja

A.8 1M3 Bongkaran Dinding Tembok Bata Merah


6.6670 OH Pekerja

A.9 1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)


3.0000 Org Pekerja

A.10 1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipaka


2.0000 Org Pekerja

A.11 1M2 MEMBONGKAR PLESTERAN DINDING


0.1250 Org pekerja

A.12 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi


0.1000 Org pekerja

A.13 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)


0.5000 Org pekerja

A.14 1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak di


0.1500 Org Pekerja
0.0750 Org Tukang Kayu
0.0075 Org Kepala tukang kayu

A.15 1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipak


0.2000 Org Pekerja
0.1000 Org Tukang Kayu
0.0100 Org Kepala tukang kayu

A.16 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipa


4.0000 Org Pekerja
6.0000 Org Tukang Kayu
0.6000 Org Kepala tukang kayu

A.17 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lag


4.0000 Org Pekerja
3.0000 Org Tukang Kayu

A.18 1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)


0.1000 Org Pekerja
0.3000 Org Tukang Kayu

file:///conversion/tmp/scratch/385673381.xlsx 114
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0300 Org Kepala tukang kayu

A.19 1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)


0.1500 Org Pekerja

A.20 a
Biaya setiap jarak pengangkutan/langsiran 1 m3 Material = K : (
275.0000

A.21 a
Biaya setiap jarak pengangkutan / langsiran 1 zak semen = K : (
275.0000

file:///conversion/tmp/scratch/385673381.xlsx 115
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

II B PEKERJAAN TANAH

B.1 1M3 Galian Tanah Biasa Sedalam 1 m


0.400 OH Pekerja

B.2 1M3 Galian Tanah Keras Sedalam 1 m


1.000 OH Pekerja

B.3 1M3 Galian Tanah Cadas Sedalam 1 m


1.500 OH Pekerja

B.4 1M3 Galian Tanah Lumpur Sedalam 1 m


1.200 OH Pekerja

B.5 1M2 Pekerjaan Striping Setinggi 1 m


0.050 OH Pekerja

B.6 1M3 Membuang Tanah Sejauh 30 m'


0.330 OH Pekerja

Suppl. B 6 1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M


Keterangan :
a
MENGGUNAKAN RUMUS = K : ( L + 75 )
275

B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
B.8 1M3 Pemadatan Tanah
0.500 OH Pekerja

B.9 1M3 Urugan Pasir


1.200 m3 Pasir Urug

0.300 OH Pekerja

B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia)


0.300 OH Pekerja

B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


0.400 m3 Pasir Urug
0.135 m3 Kapur Padam
0.948 m3 Tanah Liat

0.800 OH Pekerja
0.400 OH Tukang Batu
0.040 OH Kepala Tukang

B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm


6.000 kg Ijuk

0.150 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 116
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

B.12 1M3 Urugan Sirtu


1.200 m3 Sirtu

0.250 OH Pekerja

B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter


0.526 OH Pekerja

B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA M


0.735 org Pekerja
0.050 lot Alat bantu

B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA M


0.944 org Pekerja
0.050 lot Alat bantu

B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA M


1.153 org Pekerja
0.050 lot Alat bantu

file:///conversion/tmp/scratch/385673381.xlsx 117
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

B.17 1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR


MAX KEDALAMAN 1 M' TENAGA MANUSIA
1.500 org Pekerja
0.250 lot Alat bantu

B.18 1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MA


0.625 org Pekerja
0.250 lot Alat bantu

B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0
0.005 unit Excavator 0,7 m3
0.704 liter Solar
0.018 liter Olie (minyak pelumas)
0.005 Kg Stempet
0.005 org Operator Alat Berat
0.005 org Pemb. Operator Alat Berat
0.005 org Pekerja

B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0
0.006 unit Excavator 0,7 m3
0.921 liter Solar
0.024 liter Olie (minyak pelumas)
0.006 Kg Stempet
0.006 org Operator Alat Berat
0.006 org Pemb. Operator Alat Berat
0.006 org Pekerja

B.21 MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.


0.0101 buah Dump Truck
0.2515 liter Solar
0.0101 liter Olie (minyak pelumas)
0.0050 Kg Stempet
0.0101 org Sopir
0.0101 org Pekerja

B.22 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUM


KURANG DARI 1,5 KM.
0.0137 buah Dump Truck
0.3430 liter Solar
0.0137 liter Olie
0.0069 Kg Stempet
0.0137 org Sopir
0.0137 org Pekerja

B.23 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUM


JARAK ANTARA 1,5 S/D 3 KM.
0.0229 buah Dump Truck
0.5717 liter Solar
0.0229 liter Olie
0.0114 Kg Stempet
0.0229 org Sopir
0.0229 org Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 118
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUM
JARAK ANTARA 3 S/D 5 KM.
0.0320 buah Dump Truck
0.8003 liter Solar
0.0320 liter Olie
0.0160 Kg Stempet
0.0320 org Sopir
0.0320 org Pekerja

B.25 1 M3 MERATAKAN TANAH


0.2500 org Pekerja
0.1250 lot Alat bantu

B.26 1 M3 PEK. URUGAN TANAH PILIHAN


1.2000 m3 Tanah pilihan
0.3000 org Pekerja
0.1000 lot Alat bantu

file:///conversion/tmp/scratch/385673381.xlsx 119
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

B.27 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL


0.2000 m3 Kapur padam
1.0000 m3 Tanah liat
1.0000 org Pekerja
0.5000 org Tukang batu
0.0500 org Kepala tukang batu

B.28 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS


1.0000 m3 Pasir pasang
0.2000 m3 Kapur padam
1.0000 org Pekerja
0.5000 org Tukang batu
0.0500 org Kepala tukang batu

B.29 1 M3 MERATAKAN TANAH DAN DITIMBRIS


0.2500 org Pekerja
0.0100 org Mandor
0.1250 lot Alat bantu

B.30 1 M2 MENGAMBIL DAN PASANGAN GEBALAN


0.1500 org Pekerja
0.0125 lot Alat bantu

B.31 1 M' MENGANGKUT GEBALAN RUMPUT


0.0500 org Pekerja
0.0125 lot Alat bantu

B.32 1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH


1.2000 m2 Gembalan rumput biasa
0.2000 org Pekerja
0.0125 lot Alat bantu

B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M
0.6000 m3 Pekerjaan galian (10 org) 50 % (Analis B1)
0.6000 m3 Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
5.0000 m3 Pek. Grading plant (10) 50 % (5 x Analis B5)
1.2000 m3 Beli tanah biasa + angkut max 10 km

III C PEKERJAAN PONDASI

C.1 1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps


1.200 m3 Batu Belah 15/20
202.000 Kg Portland Sement
0.485 m3 Pasir Pasang

1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang

C.1a 1 M3 PASANGAN BATU BELAH 1 : 4


1.1000 m3 Batu Belah 15/20
163.0000 zak PC (50 kg)
0.5200 m3 Pasir pasang

file:///conversion/tmp/scratch/385673381.xlsx 120
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1.5000 org Pekerja
0.6000 org Tukang batu
0.0600 org Kepala tukang batu

C.2 1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps


1.200 m3 Batu Belah 15/20
136.000 Kg Portland Sement
0.544 m3 Pasir Pasang

1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 121
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

C.3 1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps


1.200 m3 Batu Belah 15/20
61.000 kg Portland Sement
0.147 m3 Kapur Pasang
0.492 m3 Pasir Pasang

. 1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang

C.4 1M3 Pasang Pondasi Batu Kosong


1.200 m3 Batu Belah 15/20
0.432 m3 Pasir Urug

. 0.700 OH Pekerja
0.390 OH Tukang Batu
0.039 OH Kepala Tukang

C.5 1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
0.480 m3 Batu Belah 15/20
126.000 Kg Besi Beton
194.000 Kg Portland Semen
0.312 m3 Pasir Beton (Cepu)
0.468 m3 Koral Beton
1.800 Kg Kawat Beton

3.000 OH Pekerja
0.850 OH Tukang Batu
0.085 OH Kepala Tukang

C.6 1M3 Pasang Pondasi Sumuran diameter 100 cm


0.450 m3 Batu Belah 15/20 cm
194.000 Kg Portland Semen
0.312 m3 Pasir Pasang
0.468 m3 Koral Beton

2.380 OH Pekerja
0.300 OH Tukang Batu
0.030 OH Kepala Tukang

C.7 1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang


0.019 m3 Pasir Urug Darat
0.094 m3 Pasir Beton (Cepu)
0.150 m3 Koral Beton
60.500 Kg Portland Semen
45.000 Kg Besi Beton
0.900 Kg Kawat beton
0.032 m3 Kayu Kaso 5/7
0.120 Kg Paku
0.090 Lt Minyak Bekisting
0.240 Kg Plamuur Tembok

1.000 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 122
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.670 OH Tukang Batu
0.067 OH Kepala Tukang

C.8 SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTA


0.1250 org Tukang Kayu
0.0125 org Kepala Tukang
0.1500 org Pekerja
0.0100 lot alat bantu

C.9 1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK


0.0400 org Tukang Kayu
0.0040 org Kepala Tukang
1.8000 org Pekerja
0.0100 lot alat bantu

file:///conversion/tmp/scratch/385673381.xlsx 123
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

C.10 1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA


0.0500 org Tukang Kayu
0.0050 org Kepala Tukang
2.2500 org Pekerja
0.0125 lot alat bantu

C.11 1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS


0.0600 org Tukang Kayu
0.0060 org Kepala Tukang
2.7000 org Pekerja
0.0150 lot alat bantu

C.12 1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR


0.0800 org Tukang Kayu
0.0080 org Kepala Tukang
3.6000 org Pekerja
0.0200 lot Alat bantu

C.13 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM


1.2000 m3 Batu kali
8.3333 kg Kawat bronjong
0.6667 org Penganyam
2.0333 org Pekerja

C.14 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM


1.2000 m3 Batu kali
15.0000 kg Kawat bronjong
0.7333 org Penganyam
2.1000 org Pekerja

C.15 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM


1.2000 m3 Batu kali
23.3333 kg Kawat bronjong
0.8333 org Penganyam
2.1667 org Pekerja

IV D P E K E R JAAN DINDING

D.1 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps


70.0000 Buah Bata Merah 5 x 11 x 22
18.9500 Kg Portland Semen
0.0380 m3 Pasir Pasang

0.3000 OH Pekerja
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang

D.2 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps


70.0000 Buah Bata Merah 5 x 11 x 22
14.3700 Kg Portland Semen
0.0400 m3 Pasir Pasang

0.3000 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 124
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang

D.3 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


70.0000 Buah Bata Merah 5 x 11 x 22
4.5000 Kg Portland Semen
0.0500 m3 Pasir Pasang
0.0150 m3 Kapur Padam

0.3000 OH Pekerja
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 125
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

D.4 1 M2 PASANGAN 1/2 BATA MERAH 1 : 4


70.0000 bh Bata merah
11.5000 kg P C (50 kg)
0.0430 m3 Pasir pasang
0.3200 org Pekerja
0.1000 org Tukang batu
0.0100 org Kepala tukang batu

D.5 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5


70.0000 bh Bata merah
9.6800 kg P C (50 kg)
0.0450 m3 Pasir pasang
0.3200 org Pekerja
0.1000 org Tukang batu
0.0100 org Kepala tukang batu

D.6 1 M2 PASANGAN BATU TEMPEL + SIARAN


1.1000 m2 Batu tempel
0.1200 zak PC (50 kg)
0.0310 m3 Pasir pasang
0.1875 org Pekerja
0.2250 org Tukang batu
0.3750 org Kepala tukang batu
0.0250 lot Peralatan

D.7 1 M3 PASANGAN BATA MERAH 1 PC : 2 PS


500.0000 bh Bata merah
4.1176 zak P C (50 kg)
0.3330 m3 Pasir pasang
4.5000 org Pekerja
1.5000 org Tukang batu
0.1500 org Kepala tukang batu

D.8 1 M3 PASANGAN BATA MERAH 1 PC : 4 PS


500.0000 bh Bata merah
2.5328 zak P C (50 kg)
0.4060 m3 Pasir pasang
4.5000 org Pekerja
1.5000 org Tukang batu
0.1500 org Kepala tukang batu

D.9 1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS


500.0000 bh Bata merah
0.9384 zak P C (50 kg)
0.1100 m3 Kapur pasang
0.3680 m3 Pasir pasang
4.5000 org Pekerja
1.5000 org Tukang batu
0.1500 org Kepala tukang batu

V E PEKERJAAN PLESTERAN

E.1 1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm

file:///conversion/tmp/scratch/385673381.xlsx 126
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
7.7600 Kg Portland Semen
0.0230 m3 Pasir Pasang

0.2000 OH Pekerja
0.1500 OH Tukang batu
0.0015 OH Kepala Tukang

E.2 1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm


3.0000 Kg Portland Semen
0.0050 m3 Kapur Padam
0.0200 m3 Pasir Pasang

0.2200 OH Pekerja
0.1200 OH Tukang batu
0.0120 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 127
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

E.3 1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm


1.8400 Kg Portland Semen
0.0060 m3 Kapur Padam
0.0140 m3 Pasir Pasang

0.2000 OH Pekerja
0.1500 OH Tukang batu
0.0015 OH Kepala Tukang

E.4 1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm


10.3680 Kg Portland Semen
0.0310 m3 Pasir Pasang

0.2600 OH Pekerja
0.2000 OH Tukang batu
0.0200 OH Kepala Tukang

E.5 1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm


5.1840 Kg Portland Semen
0.0260 m3 Pasir Pasang

0.1500 OH Pekerja
0.0700 OH Tukang batu
0.0070 OH Kepala Tukang

E.6 1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm


0.0570 OH Pekerja
0.0380 OH Tukang batu
0.0380 OH Kepala Tukang

E.7 1M2 Plesteran Ciprat 1 Pc : 2 Ps


4.3200 Kg Portland Semen
0.0060 m3 Pasir Pasang

0.2500 OH Pekerja
0.1000 OH Tukang batu
0.0100 OH Kepala Tukang

E.8 1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps


6.3400 Kg Portland Semen
0.0120 m3 Pasir Pasang

0.3000 OH Pekerja
0.1400 OH Tukang batu
0.0140 OH Kepala Tukang

E.9 1M2 Acian


3.2500 Kg Portland Semen

0.1500 OH Pekerja
0.1000 OH Tukang batu

file:///conversion/tmp/scratch/385673381.xlsx 128
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0100 OH Kepala Tukang

VI F PEKERJAAN K A Y U
F.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I
1.1000 m3 Kayu Klas I (Jati) , Balok
1.2500 Kg Paku Biasa 2" - 5 "
1.0000 Kg Lem Kayu

6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang

F.2 1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai


1.1000 m3 Kayu Bengkirai, Balok
1.2500 Kg Paku Biasa 2" - 5 "
1.0000 Kg Lem Kayu

6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang

F.3 1M2 Membuat Pintu Klamp Standard Kayu Bengkirai


0.0400 m3 Kayu Bengkirai, papan
0.0500 Kg Paku Biasa 2" - 5 "

0.3500 OH Pekerja
1.0500 OH Tukang Kayu
0.1050 OH Kepala Tukang

F.4 1M2 Membuat Daun Pintu Panel Kayu Bengkirai


0.0400 m3 Kayu Bengkirai, papan
0.0500 kg Lem Kayu

1.0000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang

F.5 1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai


0.0350 m3 Kayu Bengkirai, papan
0.3000 kg Lem Kayu

0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)
0.0640 m3 Kayu Kelas I (Jati), papan
0.5000 kg Lem Kayu

1.0000 OH Pekerja
3.0000 OH Tukang Kayu
0.3000 OH Kepala Tukang

F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d

file:///conversion/tmp/scratch/385673381.xlsx 129
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0250 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood tebal 4 mm

0.6000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai
0.0256 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood tebal 4 mm uk.90x220cm

0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

F.9 1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)


0.0600 m3 Kayu Kelas I (Jati), papan
0.1500 Kg Paku Biasa 1/2" - 1"

0.5000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

F.10 1M2 Membuat Jalusi mati Kosen Kayu Bengkirai


0.0600 m3 Kayu Bengkirai, papan
0.1500 Kg Paku Biasa 1/2" - 1"

0.5000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 130
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)
0.0250 m3 Kayu Kelas I (Jati), papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.3000 Kg Lem Kayu
1.0000 Lbr Teakwood tebal 4 mm

0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang

F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspo
Kayu Bengkirai
0.0250 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.0800 Kg Lem Kayu
1.0000 Lbr Teakwood tebal 4 mm
0.5000 Lbr Formika

0.8000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang

F.13 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM


0.0150 m3 Rangka kayu bengkirai (ram pintu)
1.0000 lbr Triplek 4 mm
1.2000 m2 Aluminium sheet 0,3 mm
0.2000 kg Paku triplek
0.5000 kg Lem putih ( FOX )

0.3000 org Pekerja


1.3000 org Tukang kayu
0.1300 org Kepala tukang kayu

F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/W
0.0150 m3 Rangka kayu bengkirai (ram pintu)
1.0000 lbr Triplek 4 mm ukuran pintu
0.5000 lbr Formika
0.2000 kg Paku triplek
0.5000 kg Lem putih ( FOX )
0.2000 kg Lem kuning ( aica aibon )

0.5000 org Pekerja


1.3000 org Tukang kayu
0.1300 org Kepala tukang kayu

F.15 1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M
1.1000 m3 Kayu Bengkirai, balok
15.0000 Kg Besi Strip
0.8000 Kg Paku Biasa 2" - 5"

4.0000 OH Pekerja
12.0000 OH Tukang Kayu
1.2000 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 131
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

F.16 1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati


1.1000 m3 Kayu Jati, balok
15.0000 Kg Besi Strip
5.6000 Kg Paku Biasa 2" - 5"

6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang

F.17 1M3 Memasang Konstruksi Gording Kayu Bengkirai


1.1000 m3 Kayu Bengkirai, balok
15.0000 Kg Besi Strip
3.0000 Kg Paku Biasa 2" - 5"

2.4000 OH Pekerja
7.2000 OH Tukang Kayu
0.7200 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 132
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai
0.0196 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.3000 Kg Lem Kayu
0.5000 Lbr Plywood tebal 4 mm
1.0000 Lbr Formika

0.8000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang

F.19 1M2 Pasang Pintu Formika Double, Rangka Kayu Jati


0.0196 m3 Kayu Jati, papan
0.0300 Kg Paku Biasa 1/2" - 1"
1.2000 Kg Lem Kayu
1.0000 Lbr Plywood tebal 4 mm
1.0000 Lbr Formika

1.0000 OH Pekerja
2.6000 OH Tukang Kayu
0.2600 OH Kepala Tukang

F.20 1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai


0.0086 m3 Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.2500 Kg Paku Biasa 2" - 5"

0.1000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang

F.21 1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai


0.0086 m3 Kayu Bengkirai Kaso-kaso (5x7) cm
0.0043 m3 Reng (2x3) cm
0.2500 Kg Paku Biasa 2" - 5"

0.1000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang

F.22 1M2 Pasang Rangka Atap Sirap Kayu Bengkirai


0.1650 m3 Kayu Bengkirai, balok
0.2000 Kg Paku Biasa 2" - 5"

0.1200 OH Pekerja
0.1200 OH Tukang Kayu
0.0120 OH Kepala Tukang

F.23 1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai


0.0072 m3 Kayu Bengkirai, papan
0.1000 Kg Paku Biasa 2" - 5"

file:///conversion/tmp/scratch/385673381.xlsx 133
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1000 OH Pekerja
0.2000 OH Tukang Kayu
0.0250 OH Kepala Tukang

F.24 1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai


0.0110 m3 Kayu Bengkirai, papan
0.0500 Kg Paku Biasa 2" - 5"

0.1000 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang

F.25 1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai


0.0145 m3 Kayu Bengkirai, papan
0.1500 Kg Paku Biasa 2" - 5"

0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

F.26 1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai


0.0280 m3 Kayu Bengkirai, balok
0.1500 Kg Paku Biasa 2" - 5"

0.1500 OH Pekerja
0.4500 OH Tukang Kayu
0.0450 OH Kepala Tukang

F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkira
0.0280 m3 Kayu Bengkirai, balok
0.1500 Kg Paku Biasa 2" - 5"
0.8600 Lbr Teakwood tebal 4mm
0.5600 Kg Lem kayu

0.1500 OH Pekerja
0.4500 OH Tukang Kayu
0.0450 OH Kepala Tukang

F.28 1M2 Pasang Dinding Lambriziring dari Papan jati


0.0070 m3 Kayu Jati, balok
0.1000 Kg Paku Biasa 2" - 5"
0.1500 Kg Paku Sekrup 3,5"

0.6000 OH Pekerja
1.8000 OH Tukang Kayu
0.1800 OH Kepala Tukang

F.29 1M2 Pasang Plywood tebal 4mm unt Dinding


0.4000 Lbr Plywood tebal 4mm
0.5000 Kg Paku Biasa 1/2" - 1"

0.0250 OH Pekerja
0.0750 OH Tukang Kayu

file:///conversion/tmp/scratch/385673381.xlsx 134
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0075 OH Kepala Tukang

F.30 1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV


1.5000 m2 Bilik Bambu
0.0140 m3 Kayu Klas III (Meranti)
0.0500 Kg Paku Biasa 1/2" - 1"
0.0030 m' List Kayu 2/4

0.1000 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang

VII G PEKERJAAN PERKERASAN DAN BETON

G.1 1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,
247.0000 Kg Portland Semen
0.6207 m3 Pasir Beton (Cepu)
0.7400 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang

G.2 1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,
276.0000 Kg Portland Semen
0.5914 m3 Pasir Beton (Cepu)
0.7496 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang

G.3 1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0
299.0000 Kg Portland Semen
0.5707 m3 Pasir Beton (Cepu)
0.7533 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang

G.4 1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c =
230.0000 Kg Portland Semen
0.6379 m3 Pasir Beton (Cepu)
0.7607 m3 Kerikil (maksimum 30 mm)

1.2000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang

G.5 1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c =
326.0000 Kg Portland Semen
0.5429 m3 Pasir Beton (Cepu)
0.7622 m3 Kerikil (maksimum 30 mm)

file:///conversion/tmp/scratch/385673381.xlsx 135
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.6 1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0
352.0000 Kg Portland Semen
0.5221 m3 Pasir Beton (Cepu)
0.7637 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.7 1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c =
371.0000 Kg Portland Semen
0.4986 m3 Pasir Beton (Cepu)
0.7756 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.8 1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0
384.0000 Kg Portland Semen
0.4943 m3 Beton (Muntilan)
0.7696 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.9 1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c
406.0000 Kg Portland Semen
0.4886 m3 Beton (Muntilan)
0.7600 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.10 1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0
413.0000 Kg Portland Semen
0.4864 m3 Beton (Muntilan)
0.7563 m3 Kerikil (maksimum 30 mm)

1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang

G.11 1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0
439.0000 Kg Portland Semen
0.4786 m3 Beton (Muntilan)
0.7452 m3 Kerikil (maksimum 30 mm)

2.1000 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 136
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 137
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.12 1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c =
448.0000 Kg Portland Semen
0.4764 m3 Beton (Muntilan)
0.7407 m3 Kerikil (maksimum 30 mm)

2.1000 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

G.13 1KG Pembesian dg Besi Polos


1.0500 Kg Besi Beton (polos)
0.0150 Kg Kawat Beton

0.0070 OH Pekerja
0.0070 OH Tukang Besi
0.0007 OH Kepala Tukang

G.13a 110 KG Besi Beton Terpasang (polos) ax


G.13b 125 KG Besi Beton Terpasang (polos) ax

G.14 1KG Kabel Presstresed Polos/strand


1.0500 Kg Besi presstred polos
0.0100 Kg Kawat Beton

0.0050 OH Pekerja
0.0050 OH Tukang Besi
0.0005 OH Kepala Tukang

G.15 1M2 Pasang Bekisting untuk Pondasi


0.0400 m3 Kayu Terentang (perancah)
0.3000 Kg Paku Biasa 2" - 5"
0.1000 Ltr Minyak Bekisting

0.5200 OH Pekerja
0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang

G.15a 1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan P
0.3996 m3 Kayu Perancah
0.4000 Kg Paku biasa 2" - 5"

0.3000 OH Pekerja
0.5000 OH Tukang Kayu
0.0500 OH Kepala Tukang

G.16 1M2 Pasang Bekisting untuk Sloof


0.0450 m3 Kayu Terentang
0.3000 Kg Paku Biasa 2" - 5"
0.1000 Ltr Minyak Bekisting

0.5200 OH Pekerja
0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 138
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.17 1M2 Pasang Bekisting untuk Kolom


0.0400 m3 Kayu Terentang
0.4000 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
0.0150 m3 Balok Kayu
0.3500 Lbr Plywood tebal 9mm
2.0000 Btg Dolken diameter 8 - 10 cm / 4 m

0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 139
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.18 1M2 Pasang Bekisting untuk Balok


0.0400 m3 Kayu Terentang
0.4000 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
0.0180 m3 Balok Kayu
0.3500 Lbr Plywood tebal 9mm
2.0000 Btg Dolken diameter 8 - 10 cm / 4 m

0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang

G.19 1M2 Pasang Bekisting untuk Lantai


0.0400 m3 Kayu Terentang
0.4000 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
0.0150 m3 Balok Kayu Borneo
0.3500 Lbr Plywood tebal 9mm
6.0000 Btg Dolken diameter 8 - 10 cm / 4 m

0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang

G.20 1M2 Pasang Bekisting untuk Dinding


0.0300 m3 Kayu Terentang
0.4000 Kg Paku Biasa 2" - 5"
0.2000 Ltr Minyak Bekisting
0.0200 m3 Balok Kayu
0.3500 Lbr Plywood tebal 9mm
3.0000 Btg Dolken diameter 8 - 10 cm / 4 m
4.0000 Buah Formite/Penjaga jarak / Spacer (alat bantu)

0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang

G.21 1M2 Pasang Bekisting untuk Tangga


0.0300 m3 Kayu Terentang
0.4000 Kg Paku Biasa 2" - 5"
0.1500 Ltr Minyak Bekisting
0.0150 m3 Balok Kayu
0.3500 Lbr Plywood tebal 9mm
2.0000 Btg Dolken diameter 8 - 10 cm / 4 m

0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang

G.22 1 M2 Pasang Bekisting Jembatan Cor


0.0264 m3 Kayu Terentang
0.6000 Kg Paku Biasa 2" - 5"
0.5000 Btg Dolken Kayu Galam diameter 8 - 10 / 4 m

file:///conversion/tmp/scratch/385673381.xlsx 140
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1500 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang

G.23 1 M2 BEKESTING DENGAN PAPAN


0.0170 m3 Kaso lanan 5/7 (2x pakai) 50 %
0.0240 m3 Papan terentang (2x pakai) 75 %
0.4000 kg Paku

0.3000 org Pekerja


0.1500 org Tukang kayu
0.1500 org Kepala tukang kayu

G.24 1 M2 BEKESTING DENGAN MULTIPLEX 9 MM


0.0170 m3 Kaso lanan 5/7 (2x pakai) 50 %
0.3470 lbr Multiplex 9 mm (2x pakai) 75 %
0.4000 kg Paku
0.1200 org Pekerja
0.1500 org Tukang kayu
0.1500 org Kepala tukang kayu

file:///conversion/tmp/scratch/385673381.xlsx 141
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.25 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)


0.2000 m3 Kayu Terentang
1.5000 Kg Paku Biasa 2" - 5"
0.4000 Ltr Minyak Bekisting
157.5000 Kg Besi Beton Polos
2.2500 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton

5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2620 OH Kepala Tukang

G.26 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


0.2700 m3 Kayu Terentang
2.0000 Kg Paku Biasa 2" - 5"
0.6000 Ltr Minyak Bekisting
210.0000 Kg Besi Beton Polos
3.0000 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton

5.6500 OH Pekerja
0.2750 OH Tukang batu
1.5600 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3230 OH Kepala Tukang

G.27 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


0.4000 m3 Kayu Terentang
4.0000 Kg Paku Biasa 2" - 5"
2.0000 Ltr Minyak Bekisting
315.0000 Kg Besi Beton Polos
4.5000 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1500 m3 Kayu Balok
3.5000 Lbr Plywood 9 mm
20.0000 Btg Dolken diameter 8 / 4mm

7.0500 OH Pekerja
0.2750 OH Tukang batu
1.6500 OH Tukang Kayu
2.1000 OH Tukang Besi
0.4030 OH Kepala Tukang

G.28 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


0.3200 m3 Kayu Terentang

file:///conversion/tmp/scratch/385673381.xlsx 142
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
3.2000 Kg Paku Biasa 2" - 5"
1.6000 Ltr Minyak Bekisting
210.0000 Kg Besi Beton Polos
3.0000 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1400 m3 Kayu Balok
2.8000 Lbr Plywood 9 mm
18.0000 Btg Dolken diameter 8 / 4mm

6.3500 OH Pekerja
0.2750 OH Tukang batu
1.6500 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3330 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 143
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.29 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


0.3200 m3 Kayu Terentang
3.2000 Kg Paku Biasa 2" - 5"
1.6000 Ltr Minyak Bekisting
157.5000 Kg Besi Beton Polos
2.2500 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1200 m3 Kayu Balok
2.8000 Lbr Plywood 9 mm
32.0000 Btg Dolken diameter 8 / 4mm

5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2650 OH Kepala Tukang

G.30 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


0.2400 m3 Kayu Terentang
3.2000 Kg Paku Biasa 2" - 5"
1.6000 Ltr Minyak Bekisting
157.5000 Kg Besi Beton Polos
2.2500 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1600 m3 Kayu Balok
2.8000 Lbr Plywood 9 mm
24.0000 Btg Dolken diameter 8 / 4mm

5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2620 OH Kepala Tukang

G.31 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


0.2500 m3 Kayu Terentang
3.0000 Kg Paku Biasa 2" - 5"
1.2000 Ltr Minyak Bekisting
210.0000 Kg Besi Beton Polos
3.0000 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1050 m3 Kayu Balok
2.5000 Lbr Plywood 9 mm
14.0000 Btg Dolken diameter 8 / 4mm

5.6500 OH Pekerja
0.2750 OH Tukang batu

file:///conversion/tmp/scratch/385673381.xlsx 144
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1.5600 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3230 OH Kepala Tukang

G.32 1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


0.0020 m3 Kayu Terentang
0.0100 Kg Paku Biasa 2" - 5"
3.0000 Kg Besi Beton Polos
0.4500 Kg Kawat Beton
4.0000 Kg Portland Semen
0.0060 Kg Pasir Beton (Cepu)
0.0090 m3 Koral Beton

0.1800 OH Pekerja
0.0200 OH Tukang batu
0.0200 OH Tukang Kayu
0.0200 OH Tukang Besi
0.0060 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 145
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.33 1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm


0.0030 m3 Kayu albasia
0.0200 Kg Paku Biasa 2" - 5"
3.6000 Kg Besi Beton Polos
0.0500 Kg Kawat Beton
5.5000 Kg Portland Semen
0.0090 Kg Pasir Beton (Cepu)
0.0150 m3 Koral Beton

0.2970 OH Pekerja
0.0330 OH Tukang batu
0.0330 OH Tukang Kayu
0.0330 OH Tukang Besi
0.0100 OH Kepala Tukang

G.34 1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG


1.0000 m3 Adukan K-175 Ready Mix
2.5000 org Pekerja
0.2500 org Tukang batu
0.1000 org Kepala tukang batu
0.0450 lot Alat bantu (Slang + Tes Lab.)

G.35 1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG


1.0000 m3 Adukan K-225 Ready Mix
2.5000 org Pekerja
0.2500 org Tukang batu
0.1000 org Kepala tukang batu
0.0450 lot Alat bantu (Slang + Tes Lab.)

G.36 1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG


1.0000 m3 Adukan K-300 Ready Mix
2.5000 org Pekerja
0.2500 org Tukang batu
0.1000 org Kepala tukang batu
0.0450 lot Alat bantu (Slang + Tes Lab.)

G.37 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI


0.0010 org Pekerja
0.0010 org Tukang besi profil
0.0002 org Kepala tukang besi profil
0.0002 org Operator alat berat
0.0200 org Pembantu operator
0.0002 ls Sewa alat
0.0100 lt Bahan Bakar solar
0.0010 lt Pelumas
0.0002 lot Alat bantu

G.38 1 KG PEKERJAAN BAJA IWF


1.1000 kg Besi IWF
0.0600 org Pekerja
0.0300 org Tukang besi profil
0.0150 org Kepala tukang besi profil

file:///conversion/tmp/scratch/385673381.xlsx 146
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1250 lot Peralatan (oksigen,solar,elpiji,kawat las)

G.39 1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL


1.1000 kg Besi profil/besi siku
0.0600 org Pekerja
0.0300 org Tukang besi profil
0.0150 org Kepala tukang besi profil
0.1250 lot Peralatan (oksigen,solar,elpiji,kawat las)

G.40 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM


0.0400 kg Kawat las listrik
0.0300 lt Bahan bakar solar
0.0040 lt Pelumas
0.0100 org Pekerja
0.0050 org Tukang besi profil
0.0050 org Kepala tukang besi profil
0.2500 lot Alat bantu (mesin las listrik)

file:///conversion/tmp/scratch/385673381.xlsx 147
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

G.41 1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR


0.0500 org Pekerja
0.0200 org Tukang besi profil
0.0030 org Kepala tukang besi profil
0.2500 lot Alat bantu (mesin bor listrik)

G.42 1 M2 PEKERJAAN WIREMESH M8


1.0100 m2 Wiremesh M8
0.1000 kg Kawat las listrik
0.1000 org Pekerja
0.0750 org Tukang besi profil

VIII H PEKERJAAN PENUTUP ATAP

H.1 1 M2 Pasang Atap Genteng Mantili Kecil


25.0000 Buah Genteng mantili

0.1500 OH Pekerja
0.0750 OH Tukang Kayu
0.0080 OH Kepala Tukang

H.2 1 M2 Pasang Atap Genteng Mantili Besar


20.0000 Buah Genteng Mantili Besar

0.1500 OH Pekerja
0.0600 OH Tukang Kayu
0.0060 OH Kepala Tukang

H.3 1 M' Pasang Genteng Bubung Mantili


5.0000 Buah Genteng Bubung Mantili
8.0000 Kg Portland Semen
0.0320 m3 Pasir Pasang

0.4000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang

H.4 1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm


0.6000 Lbr Asbes Gelombang
0.1200 Kg Paku Pancing 60 x 230

0.1400 OH Pekerja
0.0750 OH Tukang Kayu
0.0080 OH Kepala Tukang

H.5 1 M2 Pasang Atap Genteng Beton


11.0000 bh Genteng Beton Standard
0.0300 Kg Paku Biasa 2" - 5"

0.2000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 148
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
H.6 1 M2 Pasang Atap Sirap
60.0000 Lbr Genteng Sirap
0.2000 Kg Paku Biasa 1/2" - 1"

0.1660 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

H.7 1 M' Pasang Nok Genteng Beton


3.5000 Buah Nok Genteng Beton
0.0500 Kg Paku Biasa 2" - 5"
10.8000 Kg Portland Semen
0.0320 m3 Pasir Pasang

0.4000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 149
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

H.8 1 M' Pasang Nok Sirap


0.4000 Lbr Seng Plaat 3" x 6" BJLS 28
0.0600 Kg Paku Biasa 1/2" - 1"
0.5000 Kg Paku Biasa 2" - 5"
0.0040 m3 Kayu Bengkirai Papan Tebal 3 cm

0.1250 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

H.9 1 M2 Pasang Atap Seng Gelombang


0.7000 Lbr Seng Gelombang 3" x 6" BJLS 28
0.0200 Kg Paku Biasa 1/2" - 1"

0.1200 OH Pekerja
0.0600 OH Tukang Kayu
0.0060 OH Kepala Tukang

H.10 1 M' Pasang Atap Nok Seng


0.3000 Lbr Seng Plaat 3" x 6" BJLS 28
0.0400 Kg Paku Biasa 1/2" - 1"

0.1500 OH Pekerja
0.0700 OH Tukang Kayu
0.0080 OH Kepala Tukang

IX I PEKERJAAN LANGIT - LANGIT

I.1 1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


1.1000 Lbr Plat Asbes tebal 5 mm
0.0100 Kg Paku

0.0300 OH Pekerja
0.0700 OH Tukang Kayu
0.0070 OH Kepala Tukang

I.2 1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,


Tebal 3 mm, 4 mm & 6 mm
0.3750 Lbr Tripleks (4 mm)
0.0300 Kg Paku Tripleks

0.0700 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang

I.3 1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


0.0150 m3 Kayu Jati,Papan
0.0100 Kg Paku

0.6000 OH Pekerja
0.8000 OH Tukang Kayu
0.0800 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 150
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mm
0.3640 Lbr Gypsum Board
0.1100 Kg Paku Sekrup

0.1000 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang

I.5 1 M' List Langit-Langit Kayu Profil


1.0500 m1 List Kayu Profil
0.0100 Kg Paku

0.0500 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 151
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

I.6 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai


0.0154 m3 Kayu Bengkirai, balok
0.2000 Kg Paku Biasa 2" - 5"

0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

I.6a 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing


0.0084 m3 Kayu Kruing, balok
0.2000 Kg Paku Biasa 2" - 5"

0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

I.7 1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai


0.0163 m3 Kayu Bengkirai, balok
0.2500 Kg Paku Biasa 2" - 5"

0.2000 OH Pekerja
0.3000 OH Tukang Kayu
0.0300 OH Kepala Tukang

X J PEKERJAAN SANITASI, JALAN, SALURAN DAN BOX CULVERT


J.1 1 UNIT Memasang Closet Duduk Porselin
1.0000 Buah Kloset Duduk

3.3000 OH Pekerja
1.1000 OH Tukang Batu
0.0010 OH Kepala Tukang

J.2 1 UNIT Memasang Closet Jongkok


1.0000 Buah Kloset Jongkok
6.0000 Kg Portland Semen
0.0100 m3 Pasir Pasang

1.0000 OH Pekerja
1.5000 OH Tukang Batu
1.5000 OH Kepala Tukang

J.3 1 UNIT Memasang Wastafel


1.0000 Buah Wastafel
0.3000 - Perlengkapan 30% Harga Wastafel
6.0000 Kg Portland Semen
0.0100 m3 Pasir Pasang

1.2000 OH Pekerja
0.1450 OH Tukang Batu
0.1500 OH Kepala Tukang

J.4 1 M' Memasang Pipa Beton, Ø 15 cm - 20 cm


1.1000 Buah Pipa Beton
0.0270 m3 Batu Bata

file:///conversion/tmp/scratch/385673381.xlsx 152
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.6800 Kg Portland Semen
0.0560 m3 Pasir Pasang
0.0240 m3 Pasir Urug

0.1400 OH Pekerja
0.0700 OH Tukang Batu
0.0070 OH Kepala Tukang

J.5 1 M' Memasang Pipa Beton, Ø 30 cm - 100 cm


1.1000 Buah Pipa Beton
0.5500 m3 Batu Bata
10.3000 Kg Portland Semen
0.0610 m3 Pasir Pasang
0.0690 m3 Pasir Urug

0.3800 OH Pekerja
0.1900 OH Tukang Batu
0.0190 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 153
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

J.6 1 M' Memasang Pipa PVC type AW Ø ½"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0360 OH Pekerja
0.0600 OH Tukang Ledeng
0.0060 OH Kepala Tukang

J.7 1 M' MEMASANG PIPA PVC type AW Ø 3/4"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0396 OH Pekerja
0.0660 OH Tukang Ledeng
0.0066 OH Kepala Tukang

J.8 1 M' MEMASANG PIPA type AW PVC Ø 1"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0432 OH Pekerja
0.0720 OH Tukang Ledeng
0.0072 OH Kepala Tukang

J.9 1 M' MEMASANG PIPA PVC type AW Ø 11/4"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0468 OH Pekerja
0.0780 OH Tukang Ledeng
0.0078 OH Kepala Tukang

J.10 1 M' MEMASANG PIPA PVC type AW Ø 11/2"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0504 OH Pekerja
0.0840 OH Tukang Ledeng
0.0084 OH Kepala Tukang

J.11 1 M' Memasang Pipa PVC type AW Ø 2"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0540 OH Pekerja
0.0900 OH Tukang Ledeng
0.0090 OH Kepala Tukang

J.12 1 M' MEMASANG PIPA PVC type AW Ø 21/2"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0675 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 154
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1125 OH Tukang Ledeng
0.0113 OH Kepala Tukang

J.13 1 M' Memasang Pipa PVC type AW Ø 3"


1.0100 m' Pipa PVC
0.3500 Perlengkapan 35% Harga Pipa

0.0810 OH Pekerja
0.1350 OH Tukang Ledeng
0.0135 OH Kepala Tukang

J.14 1M' PEMASANGAN PIPA PVC 150 mm


0.5600 m3 Galian Tanah (B.1)
0.1370 m3 Urugan Pasir (B.9)
0.3150 m3 Urugan Tanah (B.9a)

0.1350 OH Tukang Pipa


0.0130 OH Kepala Tukang
0.4000 OH Pekerja
0.0750 lot Alat Bantu

J.15 1M' PEMASANGAN PIPA PVC 100 mm


0.4000 m3 Galian Tanah (B.1)
0.1110 m3 Urugan Pasir (B.9)
0.2800 m3 Urugan Tanah (B.9a)

0.0850 OH Tukang Pipa


0.0080 OH Kepala Tukang
0.2550 OH Pekerja
0.0500 lot Alat Bantu

J.16 1M' PEMASANGAN PIPA PVC 50 mm


0.1200 m3 Galian Tanah (B.1)
0.0300 m3 Urugan Tanah (B.9a)

0.2000 OH Tukang Pipa


0.0900 OH Pekerja
0.0030 lot Alat Bantu

J.17 1M' PEMASANGAN PIPA PVC 45 mm


0.2000 m3 Galian Tanah (B.1)
0.1000 m3 Urugan Pasir (B.9)
0.1000 m3 Urugan Tanah (B.9a)

0.0650 OH Tukang Pipa


0.0060 OH Kepala Tukang
0.1950 OH Pekerja
0.0250 lot Alat Bantu

J.18 1M' PEMASANGAN PIPA PVC 40 mm


0.1200 m3 Galian Tanah (B.1)
0.0200 m3 Urugan Tanah (B.9a)

0.1700 OH Tukang Pipa


0.0700 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 155
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0020 lot Alat Bantu

J.19 1M' PEMASANGAN PIPA PVC 25 mm


0.0600 m3 Galian Tanah (B.1)
0.0100 m3 Urugan Tanah (B.9a)

0.0400 OH Tukang Pipa


0.0600 OH Pekerja
0.0010 lot Alat Bantu

J.20 1M' MEMASANG PIPA PVC Ø 1"


0.0600 m3 Galian Tanah (B.1)
0.0100 m3 Urugan Tanah (B.9a)
0.0010 lot Alat Bantu

0.0600 OH Pekerja
0.0400 OH Tukang Ledeng

J.21 1M' MEMASANG PIPA PVC Ø 1 1/4"


0.1200 m3 Galian Tanah (B.1)
0.0200 m3 Urugan Tanah (B.9a)
0.0020 lot Alat Bantu

0.0700 OH Pekerja
0.1700 OH Tukang Ledeng

J.22 1M' MEMASANG PIPA PVC Ø 1 1/2"


0.2000 m3 Galian Tanah (B.1)
0.1000 m3 Urugan Pasir (B.9)
0.1000 m3 Urugan Tanah (B.9a)
0.0250 lot Alat Bantu

0.1950 OH Pekerja
0.0060 OH Kepala Tukang
0.0650 OH Tukang Ledeng

file:///conversion/tmp/scratch/385673381.xlsx 156
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

J.23 1M' MEMASANG PIPA PVC Ø 2"


0.1200 m3 Galian Tanah (B.1)
0.0300 m3 Urugan Tanah (B.9a)
0.0030 lot Alat Bantu

0.0900 OH Pekerja
0.2000 OH Tukang Ledeng

J.24 1M' MEMASANG PIPA PVC Ø 4"


0.0400 m3 Galian Tanah (B.1)
0.1110 m3 Urugan Pasir (B.9)
0.2800 m3 Urugan Tanah (B.9a)
0.0500 lot Alat Bantu

0.2550 OH Pekerja
0.0080 OH Kepala Tukang
0.0850 OH Tukang Ledeng

J.25 1M' MEMASANG PIPA PVC Ø 6"


0.5600 m3 Galian Tanah (B.1)
0.1370 m3 Urugan Pasir (B.9)
0.3150 m3 Urugan Tanah (B.9a)
0.0750 lot Alat Bantu

0.4000 OH Pekerja
0.0130 OH Kepala Tukang
0.1350 OH Tukang Ledeng

J.26 1 M2 PASANG PAVING BLOK 6 CM K : 300


1.0100 m2 Paving blok 6 Holand cm K : 300 (ALDAS)
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.27 1 M2 PASANG PAVING BLOK 6 CM K : 175


1.0100 m2 Paving blok Holand 6 cm K : 175
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.28 1 M2 PASANG PAVING BLOK 8 CM K ; 300


1.0100 m2 Paving blok Holand 8 cm K : 300 (ALDAS)
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.29 1 M2 PASANG PAVING BLOK 8 CM K: 175


1.0100 m2 Paving blok Holand 8 cm K : 175

file:///conversion/tmp/scratch/385673381.xlsx 157
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.30 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175


1.0100 m2 Paving blok warna 6 cm K : 175
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

file:///conversion/tmp/scratch/385673381.xlsx 158
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

J.30a 1 M2 PASANG PAVING BLOK 6 CM K: 250


1.0100 m2 Paving blok 6 Holand cm K : 250 (NUSA JAYA)
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.31 1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175


1.0100 m2 Paving blok warna 8 cm K : 175
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan

J.32 1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3


0.0300 m3 Batu pecah mesin 2/3
0.0140 m3 Batu pecah mesin 1/2
0.0050 m3 Batu pecah mesin 0.5/1
0.0050 m3 Kayu bakar
0.1000 org Pekerja
3.0000 kg Aspal
0.0180 lot Peralatan

J.33 MENGGILAS JALAN 1 HARI DIPERLUKAN


1.0000 org Operator
1.0000 org Pembantu Operator
1.0000 org Penjaga
6.0000 org Pekerja
20.0000 ltr Solar
0.5000 ltr Oli Sae 40
0.5000 ltr Oli Sae 50
0.5000 ltr Oli Sae 140
0.2500 ltr Stenveet
hari Pemeliharaan Alat

1 Bulan dihitung 25 hari menggilas


a= 25.0000

J.34a MENGGILAS 1 M2 LAPIS KULIT PENAHAN ax


J.34b MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN ax
J.34c MENGGILAS LAPIS AUS ( PENETRASI ) ax
J.34d MENGGILAS RINGAN 1 M2 OPERPENTING ax

J.35 100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG


125.0000 kg Aspal
1.0000 m3 Abu batu
0.9000 m3 Kayu bakar
8.3500 org Pekerja

J.36 1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )


2/100 x

file:///conversion/tmp/scratch/385673381.xlsx 159
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1/500 x Biaya menggilas
1/200 x Sewa motor walls
1/2 x Aspal untuk lem 0,5 kg

J.37 1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )


3/100 x
1/500 x Biaya menggilas
1/200 x Sewa motor walls
1/2 x Aspal untuk lem 0,5 kg

J.38 1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR


1.2000 m3 Pasir Urug / Sirtu
0.3750 Org Pekerja
0.1200 lot Peralatan

file:///conversion/tmp/scratch/385673381.xlsx 160
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

J.39 1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM


0.0500 m3 Pasir Urug / Sirtu
0.2000 m3 Batu Belah
0.3750 Org Pekerja
0.1200 lot Peralatan

J.40 1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM


0.0200 m3 Pasir Urug / Sirtu
0.0800 m3 Batu Pecah 4/6 5/7
0.0750 Org Pekerja
0.1200 lot Peralatan

J.41 1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK


1.0000 Btg Kayu Dolken

0.0400 OH Tukang Kayu


0.0040 OH Kepala Tukang
0.2500 OH Pekerja
0.1000 lot Alat Bantu

J.42 1 UNIT BOX PRECAST 100 x 100 x 15,TERPASANG


1.0000 bh Box Precast 100 x 100 x 120 x 15
0.5000 jam Excavator (+ operator)

1.0000 OH Tukang
3.0000 OH Pekerja
1.0000 lot Alat Bantu

J.43 1 UNIT BOX PRECAST 150 x 100 x 120 x 15,TERPASANG


1.0000 bh Box Precast 150 x 100 x 120 x 15
0.5000 jam Excavator (+ operator)

1.0000 OH Tukang
3.1000 OH Pekerja
1.0000 lot Alat Bantu

J.44 1 UNIT BOX PRECAST 150 x 150 x 120 x 15,TERPASANG


1.0000 bh Box Precast 150 x 150 x 120 x 15
0.6000 jam Excavator (+ operator)

1.1000 OH Tukang
3.2000 OH Pekerja
1.0000 lot Alat Bantu

J.45 1 UNIT BOX PRECAST 200 x 150 x 120 x 20,TERPASANG


1.0000 bh Box Precast 200 x 150 x 120 x 20
1.0000 jam Excavator (+ operator)

1.2000 OH Tukang
3.3000 OH Pekerja
1.0000 lot Alat Bantu

J.46 1 UNIT BOX PRECAST 300 x 100 x 120 x 20,TERPASANG


1.0000 bh Box Precast 300 x 100 x 120 x 20

file:///conversion/tmp/scratch/385673381.xlsx 161
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1.5000 jam Excavator (+ operator)

1.3000 OH Tukang
3.4000 OH Pekerja
1.0000 lot Alat Bantu

J.47 1 UNIT BOX PRECAST 380 x 350 x 120 x 20,TERPASANG


1.0000 bh Box Precast 380 x 350 x 120 x 20
2.5000 jam Excavator (+ operator)

1.4000 OH Tukang
3.5000 OH Pekerja
1.0000 lot Alat Bantu

J.48 1 UNIT BOX PRECAST 420 x 300 x 120 x 25,TERPASANG


1.0000 bh Box Precast 420 x 300 x 120 x 25
2.5000 jam Excavator (+ operator)

1.5000 OH Tukang
3.6000 OH Pekerja
1.0000 lot Alat Bantu

J.49 1 UNIT, RCP 800 x 2500, TERPASANG


1.0000 bh RCP 800 x 2500
0.4500 jam Excavator (+ operator)

1.0000 OH Tukang
2.4250 OH Pekerja
1.0000 lot Alat Bantu

J.50 1 UNIT, RCP 500 x 2500, TERPASANG


1.0000 bh RCP 500 x 2500
0.4500 jam Excavator (+ operator)

1.0000 OH Tukang
2.4250 OH Pekerja
1.0000 lot Alat Bantu

XI K PEKERJAAN BESI & ALLUMUNIUM


K.1 1 Kg Memasang Besi Profil
1.1500 Kg Besi Profil
0.0600 Kg Meni Besi

0.0600 OH Pekerja
0.0600 OH Tukang Besi
0.0060 OH Kepala Tukang

K.2 1 Kg Memasang Rangka Kuda-kuda Baja IWF


1.1500 kg Besi Baja IWF

0.0600 OH Pekerja
0.0600 OH Tukang Besi
0.0060 OH Kepala Tukang

K.3 1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

file:///conversion/tmp/scratch/385673381.xlsx 162
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
1.0500 Lbr Seng Plaat
0.0150 Kg Paku Biasa 1 - 2,5 cm
0.0190 m3 Kayu Papan Klas II atau III

0.2000 OH Pekerja
0.4000 OH Tukang Kayu
0.0250 OH Kepala Tukang

K.4 1 M' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30
Lebar 45 cm
1.0500 Lbr Seng Plaat
0.0100 Kg Paku Biasa 1 - 2,5 cm
0.5000 Kg Besi strip

0.1500 OH Pekerja
0.3000 OH Tukang Kayu
0.0300 OH Kepala Tukang

XII L PEKERJAAN KUNCI dan KACA


L.1 1 BUAH Pasang Kunci Tanam Biasa
1.0000 Buah Kunci Tanam Biasa

0.0100 OH Pekerja
0.5000 OH Tukang Kayu
0.0100 OH Kepala Tukang

L.2 1 BUAH Pasang Kunci Tanam Kamar Mandi


1.0000 Buah Kunci Tanam Kamar Mandi

0.0050 OH Pekerja
0.5000 OH Tukang Kayu
0.0050 OH Kepala Tukang

L.3 1 BUAH Pasang Engsel Pintu


1.0000 Buah Engsel Pintu

0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 163
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

L.4 1 BUAH Pasang Engsel Jendela Kupu-kupu


1.0000 Buah Engsel Jendela

0.0100 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang

L.5 1 BUAH Pasang Engsel Angin


1.0000 Buah Engsel Angin

0.0200 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang

L.6 1 BUAH Pasang Kait Angin


1.0000 Buah Kait Angin

0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang

L.7 1 BUAH Pasang Kunci Selot


1.0000 Buah Kunci Selot

0.0200 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang

L.8 1 BUAH Pasang Kunci Lemari


1.0000 Buah Kunci Lemari

0.0250 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang

L.9 1 M2 Pasang Kaca tebal 5 mm


1.1000 m2 Kaca tebal 5mm

0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang

XIII M PEKERJAAN PENUTUP LANTAI dan DINDING


M.1 1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm
26.5000 Buah Ubin Abu-abu 20x20 cm
10.4000 Kg Portland Semen
0.0135 m3 Pasir Pasang

0.2700 OH Pekerja
0.1300 OH Tukang Batu
0.0130 OH Kepala Tukang

M.2 1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm

file:///conversion/tmp/scratch/385673381.xlsx 164
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
6.9300 Buah Ubin Granito 40x40 cm
9.8000 Kg Portland Semen
0.0450 m3 Pasir Pasang
1.3000 Kg Semen Warna

0.2500 OH Pekerja
0.1200 OH Tukang Batu
0.0120 OH Kepala Tukang

M.3 1 M2 Pasang Lantai Keramik 30 x 30 cm


1.1870 m2 Ubin Keramik 30 x 30 cm
10.0000 Kg Portland Semen
0.0450 m3 Pasir Pasang
1.5000 Kg Semen Warna

0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 165
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

M.4 1 M2 Pasang Lantai Keramik 20 x 20 cm


26.5000 Buah Ubin Keramik 20 x 20 cm
10.4000 Kg Portland Semen
0.0450 m3 Pasir Pasang
1.6200 Kg Semen Warna

0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

M.5 1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m


1.0600 m2 Marmer
8.1900 Kg Portland Semen
0.0450 m3 Pasir Pasang
0.6500 Kg Semen Warna

0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

M.6 1 M2 Pasang Dinding Keramik 10x20 cm,


53.0000 Buah Keramik 10x20 cm
9.3000 Kg Portland Semen
0.0180 m3 Pasir Pasang
2.7500 Kg Semen Warna

0.6000 OH Pekerja
0.4500 OH Tukang Batu
0.0450 OH Kepala Tukang

M.7 1 M2 Pasang Dinding Keramik 20x20 cm,


26.5000 Buah Keramik 20x20 cm
9.3000 Kg Portland Semen
0.0180 m3 Pasir Pasang
2.7500 Kg Semen Warna

0.6000 OH Pekerja
0.4500 OH Tukang Batu
0.0450 OH Kepala Tukang

M.8 1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m


1.0200 Buah Marmer
2.0000 Kg Paku 12 cm
12.4400 Kg Portland Semen
0.0250 m3 Pasir Pasang
0.6500 Kg Semen Warna

0.7200 OH Pekerja
0.6500 OH Tukang Batu
0.0650 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 166
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam
1.1000 m2 Batu Paros
11.7500 Kg Portland Semen
0.0350 m3 Pasir Pasang

0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang

M.10 1 M2 DINDING GRANIT IMPORT


1.0000 m2 Granit import
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
1.0000 lot Campuran kedap air
1.0000 org Pekerja
3.0000 org Tukang batu
0.2000 org Kepala tukang batu
0.4800 lot Alat bantu

file:///conversion/tmp/scratch/385673381.xlsx 167
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

M.11 1 M2 LANTAI GRANIT IMPORT


1.0000 m2 Granit import
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
1.0000 lot Campuran kedap air
0.5000 org Pekerja
1.5000 org Tukang batu
0.1000 org Kepala tukang batu
0.0320 lot Alat bantu

M.12 1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED


1.0000 m2 Granito 60 x 60 polished lokal
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
0.7500 lot Campuran kedap air
0.2500 org Pekerja
0.6000 org Tukang batu
0.0500 org Kepala tukang batu
0.0240 lot Alat bantu

M.13 1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED


1.0000 m2 Granito 60 x 60 polished lokal
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
0.7500 lot Campuran kedap air
0.2500 org Pekerja
0.7000 org Tukang batu
0.0500 org Kepala tukang batu
0.0400 lot Alat bantu

M.14 1 M2 LANTAI MARMER ITALY


1.0000 m2 Marmer Italy
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
1.0000 lot Campuran kedap air
0.5000 org Pekerja
1.5000 org Tukang batu
0.1000 org Kepala tukang batu
0.0320 lot Alat bantu

M.15 1 M2 DINDING MARMER ITALY


1.0000 m2 marmer italy
0.2600 zak P C (50 kg)
0.0300 m3 Pasir pasang
1.0000 lot Campuran kedap air
1.0000 org Pekerja
3.0000 org Tukang batu
0.2000 org Kepala tukang batu
0.4800 lot Alat bantu

XIV N PEKERJAAN PENGECATAN

N.1 1 M2 Mendempul dan Menggosok Kayu


0.0800 Kg Dempul Jadi

file:///conversion/tmp/scratch/385673381.xlsx 168
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.0200 Kg Minyak Cat
0.1000 lbr Amplas

0.0400 OH Pekerja
0.0400 OH Tukang Cat
0.0040 OH Kepala Tukang

N.2 1 M2 Pengecatan Bidang Lama


0.1500 Kg Plamir
0.1700 Kg Cat Dasar
0.1700 Kg Cat Penutup

0.0700 OH Pekerja
0.0750 OH Tukang Cat
0.0075 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 169
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

N.3 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup
0.2000 Kg Cat Meni
0.1500 Kg Plamir
0.1700 Kg Cat Dasar
0.2600 Kg Cat Penutup 2 kali

0.0700 OH Pekerja
0.0090 OH Tukang Cat
0.0060 OH Kepala Tukang

N.4 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup
0.2000 Kg Cat Meni
0.1500 Kg Plamir
0.1700 Kg Cat Dasar
0.3500 Kg Cat Penutup 2 kali

0.0700 OH Pekerja
0.1050 OH Tukang Cat
0.0040 OH Kepala Tukang

N.5 1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)
0.1000 Kg Plamir
0.1000 Kg Cat Dasar
0.2600 Kg Cat Penutup 2 kali

0.0200 OH Pekerja
0.0630 OH Tukang Cat
0.0063 OH Kepala Tukang

N.6 1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)


0.1000 Kg Cat Dasar
0.1800 Kg Cat Penutup 2 kali

0.0280 OH Pekerja
0.0420 OH Tukang Cat
0.0042 OH Kepala Tukang

N.7 1 M2 Pengecatan Permukaan Baja dg Meni Besi


0.1000 Kg Meni Besi
0.0100 Kg Perekat / Lem

0.0200 OH Pekerja
0.2000 OH Tukang Cat
0.0020 OH Kepala Tukang

N.8 1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


0.1000 Kg Meni Besi
0.0100 Kg Perekat / Lem
0.0020 m3 Perancah Kayu

0.2500 OH Pekerja

file:///conversion/tmp/scratch/385673381.xlsx 170
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5
0.2250 OH Tukang Cat
0.0225 OH Kepala Tukang

N.9 1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm
0.1100 Kg Cat dasar
0.1700 Kg Cat Antara
0.0800 Kg Cat Penutup

0.5000 OH Pekerja
0.8000 OH Tukang Cat
0.3000 OH Kepala Tukang

file:///conversion/tmp/scratch/385673381.xlsx 171
No. KODE KOEF SAT. URAIAN PAKERJAAN

1 2 3 4 5

N.10 1 M2 PLITURAN BANGUNAN ( BIASA )


0.0300 kg Dempul plitur (dempul kasar)
0.2000 kg Wood Filler (INFRA)
0.0200 kg Oker putih
0.0100 kg Oker warna
0.2000 kg Batu apung (gosok)
0.0100 kg Sirlak
0.1000 bh kwas 3"
0.2000 ltr Spritus
0.1000 lbr Ampelas kayu
0.2500 org Pekerja
0.2850 org Tukang cat
0.0400 org Kepala tukang cat

N.11 1 M2 PLITURAN MEUBELAIR


0.0300 kg Dempul plitur (dempul kasar)
0.2000 kg Wood Filler (INFRA)
0.3500 kg Melamik
0.0200 kg Oker putih
0.0100 kg Oker warna
0.1000 kg Batu apung (gosok)
0.2000 kg Sirlak
0.0100 bh kwas 3"
0.2000 ltr Spritus
0.1000 lbr Ampelas kayu
0.2500 org Pekerja
0.2850 org Tukang cat
0.0400 org Kepala tukang cat

Rembang,

KEPALA DINAS PE

NIP. 19620715

file:///conversion/tmp/scratch/385673381.xlsx 172
ANALISA SATUAN PEKERJAAN
AAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

edisi januari 2011


HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

ra dari Seng Gelombang Tinggi 2,00 m 385,915.10


35,700.00 44,625.00
1,312.50 3,281.25
54,850.00 65,820.00
144,800.00 724.00
261,250.00 2,351.25
3,281,300.00 236,253.60
16,750.00 1,005.00
16,100.00 7,245.00

48,875.00 9,775.00
34,500.00 13,800.00
51,750.00 1,035.00

101,437.38
4,855,125.00 58,261.50
16,750.00 335.00
4,855,125.00 33,985.88

48,875.00 4,887.50
34,500.00 3,450.00
51,750.00 517.50

1,180,572.00
35,700.00 44,625.00
3,281,300.00 590,634.00
16,750.00 14,237.50
16,200.00 17,820.00
1,312.50 45,937.50
144,800.00 36,200.00
261,250.00 39,187.50
425.00 12,750.00
54,850.00 13,712.50
54,450.00 108,900.00
96,250.00 7,700.00
66,800.00 10,020.00
5,950.00 1,785.00
98,550.00 5,913.00

48,875.00 97,750.00
48,875.00 48,875.00
34,500.00 69,000.00
51,750.00 15,525.00

file:///conversion/tmp/scratch/385673381.xlsx 173
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

1,011,665.25
35,700.00 60,690.00
3,281,300.00 689,073.00
16,750.00 5,025.00
1,312.50 13,781.25
171,950.00 5,158.50
261,250.00 13,062.50
54,850.00 82,275.00

48,875.00 97,750.00
34,500.00 34,500.00
51,750.00 10,350.00

3,450.00
34,500.00 3,450.00

file:///conversion/tmp/scratch/385673381.xlsx 174
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

37,512.25
17,050.00 17,050.00
13,700.00 3,425.00
-
48,875.00 8,308.75
34,500.00 8,625.00
51,750.00 103.50

230,011.50
34,500.00 230,011.50

230,011.50
34,500.00 230,011.50

AR DINDING BATA / BATU (Batu / bata dipakai lagi) 103,500.00


34,500.00 103,500.00

AR DINDING BATA / BATU (bongkaran tidak dipakai lagi) 69,000.00


34,500.00 69,000.00

4,312.50
34,500.00 4,312.50

R GENTENG / SIRAP (bongkaran tidak dipakai lagi) 3,450.00


34,500.00 3,450.00

R GENTENG / SIRAP (bongkaran dipakai lagi) 17,250.00


34,500.00 17,250.00

R RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi) 9,228.75


34,500.00 5,175.00
48,875.00 3,665.63
51,750.00 388.13

R RANGKA ATAP / RENG KASO (bongkaran dipakai lagi) 12,305.00


34,500.00 6,900.00
48,875.00 4,887.50
51,750.00 517.50

R KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi) 462,300.00


34,500.00 138,000.00
48,875.00 293,250.00
51,750.00 31,050.00

KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi) 284,625.00


34,500.00 138,000.00
48,875.00 146,625.00

R PLAFOND (bongkaran dipakai lagi) 19,665.00


34,500.00 3,450.00
48,875.00 14,662.50

file:///conversion/tmp/scratch/385673381.xlsx 175
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 1,552.50

R PLAFOND (bongkaran tidak dipakai lagi) 5,175.00


34,500.00 5,175.00
Keterangan :
K = Biaya
( L + 75 ))
a = Upah Pekerja
L = Jarak angkut

Keterangan :
K = Biaya
( L + 75 ))/25
a = Upah Pekerja
L = Jarak angkut

file:///conversion/tmp/scratch/385673381.xlsx 176
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

13,800.00
34,500.00 13,800.00

34,500.00
34,500.00 34,500.00

51,750.00
34,500.00 51,750.00

41,400.00
34,500.00 41,400.00

1,725.00
34,500.00 1,725.00

11,385.00
34,500.00 11,385.00

K = Biaya
a = Upah Pekerja
L = Jarak pembuangan

ali (dihitung 1/3 kali indeks pekerjaan galian)


17,250.00
34,500.00 17,250.00

84,690.00
61,950.00 74,340.00

34,500.00 10,350.00

10,350.00
34,500.00 10,350.00

152,600.00
61,950.00 24,780.00
196,000.00 26,460.00
55,000.00 52,140.00

34,500.00 27,600.00
48,875.00 19,550.00
51,750.00 2,070.00

87,375.00
13,700.00 82,200.00

34,500.00 5,175.00

file:///conversion/tmp/scratch/385673381.xlsx 177
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

136,545.00
106,600.00 127,920.00

34,500.00 8,625.00

18,147.00
34,500.00 18,147.00

TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA 26,045.00


34,500.00 25,357.50
13,750.00 687.50

TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA 33,255.50


34,500.00 32,568.00
13,750.00 687.50

TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA 40,466.00


34,500.00 39,778.50
13,750.00 687.50

file:///conversion/tmp/scratch/385673381.xlsx 178
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

TANAH BANYAK TERDAPAT BATU-BATU BUNDAR


55,187.50
34,500.00 51,750.00
13,750.00 3,437.50

TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA 25,000.00


34,500.00 21,562.50
13,750.00 3,437.50

NAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3 6,481.45


500,000.00 2,286.63
4,500.00 3,169.27
20,000.00 365.86
20,050.00 91.69
49,450.00 226.15
40,250.00 184.07
34,500.00 157.78

NAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3 8,475.74


500,000.00 2,990.21
4,500.00 4,144.43
20,000.00 478.43
20,050.00 119.91
49,450.00 295.73
40,250.00 240.71
34,500.00 206.32

SIL GALIAN DENGAN DUMP TRUCK . M3/KM. 4,764.77


250,000.00 2,515.18
4,500.00 1,131.83
20,000.00 201.21
20,050.00 100.86
46,575.00 468.58
34,500.00 347.10

UT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


6,497.68
250,000.00 3,429.94
4,500.00 1,543.47
20,000.00 274.40
20,050.00 137.54
46,575.00 639.00
34,500.00 473.33

UT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


10,808.32
250,000.00 5,716.57
4,500.00 2,572.46
20,000.00 457.33
18,200.00 208.08
46,575.00 1,065.00
34,500.00 788.89

file:///conversion/tmp/scratch/385673381.xlsx 179
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
UT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
15,161.26
250,000.00 8,003.20
4,500.00 3,601.44
20,000.00 640.26
20,050.00 320.93
46,575.00 1,491.00
34,500.00 1,104.44

10,343.75
34,500.00 8,625.00
13,750.00 1,718.75

94,225.00
68,750.00 82,500.00
34,500.00 10,350.00
13,750.00 1,375.00

file:///conversion/tmp/scratch/385673381.xlsx 180
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

155,725.00
196,000.00 39,200.00
55,000.00 55,000.00
34,500.00 34,500.00
48,875.00 24,437.50
51,750.00 2,587.50

245,525.00
144,800.00 144,800.00
196,000.00 39,200.00
34,500.00 34,500.00
48,875.00 24,437.50
51,750.00 2,587.50

Err:509
34,500.00 8,625.00
Err:509 Err:509
13,750.00 1,718.75

5,346.88
34,500.00 5,175.00
13,750.00 171.88

1,896.88
34,500.00 1,725.00
13,750.00 171.88

GEBALAN RUMPUT SAMPAI TUMBUH 23,511.88


13,700.00 16,440.00
34,500.00 6,900.00
13,750.00 171.88

ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3) 91,845.00


13,800.00 8,280.00
25,000.00 15,000.00
1,725.00 8,625.00
49,950.00 59,940.00

534,373.00
95,700.00 114,840.00
1,312.50 265,125.00
144,800.00 70,228.00

34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00

478,683.50
95,700.00 105,270.00
1,312.50 213,937.50
144,800.00 75,296.00

file:///conversion/tmp/scratch/385673381.xlsx 181
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00

456,291.20
95,700.00 114,840.00
1,312.50 178,500.00
144,800.00 78,771.20

34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00

file:///conversion/tmp/scratch/385673381.xlsx 182
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

379,136.10
95,700.00 114,840.00
1,312.50 80,062.50
196,000.00 28,812.00
144,800.00 71,241.60

34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00

186,831.90
95,700.00 114,840.00
61,950.00 26,762.40

34,500.00 24,150.00
48,875.00 19,061.25
51,750.00 2,018.25

si Siklop 60% Beton Camp. 1PC : 2PS : 3KR & 2,056,646.90

95,700.00 45,936.00
11,100.00 1,398,600.00
1,312.50 254,625.00
171,950.00 53,648.40
261,250.00 122,265.00
17,850.00 32,130.00

34,500.00 103,500.00
48,875.00 41,543.75
51,750.00 4,398.75

563,457.60
95,700.00 43,065.00
1,312.50 254,625.00
144,800.00 45,177.60
261,250.00 122,265.00

34,500.00 82,110.00
48,875.00 14,662.50
51,750.00 1,552.50

ng Pancang (40x40) cm, Beton Bertulang 732,301.50


61,950.00 1,177.05
171,950.00 16,163.30
261,250.00 39,187.50
1,312.50 79,406.25
11,100.00 499,500.00
17,850.00 16,065.00
46,215.49 1,478.90
16,750.00 2,010.00
22,000.00 1,980.00
19,250.00 4,620.00

34,500.00 34,500.00

file:///conversion/tmp/scratch/385673381.xlsx 183
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 32,746.25
51,750.00 3,467.25

NCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN) 12,068.75


48,875.00 6,109.38
51,750.00 646.88
34,500.00 5,175.00
13,750.00 137.50

64,399.50
48,875.00 1,955.00
51,750.00 207.00
34,500.00 62,100.00
13,750.00 137.50

file:///conversion/tmp/scratch/385673381.xlsx 184
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

80,499.38
48,875.00 2,443.75
51,750.00 258.75
34,500.00 77,625.00
13,750.00 171.88

96,599.25
48,875.00 2,932.50
51,750.00 310.50
34,500.00 93,150.00
13,750.00 206.25

128,799.00
48,875.00 3,910.00
51,750.00 414.00
34,500.00 124,200.00
13,750.00 275.00

BATU BRONJONG UNTUK KAWAT 3 MM 408,636.67


126,100.00 151,320.00
18,550.00 154,583.33
48,875.00 32,583.33
34,500.00 70,150.00

BATU BRONJONG UNTUK KAWAT 4 MM 537,861.67


126,100.00 151,320.00
18,550.00 278,250.00
48,875.00 35,841.67
34,500.00 72,450.00

BATU BRONJONG UNTUK KAWAT 5 MM 699,632.50


126,100.00 151,320.00
18,550.00 432,833.33
48,875.00 40,729.17
34,500.00 74,750.00

75,879.28
425.00 29,750.00
1,312.50 24,871.88
144,800.00 5,502.40

34,500.00 10,350.00
48,875.00 4,887.50
51,750.00 517.50

70,157.63
425.00 29,750.00
1,312.50 18,860.63
144,800.00 5,792.00

34,500.00 10,350.00

file:///conversion/tmp/scratch/385673381.xlsx 185
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 4,887.50
51,750.00 517.50

Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 61,591.25


425.00 29,750.00
1,312.50 5,906.25
144,800.00 7,240.00
196,000.00 2,940.00

34,500.00 10,350.00
48,875.00 4,887.50
51,750.00 517.50

file:///conversion/tmp/scratch/385673381.xlsx 186
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

67,515.15
425.00 29,750.00
1,312.50 15,093.75
144,800.00 6,226.40
34,500.00 11,040.00
48,875.00 4,887.50
51,750.00 517.50

65,416.00
425.00 29,750.00
1,312.50 12,705.00
144,800.00 6,516.00
34,500.00 11,040.00
48,875.00 4,887.50
51,750.00 517.50

150,669.43
91,900.00 101,090.00
65,625.00 7,875.00
144,800.00 4,488.80
34,500.00 6,468.75
48,875.00 10,996.88
51,750.00 19,406.25
13,750.00 343.75

767,260.90
425.00 212,500.00
65,625.00 270,217.50
144,800.00 48,218.40
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50

673,828.80
425.00 212,500.00
65,625.00 166,215.00
144,800.00 58,788.80
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50

585,253.90
425.00 212,500.00
65,625.00 61,582.50
196,000.00 21,560.00
144,800.00 53,286.40
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50

27,824.28

file:///conversion/tmp/scratch/385673381.xlsx 187
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
1,312.50 10,185.00
144,800.00 3,330.40

34,500.00 6,900.00
48,875.00 7,331.25
51,750.00 77.63

21,889.50
1,312.50 3,937.50
196,000.00 980.00
144,800.00 2,896.00

34,500.00 7,590.00
48,875.00 5,865.00
51,750.00 621.00

file:///conversion/tmp/scratch/385673381.xlsx 188
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

19,927.08
1,312.50 2,415.00
196,000.00 1,176.00
144,800.00 2,027.20

34,500.00 6,900.00
48,875.00 7,331.25
51,750.00 77.63

37,876.80
1,312.50 13,608.00
144,800.00 4,488.80

34,500.00 8,970.00
48,875.00 9,775.00
51,750.00 1,035.00

19,527.30
1,312.50 6,804.00
144,800.00 3,764.80

34,500.00 5,175.00
48,875.00 3,421.25
51,750.00 362.25

5,790.25
34,500.00 1,966.50
48,875.00 1,857.25
51,750.00 1,966.50

20,568.80
1,312.50 5,670.00
144,800.00 868.80

34,500.00 8,625.00
48,875.00 4,887.50
51,750.00 517.50

27,975.85
1,312.50 8,321.25
144,800.00 1,737.60

34,500.00 10,350.00
48,875.00 6,842.50
51,750.00 724.50

14,845.63
1,312.50 4,265.63

34,500.00 5,175.00
48,875.00 4,887.50

file:///conversion/tmp/scratch/385673381.xlsx 189
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 517.50

18,170,987.50
15,312,500.00 16,843,750.00
16,750.00 20,937.50
18,300.00 18,300.00

34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00

10,984,357.50
8,779,200.00 9,657,120.00
16,750.00 20,937.50
18,300.00 18,300.00

34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00

420,833.00
8,779,200.00 351,168.00
16,750.00 837.50

34,500.00 12,075.00
48,875.00 51,318.75
51,750.00 5,433.75

521,708.00
8,779,200.00 351,168.00
18,300.00 915.00

34,500.00 34,500.00
48,875.00 122,187.50
51,750.00 12,937.50

448,462.00
8,779,200.00 307,272.00
18,300.00 5,490.00

34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00

1,185,800.00
15,312,500.00 980,000.00
18,300.00 9,150.00

34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 15,525.00

u Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm 456,482.50

file:///conversion/tmp/scratch/385673381.xlsx 190
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
8,779,200.00 219,480.00
16,750.00 502.50
18,300.00 9,150.00
98,550.00 98,550.00

34,500.00 20,700.00
48,875.00 97,750.00
51,750.00 10,350.00

u Plywood rangkap, rangka expose kayu Bengkirai 468,650.02


8,779,200.00 224,747.52
16,750.00 502.50
18,300.00 9,150.00
98,550.00 98,550.00

34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00

1,046,612.50
15,312,500.00 918,750.00
16,750.00 2,512.50

34,500.00 17,250.00
48,875.00 97,750.00
51,750.00 10,350.00

654,614.50
8,779,200.00 526,752.00
16,750.00 2,512.50

34,500.00 17,250.00
48,875.00 97,750.00
51,750.00 10,350.00

file:///conversion/tmp/scratch/385673381.xlsx 191
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

u Teakwood Rangkap Rangka Kayu Kelas I (jati) 623,055.00


15,312,500.00 382,812.50
16,750.00 502.50
18,300.00 5,490.00
98,550.00 98,550.00

34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00

u Teakwood Rangkap Lapis Formika Rangka ekspose 608,971.50

8,779,200.00 219,480.00
16,750.00 502.50
18,300.00 1,464.00
98,550.00 98,550.00
252,500.00 126,250.00

34,500.00 27,600.00
48,875.00 122,187.50
51,750.00 12,937.50

RIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC ) 453,919.00


8,779,200.00 131,688.00
72,300.00 72,300.00
130,680.00 156,816.00
16,750.00 3,350.00
18,300.00 9,150.00

34,500.00 10,350.00
48,875.00 63,537.50
51,750.00 6,727.50

RIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC ) 440,873.00


8,779,200.00 131,688.00
72,300.00 72,300.00
252,500.00 126,250.00
16,750.00 3,350.00
18,300.00 9,150.00
53,100.00 10,620.00

34,500.00 17,250.00
48,875.00 63,537.50
51,750.00 6,727.50

nstruksi Kuda-kuda Konvensional Kayu Bengkirai 10,700,120.00

8,779,200.00 9,657,120.00
16,200.00 243,000.00
16,750.00 13,400.00

34,500.00 138,000.00
48,875.00 586,500.00
51,750.00 62,100.00

file:///conversion/tmp/scratch/385673381.xlsx 192
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

nstruksi Kuda-kuda Ekspose Kayu Jati 18,468,550.00


15,312,500.00 16,843,750.00
16,200.00 243,000.00
16,750.00 93,800.00

34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00

10,422,330.00
8,779,200.00 9,657,120.00
16,200.00 243,000.00
16,750.00 50,250.00

34,500.00 82,800.00
48,875.00 351,900.00
51,750.00 37,260.00

file:///conversion/tmp/scratch/385673381.xlsx 193
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

Plywood & Formika Rangka Kayu Bengkirai 642,564.82


8,779,200.00 172,072.32
16,750.00 502.50
18,300.00 5,490.00
98,550.00 49,275.00
252,500.00 252,500.00

34,500.00 27,600.00
48,875.00 122,187.50
51,750.00 12,937.50

848,667.50
15,312,500.00 300,125.00
16,750.00 502.50
18,300.00 21,960.00
98,550.00 98,550.00
252,500.00 252,500.00

34,500.00 34,500.00
48,875.00 127,075.00
51,750.00 13,455.00

ngka Atap Genteng Keramik, Kayu Bengkirai 120,148.74


8,779,200.00 75,501.12
8,779,200.00 31,605.12
16,750.00 4,187.50

34,500.00 3,450.00
48,875.00 4,887.50
51,750.00 517.50

ngka Atap Genteng Beton, Kayu Bengkirai 126,469.76


8,779,200.00 75,501.12
8,779,200.00 37,926.14
16,750.00 4,187.50

34,500.00 3,450.00
48,875.00 4,887.50
51,750.00 517.50

1,462,544.00
8,779,200.00 1,448,568.00
16,750.00 3,350.00

34,500.00 4,140.00
48,875.00 5,865.00
51,750.00 621.00

79,403.99
8,779,200.00 63,210.24
16,750.00 1,675.00

file:///conversion/tmp/scratch/385673381.xlsx 194
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 3,450.00
48,875.00 9,775.00
51,750.00 1,293.75

111,668.70
8,779,200.00 96,571.20
16,750.00 837.50

34,500.00 3,450.00
48,875.00 9,775.00
51,750.00 1,035.00

148,498.40
8,779,200.00 127,298.40
16,750.00 2,512.50

34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75

277,827.60
8,779,200.00 245,817.60
16,750.00 2,512.50

34,500.00 5,175.00
48,875.00 21,993.75
51,750.00 2,328.75

emisah Teakwood Rangkap Rangka Kayu Bengkirai 372,828.60


8,779,200.00 245,817.60
16,750.00 2,512.50
98,550.00 84,753.00
18,300.00 10,248.00

34,500.00 5,175.00
48,875.00 21,993.75
51,750.00 2,328.75

230,272.50
15,312,500.00 107,187.50
16,750.00 1,675.00
22,800.00 3,420.00

34,500.00 20,700.00
48,875.00 87,975.00
51,750.00 9,315.00

52,711.25
98,550.00 39,420.00
16,750.00 8,375.00

34,500.00 862.50
48,875.00 3,665.63

file:///conversion/tmp/scratch/385673381.xlsx 195
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 388.13

78,522.70
17,050.00 25,575.00
3,281,300.00 45,938.20
16,750.00 837.50
6,500.00 19.50

34,500.00 3,450.00
48,875.00 2,443.75
51,750.00 258.75

n mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 685,402.95


1,312.50 324,187.50
171,950.00 106,731.82
246,850.00 182,669.00

34,500.00 56,925.00
48,875.00 13,440.63
51,750.00 1,449.00

n mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 745,316.22


1,312.50 362,250.00
171,950.00 101,696.14
246,850.00 185,046.07

34,500.00 80,643.75
48,875.00 14,231.25
51,750.00 1,449.00

n mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 748,346.78


1,312.50 392,437.50
171,950.00 98,134.32
246,850.00 185,960.33

34,500.00 56,925.00
48,875.00 13,440.63
51,750.00 1,449.00

Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 651,553.39
1,312.50 301,875.00
171,950.00 109,679.54
246,850.00 187,788.85

34,500.00 41,400.00
48,875.00 9,775.00
51,750.00 1,035.00

n mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 779,811.34


1,312.50 427,875.00
171,950.00 93,344.29
246,850.00 188,154.56

file:///conversion/tmp/scratch/385673381.xlsx 196
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

n mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0,61 810,740.22


1,312.50 462,000.00
171,950.00 89,782.46
246,850.00 188,520.26

34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

n mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 834,550.25


1,312.50 486,937.50
171,950.00 85,729.36
246,850.00 191,445.89

34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

n mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0,56 917,367.40


1,312.50 504,000.00
309,430.00 152,946.83
246,850.00 189,983.07

34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 942,097.16
1,312.50 532,875.00
309,430.00 151,178.66
246,850.00 187,606.00

34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

n mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0,52 949,707.33


1,312.50 542,062.50
309,430.00 150,515.59
246,850.00 186,691.74

34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75

n mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0,49 999,588.32


1,312.50 576,187.50
309,430.00 148,084.36
246,850.00 183,948.96

34,500.00 72,450.00

file:///conversion/tmp/scratch/385673381.xlsx 197
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 17,106.25
51,750.00 1,811.25

file:///conversion/tmp/scratch/385673381.xlsx 198
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

n mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,009,640.64


1,312.50 588,000.00
309,430.00 147,421.29
246,850.00 182,851.85

34,500.00 72,450.00
48,875.00 17,106.25
51,750.00 1,811.25

a= 12,542.60
11,100.00 11,655.00
17,850.00 267.75

34,500.00 241.50
48,875.00 342.13
51,750.00 36.23

110 1,379,686.00
125 1,567,825.00

20,098.75
18,550.00 19,477.50
17,850.00 178.50

34,500.00 172.50
48,875.00 244.38
51,750.00 25.88

121,718.00
2,062,500.00 82,500.00
16,750.00 5,025.00
22,000.00 2,200.00

34,500.00 17,940.00
48,875.00 12,707.50
51,750.00 1,345.50

ing Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan 868,250.00


2,062,500.00 824,175.00
16,750.00 6,700.00

34,500.00 10,350.00
48,875.00 24,437.50
51,750.00 2,587.50

132,030.50
2,062,500.00 92,812.50
16,750.00 5,025.00
22,000.00 2,200.00

34,500.00 17,940.00
48,875.00 12,707.50
51,750.00 1,345.50

file:///conversion/tmp/scratch/385673381.xlsx 199
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

302,146.00
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 71,400.00

34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75

file:///conversion/tmp/scratch/385673381.xlsx 200
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

311,989.90
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 59,063.40
135,200.00 47,320.00
35,700.00 71,400.00

34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75

444,946.00
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 214,200.00

34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75

353,627.50
2,062,500.00 61,875.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 65,626.00
135,200.00 47,320.00
35,700.00 107,100.00
5,000.00 20,000.00

34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75

280,421.00
2,062,500.00 61,875.00
16,750.00 6,700.00
22,000.00 3,300.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 71,400.00

34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75

90,227.50
2,062,500.00 54,450.00
16,750.00 10,050.00
35,700.00 17,850.00

file:///conversion/tmp/scratch/385673381.xlsx 201
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 5,175.00
48,875.00 2,443.75
51,750.00 258.75

137,425.85
3,281,300.00 55,782.10
2,062,500.00 49,500.00
16,750.00 6,700.00

34,500.00 10,350.00
48,875.00 7,331.25
51,750.00 7,762.50

128,630.25
3,281,300.00 55,782.10
135,200.00 46,914.40
16,750.00 6,700.00
34,500.00 4,140.00
48,875.00 7,331.25
51,750.00 7,762.50

file:///conversion/tmp/scratch/385673381.xlsx 202
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

dasi Beton Bertulang (150 kg Besi + Bekisting) 3,305,008.38


2,062,500.00 412,500.00
16,750.00 25,125.00
22,000.00 8,800.00
11,100.00 1,748,250.00
17,850.00 40,162.50
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50

34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,558.50

of Beton Bertulang (200 kg Besi + Bekisting) 4,103,341.38


2,062,500.00 556,875.00
16,750.00 33,500.00
22,000.00 13,200.00
11,100.00 2,331,000.00
17,850.00 53,550.00
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50

34,500.00 194,925.00
48,875.00 13,440.63
48,875.00 76,245.00
48,875.00 68,425.00
51,750.00 16,715.25

om Beton Bertulang (300 kg Besi + Bekisting) 7,398,487.63


2,062,500.00 825,000.00
16,750.00 67,000.00
22,000.00 44,000.00
11,100.00 3,496,500.00
17,850.00 80,325.00
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 492,195.00
135,200.00 473,200.00
35,700.00 714,000.00

34,500.00 243,225.00
48,875.00 13,440.63
48,875.00 80,643.75
48,875.00 102,637.50
51,750.00 20,855.25

ok Beton Bertulang (200 kg Besi + Bekisting) 5,758,174.63


2,062,500.00 660,000.00

file:///conversion/tmp/scratch/385673381.xlsx 203
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
16,750.00 53,600.00
22,000.00 35,200.00
11,100.00 2,331,000.00
17,850.00 53,550.00
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 459,382.00
135,200.00 378,560.00
35,700.00 642,600.00

34,500.00 219,075.00
48,875.00 13,440.63
48,875.00 80,643.75
48,875.00 68,425.00
51,750.00 17,232.75

file:///conversion/tmp/scratch/385673381.xlsx 204
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

ok Beton Bertulang (150 kg Besi + Bekisting) 5,522,254.63


2,062,500.00 660,000.00
16,750.00 53,600.00
22,000.00 35,200.00
11,100.00 1,748,250.00
17,850.00 40,162.50
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 393,756.00
135,200.00 378,560.00
35,700.00 1,142,400.00

34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,713.75

ding Beton Bertulang (150 kg Besi + Bekisting) 5,202,751.38


2,062,500.00 495,000.00
16,750.00 53,600.00
22,000.00 35,200.00
11,100.00 1,748,250.00
17,850.00 40,162.50
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 525,008.00
135,200.00 378,560.00
35,700.00 856,800.00

34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,558.50

gga Beton Bertulang (200 kg Besi + Bekisting) 5,274,377.88


2,062,500.00 515,625.00
16,750.00 50,250.00
22,000.00 26,400.00
11,100.00 2,331,000.00
17,850.00 53,550.00
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 344,536.50
135,200.00 338,000.00
35,700.00 499,800.00

34,500.00 194,925.00
48,875.00 13,440.63

file:///conversion/tmp/scratch/385673381.xlsx 205
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 76,245.00
48,875.00 68,425.00
51,750.00 16,715.25

m Penguat Beton Bertulang (11 x 11) cm 63,710.95


2,062,500.00 4,125.00
16,750.00 167.50
11,100.00 33,300.00
17,850.00 8,032.50
1,312.50 5,250.00
171,950.00 1,031.70
261,250.00 2,351.25

34,500.00 6,210.00
48,875.00 977.50
48,875.00 977.50
48,875.00 977.50
51,750.00 310.50

file:///conversion/tmp/scratch/385673381.xlsx 206
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

75,662.68
2,062,500.00 6,187.50
16,750.00 335.00
11,100.00 39,960.00
17,850.00 892.50
1,312.50 7,218.75
171,950.00 1,547.55
261,250.00 3,918.75

34,500.00 10,246.50
48,875.00 1,612.88
48,875.00 1,612.88
48,875.00 1,612.88
51,750.00 517.50

K-175 READY MIX 6 M3 BERIKUT SLANG 1,002,112.50


897,850.00 897,850.00
34,500.00 86,250.00
48,875.00 12,218.75
51,750.00 5,175.00
13,750.00 618.75

K-225 READY MIX 6 M3 BERIKUT SLANG 1,057,137.50


952,875.00 952,875.00
34,500.00 86,250.00
48,875.00 12,218.75
51,750.00 5,175.00
13,750.00 618.75

K-300 READY MIX 6 M3 BERIKUT SLANG 1,098,512.50


994,250.00 994,250.00
34,500.00 86,250.00
48,875.00 12,218.75
51,750.00 5,175.00
13,750.00 618.75

1,006.37
34,500.00 34.50
48,875.00 48.88
51,750.00 10.35
49,450.00 9.89
40,250.00 805.00
150,000.00 30.00
4,500.00 45.00
20,000.00 20.00
13,750.00 2.75

44,402.50
19,400.00 21,340.00
34,500.00 2,070.00
48,875.00 1,466.25
51,750.00 776.25

file:///conversion/tmp/scratch/385673381.xlsx 207
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
150,000.00 18,750.00

43,412.50
18,500.00 20,350.00
34,500.00 2,070.00
48,875.00 1,466.25
51,750.00 776.25
150,000.00 18,750.00

LASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM 39,883.13


33,000.00 1,320.00
4,500.00 135.00
20,000.00 80.00
34,500.00 345.00
48,875.00 244.38
51,750.00 258.75
150,000.00 37,500.00

file:///conversion/tmp/scratch/385673381.xlsx 208
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

40,357.75
34,500.00 1,725.00
48,875.00 977.50
51,750.00 155.25
150,000.00 37,500.00

83,741.63
72,600.00 73,326.00
33,000.00 3,300.00
34,500.00 3,450.00
48,875.00 3,665.63

34,254.63
1,000.00 25,000.00

34,500.00 5,175.00
48,875.00 3,665.63
51,750.00 414.00

32,418.00
1,200.00 24,000.00

34,500.00 5,175.00
48,875.00 2,932.50
51,750.00 310.50

54,243.60
2,900.00 14,500.00
1,312.50 10,500.00
144,800.00 4,633.60

34,500.00 13,800.00
48,875.00 9,775.00
51,750.00 1,035.00

Asbes Gelombang (80 x 210 cm) x 5 mm 39,539.63


45,850.00 27,510.00
26,000.00 3,120.00

34,500.00 4,830.00
48,875.00 3,665.63
51,750.00 414.00

43,057.50
2,750.00 30,250.00
16,750.00 502.50

34,500.00 6,900.00
48,875.00 4,887.50
51,750.00 517.50

file:///conversion/tmp/scratch/385673381.xlsx 209
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
177,959.50
2,589.50 155,370.00
16,750.00 3,350.00

34,500.00 5,727.00
48,875.00 12,218.75
51,750.00 1,293.75

76,018.60
9,075.00 31,762.50
16,750.00 837.50
1,312.50 14,175.00
144,800.00 4,633.60

34,500.00 13,800.00
48,875.00 9,775.00
51,750.00 1,035.00

file:///conversion/tmp/scratch/385673381.xlsx 210
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

60,527.74
81,200.00 32,480.00
16,750.00 1,005.00
16,750.00 8,375.00
210,683.95 842.74

34,500.00 4,312.50
48,875.00 12,218.75
51,750.00 1,293.75

64,558.00
81,200.00 56,840.00
16,750.00 335.00

34,500.00 4,140.00
48,875.00 2,932.50
51,750.00 310.50

34,040.25
81,200.00 24,360.00
16,750.00 670.00

34,500.00 5,175.00
48,875.00 3,421.25
51,750.00 414.00

Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm 25,941.00


19,050.00 20,955.00
16,750.00 167.50

34,500.00 1,035.00
48,875.00 3,421.25
51,750.00 362.25

ngit-langit Tripleks Uk (120x240) cm, 35,435.00

72,300.00 27,112.50
16,750.00 502.50

34,500.00 2,415.00
48,875.00 4,887.50
51,750.00 517.50

ngit-langit Lambriziring Kayu Jati, tebal 6 mm 293,795.00


15,312,500.00 229,687.50
16,750.00 167.50

34,500.00 20,700.00
48,875.00 39,100.00
51,750.00 4,140.00

file:///conversion/tmp/scratch/385673381.xlsx 211
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
38,690.50
82,500.00 30,030.00
22,800.00 2,508.00

34,500.00 3,450.00
48,875.00 2,443.75
51,750.00 258.75

12,575.00
7,600.00 7,980.00
16,750.00 167.50

34,500.00 1,725.00
48,875.00 2,443.75
51,750.00 258.75

file:///conversion/tmp/scratch/385673381.xlsx 212
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

a Langit-langit (1,00x1,00) m, kayu Bengkirai 157,237.18


8,779,200.00 135,199.68
16,750.00 3,350.00

34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75

a Langit-langit (1,00x1,00) m, kayu Kruing 73,487.50


6,125,000.00 51,450.00
16,750.00 3,350.00

34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75

a Langit-langit (60x60) cm, kayu Bengkirai 170,403.46


8,779,200.00 143,100.96
16,750.00 4,187.50

34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50

TASI, JALAN, SALURAN DAN BOX CULVERT


752,114.25
584,450.00 584,450.00

34,500.00 113,850.00
48,875.00 53,762.50
51,750.00 51.75

318,510.50
123,750.00 123,750.00
1,312.50 7,875.00
144,800.00 1,448.00

34,500.00 34,500.00
48,875.00 73,312.50
51,750.00 77,625.00

718,107.38
501,950.00 501,950.00
501,950.00 150,585.00
1,312.50 7,875.00
144,800.00 1,448.00

34,500.00 41,400.00
48,875.00 7,086.88
51,750.00 7,762.50

79,756.51
55,000.00 60,500.00
5,737.50 154.91

file:///conversion/tmp/scratch/385673381.xlsx 213
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
1,312.50 892.50
144,800.00 8,108.80
61,950.00 1,486.80

34,500.00 4,830.00
48,875.00 3,421.25
51,750.00 362.25

128,786.23
68,750.00 75,625.00
5,737.50 3,155.63
1,312.50 13,518.75
144,800.00 8,832.80
61,950.00 4,274.55

34,500.00 13,110.00
48,875.00 9,286.25
51,750.00 983.25

file:///conversion/tmp/scratch/385673381.xlsx 214
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

10,605.00
4,500.00 4,545.00
4,500.00 1,575.00

34,500.00 1,242.00
48,875.00 2,932.50
51,750.00 310.50

14,589.50
7,100.00 7,171.00
7,100.00 2,485.00

34,500.00 1,366.20
48,875.00 3,225.75
51,750.00 341.55

20,716.00
11,275.00 11,387.75
11,275.00 3,946.25

34,500.00 1,490.40
48,875.00 3,519.00
51,750.00 372.60

25,686.50
14,600.00 14,746.00
14,600.00 5,110.00

34,500.00 1,614.60
48,875.00 3,812.25
51,750.00 403.65

37,287.00
22,800.00 23,028.00
22,800.00 7,980.00

34,500.00 1,738.80
48,875.00 4,105.50
51,750.00 434.70

53,103.50
34,100.00 34,441.00
34,100.00 11,935.00

34,500.00 1,863.00
48,875.00 4,398.75
51,750.00 465.75

76,003.96
49,700.00 50,197.00
49,700.00 17,395.00

34,500.00 2,328.75

file:///conversion/tmp/scratch/385673381.xlsx 215
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 5,498.44
51,750.00 584.78

108,827.25
72,600.00 73,326.00
72,600.00 25,410.00

34,500.00 2,794.50
48,875.00 6,598.13
51,750.00 698.63

44,692.91
13,800.00 7,728.00
84,690.00 11,602.53
10,350.00 3,260.25

48,875.00 6,598.13
51,750.00 672.75
34,500.00 13,800.00
13,750.00 1,031.25

31,871.97
13,800.00 5,520.00
84,690.00 9,400.59
10,350.00 2,898.00

48,875.00 4,154.38
51,750.00 414.00
34,500.00 8,797.50
13,750.00 687.50

14,887.75
13,800.00 1,656.00
10,350.00 310.50

48,875.00 9,775.00
34,500.00 3,105.00
13,750.00 41.25

22,822.63
13,800.00 2,760.00
84,690.00 8,469.00
10,350.00 1,035.00

48,875.00 3,176.88
51,750.00 310.50
34,500.00 6,727.50
13,750.00 343.75

12,614.25
13,800.00 1,656.00
10,350.00 207.00

48,875.00 8,308.75
34,500.00 2,415.00

file:///conversion/tmp/scratch/385673381.xlsx 216
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
13,750.00 27.50

4,970.25
13,800.00 828.00
10,350.00 103.50

48,875.00 1,955.00
34,500.00 2,070.00
13,750.00 13.75

4,970.25
13,800.00 828.00
10,350.00 103.50
13,750.00 13.75

34,500.00 2,070.00
48,875.00 1,955.00

12,614.25
13,800.00 1,656.00
10,350.00 207.00
13,750.00 27.50

34,500.00 2,415.00
48,875.00 8,308.75

22,822.63
13,800.00 2,760.00
84,690.00 8,469.00
10,350.00 1,035.00
13,750.00 343.75

34,500.00 6,727.50
51,750.00 310.50
48,875.00 3,176.88

file:///conversion/tmp/scratch/385673381.xlsx 217
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

14,887.75
13,800.00 1,656.00
10,350.00 310.50
13,750.00 41.25

34,500.00 3,105.00
48,875.00 9,775.00

26,903.97
13,800.00 552.00
84,690.00 9,400.59
10,350.00 2,898.00
13,750.00 687.50

34,500.00 8,797.50
51,750.00 414.00
48,875.00 4,154.38

44,692.91
13,800.00 7,728.00
84,690.00 11,602.53
10,350.00 3,260.25
13,750.00 1,031.25

34,500.00 13,800.00
51,750.00 672.75
48,875.00 6,598.13

98,377.50
59,500.00 60,095.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

75,400.00
36,750.00 37,117.50
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

141,403.50
102,100.00 103,121.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

84,742.50
46,000.00 46,460.00

file:///conversion/tmp/scratch/385673381.xlsx 218
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

90,600.50
51,800.00 52,318.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

file:///conversion/tmp/scratch/385673381.xlsx 219
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

110,245.00
71,250 71,962.50
144,800 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

93,832.50
55,000.00 55,550.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50

NGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM 41,880.05


246,850.00 7,405.50
248,950.00 3,485.30
261,250.00 1,306.25
97,100.00 485.50
34,500.00 3,450.00
8,500.00 25,500.00
13,750.00 247.50

49,450.00 49,450.00
40,250.00 40,250.00
10,000.00 10,000.00
34,500.00 207,000.00
4,500.00 90,000.00
20,000.00 10,000.00
20,000.00 10,000.00
20,000.00 10,000.00
20,050.00 5,012.50
100,000.00
531,712.50

hari 13,292,812.50

2 / 7.500 3,544.75
1 / 7.500 1,772.38
2/25000 1,063.43
0,25/2500 1,329.28

LAN SHEET (LATASIR) TEBAL 1 CM JERENG 1,774,165.00


9,500.00 1,187,500.00
211,200.00 211,200.00
97,100.00 87,390.00
34,500.00 288,075.00

SHEET TEBAL 2 CM JERENG ( 1 CM PADAT ) 41,671.73


1,774,165.00 35,483.30

file:///conversion/tmp/scratch/385673381.xlsx 220
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
531,712.50 1,063.43
75,000.00 375.00
9,500.00 4,750.00

SHEET TEBAL 3 CM JERENG ( 2 CM PADAT ) 59,413.38


1,774,165.00 53,224.95
531,712.50 1,063.43
75,000.00 375.00
9,500.00 4,750.00

WAH ALAS JALAN TIAP 1 M3 LAPIS PASIR 167,307,746.50


61,950.00 74,340.00
34,500.00 12,937.50
13,750.00 1,650.00

file:///conversion/tmp/scratch/385673381.xlsx 221
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

167,215,721.50
61,950.00 3,097.50
95,700.00 19,140.00
34,500.00 12,937.50
13,750.00 1,650.00

167,177,657.50
61,950.00 1,239.00
137,900.00 11,032.00
34,500.00 2,587.50
13,750.00 1,650.00

DAAN DAN PEMASANGAN CERUCUK 47,862.00


35,700.00 35,700.00

48,875.00 1,955.00
51,750.00 207.00
34,500.00 8,625.00
13,750.00 1,375.00

3,907,700.00
3,628,000.00 3,628,000.00
227,150.00 113,575.00

48,875.00 48,875.00
34,500.00 103,500.00
13,750.00 13,750.00

AST 150 x 100 x 120 x 15,TERPASANG 5,491,150.00


5,208,000.00 5,208,000.00
227,150.00 113,575.00

48,875.00 48,875.00
34,500.00 106,950.00
13,750.00 13,750.00

AST 150 x 150 x 120 x 15,TERPASANG 6,240,202.50


5,926,000.00 5,926,000.00
227,150.00 136,290.00

48,875.00 53,762.50
34,500.00 110,400.00
13,750.00 13,750.00

AST 200 x 150 x 120 x 20,TERPASANG 7,711,400.00


7,298,000.00 7,298,000.00
227,150.00 227,150.00

48,875.00 58,650.00
34,500.00 113,850.00
13,750.00 13,750.00

AST 300 x 100 x 120 x 20,TERPASANG 11,187,312.50


10,652,000.00 10,652,000.00

file:///conversion/tmp/scratch/385673381.xlsx 222
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
227,150.00 340,725.00

48,875.00 63,537.50
34,500.00 117,300.00
13,750.00 13,750.00

AST 380 x 350 x 120 x 20,TERPASANG 19,830,800.00


19,060,000.00 19,060,000.00
227,150.00 567,875.00

48,875.00 68,425.00
34,500.00 120,750.00
13,750.00 13,750.00

AST 420 x 300 x 120 x 25,TERPASANG 22,749,137.50


21,970,000.00 21,970,000.00
227,150.00 567,875.00

48,875.00 73,312.50
34,500.00 124,200.00
13,750.00 13,750.00

4,258,505.00
4,010,000.00 4,010,000.00
227,150.00 102,217.50

48,875.00 48,875.00
34,500.00 83,662.50
13,750.00 13,750.00

2,156,505.00
1,908,000.00 1,908,000.00
227,150.00 102,217.50

48,875.00 48,875.00
34,500.00 83,662.50
13,750.00 13,750.00

27,554.00
18,500.00 21,275.00
16,100.00 966.00

34,500.00 2,070.00
48,875.00 2,932.50
51,750.00 310.50

27,623.00
19,400.00 22,310.00

34,500.00 2,070.00
48,875.00 2,932.50
51,750.00 310.50

ang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 244,359.80

file:///conversion/tmp/scratch/385673381.xlsx 223
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
47,200.00 49,560.00
16,750.00 251.25
8,779,200.00 166,804.80

34,500.00 6,900.00
48,875.00 19,550.00
51,750.00 1,293.75

ang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 87,250.00

54,850.00 57,592.50
16,750.00 167.50
16,200.00 8,100.00

34,500.00 5,175.00
48,875.00 14,662.50
51,750.00 1,552.50

92,100.00
66,800.00 66,800.00

34,500.00 345.00
48,875.00 24,437.50
51,750.00 517.50

91,668.75
66,800.00 66,800.00

34,500.00 172.50
48,875.00 24,437.50
51,750.00 258.75

15,775.00
7,150.00 7,150.00

34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25

file:///conversion/tmp/scratch/385673381.xlsx 224
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

12,900.00
7,150.00 7,150.00

34,500.00 345.00
48,875.00 4,887.50
51,750.00 517.50

17,450.00
5,950.00 5,950.00

34,500.00 690.00
48,875.00 9,775.00
51,750.00 1,035.00

28,125.00
19,500.00 19,500.00

34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25

21,950.00
10,450.00 10,450.00

34,500.00 690.00
48,875.00 9,775.00
51,750.00 1,035.00

24,825.00
10,450.00 10,450.00

34,500.00 862.50
48,875.00 12,218.75
51,750.00 1,293.75

114,500.00
96,250.00 105,875.00

34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25

57,280.30
956.00 25,334.00
1,312.50 13,650.00
144,800.00 1,954.80

34,500.00 9,315.00
48,875.00 6,353.75
51,750.00 672.75

583,677.38

file:///conversion/tmp/scratch/385673381.xlsx 225
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
77,137.50 534,562.88
1,312.50 12,862.50
144,800.00 6,516.00
11,250.00 14,625.00

34,500.00 8,625.00
48,875.00 5,865.00
51,750.00 621.00

134,689.75
48,750.00 57,866.25
1,312.50 13,125.00
144,800.00 6,516.00
11,250.00 16,875.00

34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25

file:///conversion/tmp/scratch/385673381.xlsx 226
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

126,898.50
1,818.87 48,200.00
1,312.50 13,650.00
144,800.00 6,516.00
11,250.00 18,225.00

34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25

708,782.38
607,450.00 643,897.00
1,312.50 10,749.38
144,800.00 6,516.00
11,250.00 7,312.50

34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25

137,094.65
874.00 46,322.00
1,312.50 12,206.25
144,800.00 2,606.40
11,250.00 30,937.50

34,500.00 20,700.00
48,875.00 21,993.75
51,750.00 2,328.75

138,972.65
1,818.87 48,200.00
1,312.50 12,206.25
144,800.00 2,606.40
11,250.00 30,937.50

34,500.00 20,700.00
48,875.00 21,993.75
51,750.00 2,328.75

740,331.50
607,450.00 619,599.00
16,750.00 33,500.00
1,312.50 16,327.50
144,800.00 3,620.00
11,250.00 7,312.50

34,500.00 24,840.00
48,875.00 31,768.75
51,750.00 3,363.75

file:///conversion/tmp/scratch/385673381.xlsx 227
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
161,887.38
91,900.00 101,090.00
1,312.50 15,421.88
144,800.00 5,068.00

34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25

519,581.50
241,800.00 241,800.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 10,350.00
13,750.00 6,600.00

file:///conversion/tmp/scratch/385673381.xlsx 228
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

417,684.00
241,800.00 241,800.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 17,250.00
48,875.00 73,312.50
51,750.00 5,175.00
13,750.00 440.00

566,999.00
461,000.00 461,000.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 43,725.00
34,500.00 8,625.00
48,875.00 29,325.00
51,750.00 2,587.50
13,750.00 330.00

572,106.50
461,000.00 461,000.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 43,725.00
34,500.00 8,625.00
48,875.00 34,212.50
51,750.00 2,587.50
13,750.00 550.00

1,556,984.00
1,381,100.00 1,381,100.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 17,250.00
48,875.00 73,312.50
51,750.00 5,175.00
13,750.00 440.00

1,658,881.50
1,381,100.00 1,381,100.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 10,350.00
13,750.00 6,600.00

5,910.00
21,150.00 1,692.00

file:///conversion/tmp/scratch/385673381.xlsx 229
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
16,050.00 321.00
3,550.00 355.00

34,500.00 1,380.00
48,875.00 1,955.00
51,750.00 207.00

14,703.75
19,200.00 2,880.00
14,400.00 2,448.00
17,100.00 2,907.00

34,500.00 2,415.00
48,875.00 3,665.63
51,750.00 388.13

file:///conversion/tmp/scratch/385673381.xlsx 230
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

32,961.88

22,450.00 4,490.00
21,150.00 3,172.50
44,400.00 7,548.00
56,100.00 14,586.00

34,500.00 2,415.00
48,875.00 439.88
51,750.00 310.50

42,599.38

22,450.00 4,490.00
21,150.00 3,172.50
44,400.00 7,548.00
56,100.00 19,635.00

34,500.00 2,415.00
48,875.00 5,131.88
51,750.00 207.00

bok Baru (1lap.Plamir, 1lap Cat Dasar 13,220.15

19,250.00 1,925.00
20,000.00 2,000.00
20,000.00 5,200.00

34,500.00 690.00
48,875.00 3,079.13
51,750.00 326.03

bok Lama (1lap.Plamir, 2lap Cat Penutup) 8,836.10


20,000.00 2,000.00
20,000.00 3,600.00

34,500.00 966.00
48,875.00 2,052.75
51,750.00 217.35

12,709.50
16,100.00 1,610.00
53,100.00 531.00

34,500.00 690.00
48,875.00 9,775.00
51,750.00 103.50

Permukaan Baja dg Meni Besi & Perancah 27,052.25


16,100.00 1,610.00
53,100.00 531.00
2,062,500.00 4,125.00

34,500.00 8,625.00

file:///conversion/tmp/scratch/385673381.xlsx 231
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 10,996.88
51,750.00 1,164.38

Permukaan Baja lapis Seng (Galvanis) secara 90,279.00

50,300.00 5,533.00
50,300.00 8,551.00
54,000.00 4,320.00

34,500.00 17,250.00
48,875.00 39,100.00
51,750.00 15,525.00

file:///conversion/tmp/scratch/385673381.xlsx 232
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)

40,827.88
20,350.00 610.50
34,450.00 6,890.00
24,900.00 498.00
25,200.00 252.00
18,400.00 3,680.00
77,800.00 778.00
7,600.00 760.00
11,900.00 2,380.00
3,550.00 355.00
34,500.00 8,625.00
48,875.00 13,929.38
51,750.00 2,070.00

79,808.38
20,350.00 610.50
34,450.00 6,890.00
76,350.00 26,722.50
24,900.00 498.00
25,200.00 252.00
18,400.00 1,840.00
77,800.00 15,560.00
7,600.00 76.00
11,900.00 2,380.00
3,550.00 355.00
34,500.00 8,625.00
48,875.00 13,929.38
51,750.00 2,070.00

Rembang, Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx 233
DAF TAR HAR GA SAT UAN P E K E R JAAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011

NO. KODE URAIAN PEKERJAAN

1 2 3
I A PEKERJAAN PERSIAPAN
A.1 1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A.2 1M' Pengukuran dan Pemasangan Bouwplank
A.3 1M2 Pembuatan Kantor Sementara dg Lantai Plesteran
A.4 1M2 Pembuatan Gudang Semen dan Alat-alat
A.5 1M2 Membersihkan Lapangan dan Perataan
A.6 1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
A.7 1M3 Bongkaran Beton Bertulang
A.8 1M3 Bongkaran Dinding Tembok Bata Merah
A.9 1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)
A.10 1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)
A.11 1M2 MEMBONGKAR PLESTERAN DINDING
A.12 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)
A.13 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)
A.14 1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)
A.15 1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)
A.16 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)
A.17 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)
A.18 1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)
A.19 1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)

II B PEKERJAAN TANAH
B.1 1M3 Galian Tanah Biasa Sedalam 1 m
B.2 1M3 Galian Tanah Keras Sedalam 1 m
B.3 1M3 Galian Tanah Cadas Sedalam 1 m
B.4 1M3 Galian Tanah Lumpur Sedalam 1 m
B.5 1M2 Pekerjaan Striping Setinggi 1 m
B.6 1M3 Membuang Tanah Sejauh 30 m'
B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
B.8 1M3 Pemadatan Tanah
B.9 1M3 Urugan Pasir
B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia)
B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm
B.12 1M3 Urugan Sirtu
B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter

file:///conversion/tmp/scratch/385673381.xlsx 234
NO. KODE URAIAN PEKERJAAN

1 2 3
B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA
B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA
B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA
B.17 1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR
MAX KEDALAMAN 1 M' TENAGA MANUSIA
B.18 1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA
B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3
B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3
B.21 MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.
B.22 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
KURANG DARI 1,5 KM.
B.23 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
JARAK ANTARA 1,5 S/D 3 KM.
B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
JARAK ANTARA 3 S/D 5 KM.
B.25 1 M3 MERATAKAN TANAH
B.26 1 M3 PEK. URUGAN TANAH PILIHAN
B.27 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL
B.28 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS
B.29 1 M3 MERATAKAN TANAH DAN DITIMBRIS
B.30 1 M2 MENGAMBIL DAN PASANGAN GEBALAN
B.31 1 M' MENGANGKUT GEBALAN RUMPUT
B.32 1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH
B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)

III C PEKERJAAN PONDASI


C.1 1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps
C.1a 1 M3 PASANGAN BATU BELAH 1 : 4
C.2 1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps
C.3 1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps
C.4 1M3 Pasang Pondasi Batu Kosong
C.5 1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
C.6 1M3 Pasang Pondasi Sumuran diameter 100 cm
C.7 1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang
C.8 SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)
C.9 1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK
C.10 1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA
C.11 1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS
C.12 1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR
C.13 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

file:///conversion/tmp/scratch/385673381.xlsx 235
NO. KODE URAIAN PEKERJAAN

1 2 3
C.14 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM
C.15 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM

IV D P E K E R JAAN DINDING
D.1 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps
D.2 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps
D.3 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
D.4 1 M2 PASANGAN 1/2 BATA MERAH 1 : 4
D.5 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5
D.6 1 M2 PASANGAN BATU TEMPEL + SIARAN
D.7 1 M3 PASANGAN BATA MERAH 1 PC : 2 PS
D.8 1 M3 PASANGAN BATA MERAH 1 PC : 4 PS
D.9 1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS

V E PEKERJAAN PLESTERAN
E.1 1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm
E.2 1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm
E.3 1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm
E.4 1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm
E.5 1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm
E.6 1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm
E.7 1M2 Plesteran Ciprat 1 Pc : 2 Ps
E.8 1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps
E.9 1M2 Acian

VI F PEKERJAAN KAYU
F.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I
F.2 1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai
F.3 1M2 Membuat Pintu Klamp Standard Kayu Bengkirai
F.4 1M2 Membuat Daun Pintu Panel Kayu Bengkirai
F.5 1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai
F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)
F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm
F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai
F.9 1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)
F.10 1M2 Membuat Jalusi mati Kosen Kayu Bengkirai
F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)
F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose
Kayu Bengkirai
F.13 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )
F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )

file:///conversion/tmp/scratch/385673381.xlsx 236
NO. KODE URAIAN PEKERJAAN

1 2 3
F.15 1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai
Bentang 6 M
F.16 1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati
F.17 1M3 Memasang Konstruksi Gording Kayu Bengkirai
F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai
F.19 1M2 Pasang Pintu Formika Double, Rangka Kayu Jati
F.20 1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai
F.21 1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai
F.22 1M2 Pasang Rangka Atap Sirap Kayu Bengkirai
F.23 1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai
F.24 1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai
F.25 1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai
F.26 1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai
F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai
F.28 1M2 Pasang Dinding Lambriziring dari Papan jati
F.29 1M2 Pasang Plywood tebal 4mm unt Dinding
F.30 1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV

VII G PEKERJAAN BETON


G.1 1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
G.2 1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
G.3 1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
G.4 1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
G.5 1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
G.6 1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0,61
G.7 1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
G.8 1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0,56
G.9 1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
G.10 1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0,52
G.11 1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0,49
G.12 1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48
G.13 1KG Pembesian dg Besi Polos
G.13a 110 KG Besi Beton Terpasang (polos)
G.13b 125 KG Besi Beton Terpasang (polos)
G.14 1KG Kabel Presstresed Polos/strand
G.15 1M2 Pasang Bekisting untuk Pondasi
G.15a 1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan
G.16 1M2 Pasang Bekisting untuk Sloof
G.17 1M2 Pasang Bekisting untuk Kolom
G.18 1M2 Pasang Bekisting untuk Balok
G.19 1M2 Pasang Bekisting untuk Lantai

file:///conversion/tmp/scratch/385673381.xlsx 237
NO. KODE URAIAN PEKERJAAN

1 2 3
G.20 1M2 Pasang Bekisting untuk Dinding
G.21 1M2 Pasang Bekisting untuk Tangga
G.22 1 M2 Pasang Bekisting Jembatan Cor
G.23 1 M2 BEKESTING DENGAN PAPAN
G.24 1 M2 BEKESTING DENGAN MULTIPLEX 9 MM
G.25 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
G.26 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
G.27 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
G.28 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
G.29 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
G.30 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
G.31 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
G.32 1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
G.33 1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm
G.34 1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG
G.35 1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG
G.36 1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG
G.37 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI
G.38 1 KG PEKERJAAN BAJA IWF
G.39 1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL
G.40 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM
G.41 1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR
G.42 1 M2 PEKERJAAN WIREMESH M8

VIII H PEKERJAAN PENUTUP ATAP


H.1 1 M2 Pasang Atap Genteng Mantili Kecil
H.2 1 M2 Pasang Atap Genteng Mantili Besar
H.3 1 M' Pasang Genteng Bubung Mantili
H.4 1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm
H.5 1 M2 Pasang Atap Genteng Beton
H.6 1 M2 Pasang Atap Sirap
H.7 1 M' Pasang Nok Genteng Beton
H.8 1 M' Pasang Nok Sirap
H.9 1 M2 Pasang Atap Seng Gelombang
H.10 1 M' Pasang Atap Nok Seng

IX I PEKERJAAN LANGIT - LANGIT


I.1 1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
I.2 1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,
Tebal 3 mm, 4 mm & 6 mm
I.3 1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

file:///conversion/tmp/scratch/385673381.xlsx 238
NO. KODE URAIAN PEKERJAAN

1 2 3
I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mm
I.5 1 M' List Langit-Langit Kayu Profil
I.6 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai
I.6a 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing
I.7 1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai

X J PEKERJAAN SANITASI, JALAN, SALURAN DAN BOX CULVERT


J.1 1 UNIT Memasang Closet Duduk Porselin
J.2 1 UNIT Memasang Closet Jongkok
J.3 1 UNIT Memasang Wastafel
J.4 1 M' Memasang Pipa Beton, Ø 15 cm - 20 cm
J.5 1 M' Memasang Pipa Beton, Ø 30 cm - 100 cm
J.6 1 M' Memasang Pipa PVC type AW Ø ½"
J.7 1 M' MEMASANG PIPA PVC type AW Ø 3/4"
J.8 1 M' MEMASANG PIPA type AW PVC Ø 1"
J.9 1 M' MEMASANG PIPA PVC type AW Ø 11/4"
J.10 1 M' MEMASANG PIPA PVC type AW Ø 11/2"
J.11 1 M' Memasang Pipa PVC type AW Ø 2"
J.12 1 M' MEMASANG PIPA PVC type AW Ø 21/2"
J.13 1 M' Memasang Pipa PVC type AW Ø 3"
J.14 1M' PEMASANGAN PIPA PVC 150 mm
J.15 1M' PEMASANGAN PIPA PVC 100 mm
J.16 1M' PEMASANGAN PIPA PVC 50 mm
J.17 1M' PEMASANGAN PIPA PVC 45 mm
J.18 1M' PEMASANGAN PIPA PVC 40 mm
J.19 1M' PEMASANGAN PIPA PVC 25 mm
J.20 1M' MEMASANG PIPA PVC Ø 1"
J.21 1M' MEMASANG PIPA PVC Ø 1 1/4"
J.22 1M' MEMASANG PIPA PVC Ø 1 1/2"
J.23 1M' MEMASANG PIPA PVC Ø 2"
J.24 1M' MEMASANG PIPA PVC Ø 4"
J.25 1M' MEMASANG PIPA PVC Ø 6"
J.26 1 M2 PASANG PAVING BLOK 6 CM K : 300
J.27 1 M2 PASANG PAVING BLOK 6 CM K : 175
J.28 1 M2 PASANG PAVING BLOK 8 CM K ; 300
J.29 1 M2 PASANG PAVING BLOK 8 CM K: 175
J.30 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175
J.30a 1 M2 PASANG PAVING BLOK 6 CM K: 250
J.31 1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175
J.32 1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM
J.33 MENGGILAS JALAN 1 HARI DIPERLUKAN

file:///conversion/tmp/scratch/385673381.xlsx 239
NO. KODE URAIAN PEKERJAAN

1 2 3
J.34a MENGGILAS 1 M2 LAPIS KULIT PENAHAN
J.34b MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN
J.34c MENGGILAS LAPIS AUS ( PENETRASI )
J.34d MENGGILAS RINGAN 1 M2 OPERPENTING
J.35 100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG
J.36 1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )
J.37 1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )
J.38 1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR
J.39 1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM
J.40 1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM
J.41 1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK
J.42 1 UNIT BOX PRECAST 100 x 100 x 15,TERPASANG
J.43 1 UNIT BOX PRECAST 150 x 100 x 120 x 15,TERPASANG
J.44 1 UNIT BOX PRECAST 150 x 150 x 120 x 15,TERPASANG
J.45 1 UNIT BOX PRECAST 200 x 150 x 120 x 20,TERPASANG
J.46 1 UNIT BOX PRECAST 300 x 100 x 120 x 20,TERPASANG
J.47 1 UNIT BOX PRECAST 380 x 350 x 120 x 20,TERPASANG
J.48 1 UNIT BOX PRECAST 420 x 300 x 120 x 25,TERPASANG
J.49 1 UNIT, RCP 800 x 2500, TERPASANG
J.50 1 UNIT, RCP 500 x 2500, TERPASANG

XI K PEKERJAAN BESI & ALLUMUNIUM


K.1 1 Kg Memasang Besi Profil
K.2 1 Kg Memasang Rangka Kuda-kuda Baja IWF
K.3 1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
K.4 1 M' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30
Lebar 45 cm

XII L PEKERJAAN KUNCI dan KACA


L.1 1 BUAH Pasang Kunci Tanam Biasa
L.2 1 BUAH Pasang Kunci Tanam Kamar Mandi
L.3 1 BUAH Pasang Engsel Pintu
L.4 1 BUAH Pasang Engsel Jendela Kupu-kupu
L.5 1 BUAH Pasang Engsel Angin
L.6 1 BUAH Pasang Kait Angin
L.7 1 BUAH Pasang Kunci Selot
L.8 1 BUAH Pasang Kunci Lemari
L.9 1 M2 Pasang Kaca tebal 5 mm

XIII M PEKERJAAN PENUTUP LANTAI & DINDING


M.1 1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

file:///conversion/tmp/scratch/385673381.xlsx 240
NO. KODE URAIAN PEKERJAAN

1 2 3
M.2 1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm
M.3 1 M2 Pasang Lantai Keramik 30 x 30 cm
M.4 1 M2 Pasang Lantai Keramik 20 x 20 cm
M.5 1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m
M.6 1 M2 Pasang Dinding Keramik 10x20 cm,
M.7 1 M2 Pasang Dinding Keramik 20x20 cm,
M.8 1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m
M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam
M.10 1 M2 DINDING GRANIT IMPORT
M.11 1 M2 LANTAI GRANIT IMPORT
M.12 1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED
M.13 1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED
M.14 1 M2 LANTAI MARMER ITALY
M.15 1 M2 DINDING MARMER ITALY

XIV N PEKERJAAN PENGECATAN


N.1 1 M2 Mendempul dan Menggosok Kayu
N.2 1 M2 Pengecatan Bidang Lama
N.3 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)
1 lap.Cat Dasar & 2 lap.Cat Penutup
N.4 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)
1 lap.Cat Dasar & 3 lap.Cat Penutup
N.5 1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar
2 lap. Cat Penutup)
N.6 1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
N.7 1 M2 Pengecatan Permukaan Baja dg Meni Besi
N.8 1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah
N.9 1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara
manual sistem 3 lapis Cat Konvensional dg tebal 200 um
N.10 1 M2 PLITURAN BANGUNAN ( BIASA )
N.11 1 M2 PLITURAN MEUBELAIR

Rembang, Januari 20

KEPALA DINAS PEKERJAAN


KABUPATEN REMBAN

Ir. MUJOKO, MT.


NIP. 19620715 199011 1

file:///conversion/tmp/scratch/385673381.xlsx 241
GA SAT UAN P E K E R JAAN
UMUM KABUPATEN REMBANG
UK TAHUN 2011
edisi januari 2011

HARGA SATUAN

385,915.10
101,437.38
1,180,572.00
1,011,665.25
3,450.00
37,512.25
230,011.50
230,011.50
103,500.00
69,000.00
4,312.50
3,450.00
17,250.00
9,228.75
12,305.00
462,300.00
284,625.00
19,665.00
5,175.00

13,800.00
34,500.00
51,750.00
41,400.00
1,725.00
11,385.00
-
17,250.00
84,690.00
10,350.00
152,600.00
87,375.00
136,545.00
18,147.00

file:///conversion/tmp/scratch/385673381.xlsx 242
HARGA SATUAN

4
26,045.00
33,255.50
40,466.00
55,187.50

25,000.00
6,481.45
8,475.74
4,764.77
6,497.68

10,808.32

15,161.26

10,343.75
94,225.00
155,725.00
245,525.00
Err:509
5,346.88
1,896.88
23,511.88
91,845.00

534,373.00
478,683.50
456,291.20
379,136.10
186,831.90
2,056,646.90

563,457.60
732,301.50
12,068.75
64,399.50
80,499.38
96,599.25
128,799.00
408,636.67

file:///conversion/tmp/scratch/385673381.xlsx 243
HARGA SATUAN

4
537,861.67
699,632.50

75,879.28
70,157.63
61,591.25
67,515.15
65,416.00
150,669.43
767,260.90
673,828.80
585,253.90

27,824.28
21,889.50
19,927.08
37,876.80
19,527.30
5,790.25
20,568.80
27,975.85
14,845.63

18,170,987.50
10,984,357.50
420,833.00
521,708.00
448,462.00
1,185,800.00
456,482.50
468,650.02
1,046,612.50
654,614.50
623,055.00
608,971.50

453,919.00
440,873.00

file:///conversion/tmp/scratch/385673381.xlsx 244
HARGA SATUAN

4
10,700,120.00

18,468,550.00
10,422,330.00
642,564.82
848,667.50
120,148.74
126,469.76
1,462,544.00
79,403.99
111,668.70
148,498.40
277,827.60
372,828.60
230,272.50
52,711.25
78,522.70

685,402.95
745,316.22
748,346.78
651,553.39
779,811.34
810,740.22
834,550.25
917,367.40
942,097.16
949,707.33
999,588.32
1,009,640.64
12,542.60
1,379,686.00
1,567,825.00
20,098.75
121,718.00
868,250.00
132,030.50
302,146.00
311,989.90
444,946.00

file:///conversion/tmp/scratch/385673381.xlsx 245
HARGA SATUAN

4
353,627.50
280,421.00
90,227.50
137,425.85
128,630.25
3,305,008.38
4,103,341.38
7,398,487.63
5,758,174.63
5,522,254.63
5,202,751.38
5,274,377.88
63,710.95
75,662.68
1,002,112.50
1,057,137.50
1,098,512.50
1,006.37
44,402.50
43,412.50
39,883.13
40,357.75
83,741.63

34,254.63
32,418.00
54,243.60
39,539.63
43,057.50
177,959.50
76,018.60
60,527.74
64,558.00
34,040.25

25,941.00
35,435.00

293,795.00

file:///conversion/tmp/scratch/385673381.xlsx 246
HARGA SATUAN

4
38,690.50
12,575.00
157,237.18
73,487.50
170,403.46

752,114.25
318,510.50
718,107.38
79,756.51
128,786.23
10,605.00
14,589.50
20,716.00
25,686.50
37,287.00
53,103.50
76,003.96
108,827.25
44,692.91
31,871.97
14,887.75
22,822.63
12,614.25
4,970.25
4,970.25
12,614.25
22,822.63
14,887.75
26,903.97
44,692.91
98,377.50
75,400.00
141,403.50
84,742.50
90,600.50
110,245.00
93,832.50
41,880.05
531,712.50

file:///conversion/tmp/scratch/385673381.xlsx 247
HARGA SATUAN

4
3,544.75
1,772.38
1,063.43
1,329.28
1,774,165.00
41,671.73
59,413.38
167,307,746.50
167,215,721.50
167,177,657.50
47,862.00
3,907,700.00
5,491,150.00
6,240,202.50
7,711,400.00
11,187,312.50
19,830,800.00
22,749,137.50
4,258,505.00
2,156,505.00

27,554.00
27,623.00
244,359.80
87,250.00

92,100.00
91,668.75
15,775.00
12,900.00
17,450.00
28,125.00
21,950.00
24,825.00
114,500.00

57,280.30

file:///conversion/tmp/scratch/385673381.xlsx 248
HARGA SATUAN

4
583,677.38
134,689.75
126,898.50
708,782.38
137,094.65
138,972.65
740,331.50
161,887.38
519,581.50
417,684.00
566,999.00
572,106.50
1,556,984.00
1,658,881.50

5,910.00
14,703.75
32,961.88

42,599.38

13,220.15

8,836.10
12,709.50
27,052.25
90,279.00

40,827.88
79,808.38

Rembang, Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///conversion/tmp/scratch/385673381.xlsx 249
KEGIATAN SWAKELOLA
BIDANG CIPTA KARYA

Anda mungkin juga menyukai