Anda di halaman 1dari 7

NOMOR HARGA TOTAL

NO JENIS PEKERJAAN SATUAN VOL.


ANALISA SATUAN HARGA
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1. Persiapan Lokasi Ls 1,500,000 1,500,000
TOTAL POINT I 1,500,000
II PEKERJAAN PLESTERAN
Plesteran Dinding m2 147 140,000 20,580,000
Plesteran Beton m2 60 140,000 8,400,000
TOTAL POINT II 28,980,000
III PEKERJAAN PINTU JENDELA
Kayu Kusen m3 1.50 4,750,000 7,125,000
Daun Pintu m2 3 1,500,000 4,500,000
Daun Jendela 3 kaca 3" m2 4.87 800,000 3,896,000
Tripleks bh 15.00 150,000 2,250,000
Kaca Bening 5 mm m2 10.25 140,000 1,435,000
Engsel dan Kunci bh 35.00 95,000 3,325,000
TOTAL POINT III 22,531,000
IV PEKERJAAN LANTAI DAN PLAFOND
Keramik Lanti 40 x 40 cm m2 195 125,000 24,375,000
Plan Keramik m2 24 125,000 3,000,000
Kayu Usuk Plafond m 1,520 7,500 11,400,000
Calsiboard buah 40 90,000 3,600,000
TOTAL POINT IV 42,375,000
V PEKERJAAN INSTALASI LISTRIK
Sekring box unit 1 149,000 149,000
Lampu LED 20 W bh 11 65,000 715,000
Titik Lampu bh 11 75,000 825,000
Stop Kontak bh 6 25,000 150,000
Saklar Doubel bh 4 25,000 100,000
Saklar Tunggal bh 5 25,000 125,000
Pemasangan Listrik Ls 1 1,500,000 1,500,000
TOTAL POINT V 3,564,000
VI PEKERJAAN PENGECATAN
Cat Tembok kg 125 35,000 4,375,000
Cat Plafond kg 35 35,000 1,225,000
Cat Kayu kg 6 75,000 450,000
TOTAL POINT VI 6,050,000
VII ONGKOS TUKANG Ls 25,000,000
TOTAL POINT VII 25,000,000
TOTAL POINT I + II +III + IV + V + VI + VII 130,000,000
NOMOR HARGA TOTAL
NO JENIS PEKERJAAN SATUAN VOL.
ANALISA SATUAN HARGA
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1. Persiapan Lokasi Ls 500,000 500,000
TOTAL POINT I 500,000
II PEKERJAAN PLESTERAN
Plesteran Dinding m2 147 95,000 13,965,000
Plesteran Beton m2 60 95,000 5,700,000
TOTAL POINT II 19,665,000
III PEKERJAAN PINTU JENDELA
Kayu Kusen m3 1.00 4,750,000 4,750,000
Daun Pintu m2 3 1,500,000 4,500,000
Daun Jendela 3 kaca 3" m2 4.87 800,000 3,896,000
Tripleks bh 15.00 100,000 1,500,000
Kaca Bening 5 mm m2 10.25 125,000 1,281,250
Engsel dan Kunci bh 35.00 85,000 2,975,000
TOTAL POINT III 18,902,250
IV PEKERJAAN LANTAI DAN PLAFOND
Keramik Lanti 40 x 40 cm m2 192 120,000 23,040,000
Plan Keramik m2 24 120,000 2,880,000
Kayu Usuk Plafond m 1,100 5,000 5,500,000
Calsiboard buah 30 80,000 2,400,000
TOTAL POINT IV 33,820,000
V PEKERJAAN INSTALASI LISTRIK
Sekring box unit 1 77,750 77,750
Lampu LED 20 W bh 11 65,000 715,000
Titik Lampu bh 11 45,000 495,000
Stop Kontak bh 6 25,000 150,000
Saklar Doubel bh 4 25,000 100,000
Saklar Tunggal bh 5 25,000 125,000
Pemasangan Listrik Ls 1 1,225,000 1,225,000
TOTAL POINT V 2,887,750
VI PEKERJAAN PENGECATAN
Cat Tembok kg 100 30,000 3,000,000
Cat Plafond kg 30 30,000 900,000
Cat Kayu kg 5 65,000 325,000
TOTAL POINT VI 4,225,000
VII ONGKOS TUKANG Ls 20,000,000
TOTAL POINT VII 20,000,000
TOTAL POINT I + II +III + IV + V + VI + VII 100,000,000
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PLESTERAN
III PEKERJAAN PINTU JENDELA
IV PEKERJAAN LANTAI DAN PLAFOND
V PEKERJAAN INSTALASI LISTRIK
VI PEKERJAAN PENGECATAN
VII ONGKOS TUKANG
TOTAL

-
NO JENIS PEKERJAAN
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PLESTERAN
III PEKERJAAN PINTU JENDELA
IV PEKERJAAN LANTAI DAN PLAFOND
V PEKERJAAN INSTALASI LISTRIK
VI PEKERJAAN PENGECATAN
VII ONGKOS TUKANG
TOTAL

-
BIAYA
1,500,000
28,980,000
22,531,000
42,375,000
3,564,000
6,050,000
25,000,000
130,000,000
BIAYA
500,000
19,665,000
18,902,250
33,820,000
2,887,750
4,225,000
20,000,000
100,000,000