7.12528034E-06 7.95603544E-07 0.0001132632 highest lowest diff SS MS F P 29401.8666667 14700.9333333 79.1696984203 0 5013.6 185.688888889 34415.4666667
Tukey-Kramer Bonferroni Fisher LSD
q P t P P Range Min 11.5567677076 2.7139426E-05 8.1718688146 2.6741043E-08 8.9136811E-09 37.295569969 17.4975960874 2.713726E-05 12.3726688478 3.6860231E-12 1.2286744E-12 62.895569969 5.9408283798 0.0007469224 4.2008000332 0.0007790449 0.0002596816 13.095569969 Range Max 62.304430031 87.904430031 38.104430031 Nov 2016 Dec 2016 Jan 2017 Activity/ Task 12 19 26 3 10 17 24 31 7 14 21 Site Analysis and Sample Collection Enrichment culture Isolation of Pure Cultures Characterization of Pure Cultures Molecular Identification of Isolates Optimization of pH and Biodegradation Assay Statistical Analysis Finalization of write up Jan 2017 Feb 2017 March 28 4 11 18 25 4 11 18 Estimated Cost: Media 8000 Apparatus (Petri plates, etc.) 2000 Sequencing 10000 (1000 per isolate) Transportation 2000 Total 22,000 0 per isolate)