Anda di halaman 1dari 1

Paper No.

668

5. Introduction of bi-directional 5.2 Advantages


vertical static pile load 5.2.1 Economical
testing for optimising cost
and construction period 5.2.2 No additional reaction system required
Bhandra-Worli sea link project – Mumbai – the 5.2.3 It is absolutely safe compared to all other
1st project to be introduced for Bi-directional pile similar systems.
load testing. Length of the piles reduced by 50% of 5.2.4 We can measure side shear and end bearing
their design length totally saving of 500m of pile separately which is an important feature.
length by using Bi-directional pile load testing.
5.2.5 Extremely high capacity piles can be tested,
The cost and time saving is proportional and
beyond 35000 MT.
testing technology was introduced effectively and
efficiently. Same is the phenomenon wherever this 5.2.6 This method can be used for drilled shafts
method is used. or cast-in-situ piles, driven piles, steel piles and
Fig. 5 shows typical section of bi-directional static also for barrettes.
testing arrangement. 5.2.7 Very useful where space constraints like
urban area’s specially CBD area’s.
5.2.8 It can be used in flowing rivers or still back
waters of dams.
5.2.9 It is a boom for Metro-rail construction as
space available at middle or side of road is very
restricted.
5.2.10 The results need to be read in conjunction
with clause 709.2, 709.3 & 709.4 of IRC:78-2014
also with respect to IS-2911-Part-IV-2013.
5.2.11 This method can be used for initial as well
as routine piles.
5.2.12 This test is much faster compared to other
static tests.
5.3 Cost and Construction Time of the Pile
Foundations Reduced by Reducing
Uncertainty – Few Case Studies
Fig. 5 Bi-directional Static Load Test 5.3.1 Using this method designs of pile foundations
5.1 Infrastructure activities in the country are on can be optimised for
a rapid pace and higher capacity piles are being a) Reduced length
used. Mono piles meaning one pile per pier instead b) Reduced diameter
of group of piles is also being practiced. Diameters c) Reduced in no. of piles
of piles have exceeded 2.00m, which can carry 5.3.2 Reduced cost and construction time
more than 1000MT of vertical load. Initial pile
load tests will have to be carried out before start 5.4 Few Case Studies to Supplement
of project for the purpose of design and approvals. 5.4.1 Case Study -1
Typically piles having design load capacity of
Bandra – Worli Sea Link – Mumbai;
1500MT, initial pile test shall be carried out for
3750 MT and routine pile test to be carried out for At the main pylon, based on Bi-directional pile
2250 MT. In the present system of pile load testing, load test results, pile lengths were shortened to
usage of such heavy loads is not possible needing approximately one-half length i.e., 50% reduction
introduction of bi-directional pile load testing. resulting in more than 500 m pile length.

76 Journal of the indian Roads Congress, July - September, 2017