The document discusses the advantages of bi-directional static pile load testing, which allows for testing of extremely high capacity piles in a safe and cost effective manner. It reduces construction time and costs by optimizing pile foundation design through shortened pile lengths and diameters based on test results. A case study on the Bandra-Worli Sea Link project in Mumbai is presented, where bi-directional testing resulted in a 50% reduction in pile length, saving over 500 meters of pile.
The document discusses the advantages of bi-directional static pile load testing, which allows for testing of extremely high capacity piles in a safe and cost effective manner. It reduces construction time and costs by optimizing pile foundation design through shortened pile lengths and diameters based on test results. A case study on the Bandra-Worli Sea Link project in Mumbai is presented, where bi-directional testing resulted in a 50% reduction in pile length, saving over 500 meters of pile.
The document discusses the advantages of bi-directional static pile load testing, which allows for testing of extremely high capacity piles in a safe and cost effective manner. It reduces construction time and costs by optimizing pile foundation design through shortened pile lengths and diameters based on test results. A case study on the Bandra-Worli Sea Link project in Mumbai is presented, where bi-directional testing resulted in a 50% reduction in pile length, saving over 500 meters of pile.
vertical static pile load 5.2.1 Economical testing for optimising cost and construction period 5.2.2 No additional reaction system required Bhandra-Worli sea link project – Mumbai – the 5.2.3 It is absolutely safe compared to all other 1st project to be introduced for Bi-directional pile similar systems. load testing. Length of the piles reduced by 50% of 5.2.4 We can measure side shear and end bearing their design length totally saving of 500m of pile separately which is an important feature. length by using Bi-directional pile load testing. 5.2.5 Extremely high capacity piles can be tested, The cost and time saving is proportional and beyond 35000 MT. testing technology was introduced effectively and efficiently. Same is the phenomenon wherever this 5.2.6 This method can be used for drilled shafts method is used. or cast-in-situ piles, driven piles, steel piles and Fig. 5 shows typical section of bi-directional static also for barrettes. testing arrangement. 5.2.7 Very useful where space constraints like urban area’s specially CBD area’s. 5.2.8 It can be used in flowing rivers or still back waters of dams. 5.2.9 It is a boom for Metro-rail construction as space available at middle or side of road is very restricted. 5.2.10 The results need to be read in conjunction with clause 709.2, 709.3 & 709.4 of IRC:78-2014 also with respect to IS-2911-Part-IV-2013. 5.2.11 This method can be used for initial as well as routine piles. 5.2.12 This test is much faster compared to other static tests. 5.3 Cost and Construction Time of the Pile Foundations Reduced by Reducing Uncertainty – Few Case Studies Fig. 5 Bi-directional Static Load Test 5.3.1 Using this method designs of pile foundations 5.1 Infrastructure activities in the country are on can be optimised for a rapid pace and higher capacity piles are being a) Reduced length used. Mono piles meaning one pile per pier instead b) Reduced diameter of group of piles is also being practiced. Diameters c) Reduced in no. of piles of piles have exceeded 2.00m, which can carry 5.3.2 Reduced cost and construction time more than 1000MT of vertical load. Initial pile load tests will have to be carried out before start 5.4 Few Case Studies to Supplement of project for the purpose of design and approvals. 5.4.1 Case Study -1 Typically piles having design load capacity of Bandra – Worli Sea Link – Mumbai; 1500MT, initial pile test shall be carried out for 3750 MT and routine pile test to be carried out for At the main pylon, based on Bi-directional pile 2250 MT. In the present system of pile load testing, load test results, pile lengths were shortened to usage of such heavy loads is not possible needing approximately one-half length i.e., 50% reduction introduction of bi-directional pile load testing. resulting in more than 500 m pile length.
76 Journal of the indian Roads Congress, July - September, 2017