ADHUNIK POWER AND NATURAL RESOURCES LIMITED

ENERGY MANAGEMENT FLASH REPORT 7-Aug-15


Unit # 1 Unit # 2 Running Hours IMPORT
POWER CONSUMPTION Doc No - APNRL/IMS/F/En/PL/001
Sl No SYSTEM DESIGNED DESIGNED (1
DESIGNED RATED ACTUAL DIFF. REMARKS
(2 UNITS) UNIT)

(MW/HR) (MW/DAY) (MW/DAY) (MW/DAY) (MW/DAY) %

I BOILER # 1 6.416 153.973 153.973 121.237 122.556 1% UNIT#1 LOAD 74.4%

1 FD FAN 0.706 16.938 16.938 11.460 11.211 -2% Running Hr 24


2 PA FAN 1.397 33.534 33.534 29.753 33.400 12% As per U1 PG Test conducted

3 ID FAN 2.711 65.070 65.070 45.863 46.809 2% As per U1 PG Test conducted

4 MILLS 1.522 36.517 36.517 32.827 29.261 -11% As per U1 PG Test conducted

II BOILER # 2 6.416 153.973 122.874 122.582 0% UNIT#2 LOAD 75.4%


1 FD FAN 0.705 16.920 11.615 10.932 -6% Running Hr 24
2 PA FAN 1.397 33.528 30.154 35.437 18% Same as Unit 1

3 ID FAN 2.711 65.064 46.483 46.067 -1% Same as Unit 1

4 MILLS 1.521 36.504 33.270 29.101 -13%


Vac. Pump, DMCW, DMCWBP, Seal Oil P/p,
III TURBINE # 1 7.798 187.152 187.152 139.206 153.132 10%
GSC Exh. Combined consumption 350KWHr.
1 BFP 6.748 161.952 161.952 120.462 130.595 8% As per U1 PG Test conducted
Power consumption @505 KW X 1 at full
2 CEP 0.650 15.600 15.600 11.604 13.525 17%
load, as per manual
IV TURBINE # 2 7.798 187.152 141.087 149.989 6%
1 BFP 6.748 161.952 122.089 128.158 5% Same as Unit 1

2 CEP 0.650 15.600 11.760 13.638 16% Same as Unit 1

V ESP # 1 0.733 17.592 17.592 13.085 12.345 -6% From PG Report

VI ESP # 2 0.733 17.592 13.262 13.773 4% From PG Report

VII CHP 1.340 16.080 12.864 17.532 12.707 -28%


1 CONVEYOR 4A/B 1.685 1.449 -14% Rated consumption calculated as
2.789KW/MT of coal conveying based on
2 CONVEYOR 6A/B 0.930 0.885 -5%
avg. reading of Jan-Jun'14
3 CONVEYOR 8A/B 2.125 1.800 -15%
4 CRUSHER 1.955 1.724 -12%
VIII AHP 1.521 36.513 22.105 38.928 29.218 -25%
Rated consumption calculated as
1 CONV. AIR. COMP. 0.680 8.160 4.080 12.763 11.548 -10%
13.39KW/MT of Ash conveying based on
2 DRY ASH SYSTEM 0.000 25.932 29.305 13% avg. reading of Jan-Jun'14
Actual consumption after deduction of
3 BOT ASH HANDL PUMP 0.000 0.000 3.390 3.017 -11%
Lighting load
4 WET ASH SYSTEM 0.000 0.000 13.053 3.713 -72%
IX COOLING SYSTEM 8.364 200.736 100.368 164.736 201.988 23%
1 CT 1.200 28.800 14.400 28.800 30.302 5% 1.063MW for ILLUMINATION
Power consumption @1500 KW X 4 at full
2 CW 6.000 144.000 72.000 108.000 147.803 37%
load, as per manual
Power consumption @582 KW X 2 at full
3 ACW 1.164 27.936 13.968 27.936 23.883 -15%
load, as per manual
X WATER SYSTEM 0.360 8.640 8.076 11.903 6.898 -42%
1 RW PLANT 0.175 4.200 4.200 5.873 2.126 -64% FIRE PUMP = 1750 KW/DAY

2 PT PLANT 0.138 3.312 3.312 3.290 2.980 -9% 0.373MW for ILLUMINATION

3 DM PLANT 0.047 1.128 0.564 2.740 1.792 -35% AC SYSTEM - 1.7 MW/DAY

XI OTHERS 5.924 106.175 57.152 90.396 80.563 -11%


Power consumption @660 KW X 2 at full
1 COMPRESSOR 1.056 25.344 12.672 25.344 23.669 -7%
load, as per manual
2 FOPH 1.650 3.600 1.800 1.800 0.096 -95% UNLOADING - 15 KW; TRANSFER - 75 KW
COMP - 5.5; DM WATER P/P - 0.75; O2 &
3 H2 GEN. PLANT 0.013 0.300 0.300 0.486 0%
H2 LYE TRANSFER P/P 2.2 KW; VACUUM
Rated consumption taken as avg. reading
4 ILLUMINATION 0.165 3.950 3.950 3.950 4.414 12%
from Nov. to April
5 EMCC UNIT # 1 0.086 2.070 2.070 2.070 2.850 38%
6 EMCC UNIT # 2 0.075 1.810 1.810 1.810 2.627 45%
Transformer loss showing incorrect
7 POWER TRANS 2.269 54.461 27.230 40.782 30.000 -26%
reading
8 SERVICE TRANS 0.610 14.640 7.320 14.640 16.421 12% Power consumed by running unit

TOTAL 47.40 1085.58 559.28 874.25 905.75 905.75 9.33%


8.78% 8.38% 8.63% 9.01% 9.38% TARGET POWER CONS. 9.06%

Aux. Consumption as per UT & ST reading (Incl. Transformer loss) 910.00 AVG. STATION LOAD 74.88%

Note: - Design consumptions for each system computed for full load running (24 Hours). Rated consumption is the least power required at actual load.