SOP
DOC REF NO APNRL/IMS/SOP/OP/001/17 REV 0 DATE OF ISSUE
RESPONSIBILITY MECHANICAL-OPERATION
PURPOSE OPERATION OF HYDROGEN GENERATION PLANT PAGE 0
02 Nos. of skids are provided for the plant, usually one in running & one in standby. Plant check
points, Start-up, Shut Down, and Emergencies are covered up in this SOP.
(NOTE: Hydrogen gas is highly flammable and will burn in air at a very wide range of
concentrations)
Page | 1
1. All electrical feeders must in ON condition.
2. Separator skid temperature should not increase more than 75°C.
3. Separator skid pressure should not increase more than 18 kg.
4. ON chiller before transferring gas to purification chamber.
In case of Emergency –
1. Open H2 & O2 vent valve from SCADA by clicking particular valve, Indicator will turn from
red to green.
2. Convert Auto mode from manual mode of H2 & O2 control valve.
3. Submit average value of both level separators in dialog box provided in H2 & O2 mimic.
4. Power ON the feeder of H2 & O2 lye pump from MCC panel.
5. Give start command to both H2 and O2 Lye pump from H2 & O2 separator mimic.
6. After checking all interlocks of rectifier at electrolyser mimic, start rectifier from SCADA.
7. Follow the following parameters at electrolyser screen and H2 & O2 separator screen.
O2 Pressure Rectifier Current
1 50
1 100
2 150
2 200
- -
- -
15 500
16 600
(Set value 19 ˂ Trip) (Set value 800 ˂ Trip)
Page | 2
3. Close H2 vent valve of separator section and send it (H2 Gas) to purification system by
opening H2 Purification valve
4. Open H2 separator vent valve to maintain pressure & level of H2 & O2 level in separator.
5. Wait to achieve at least 10 kg pressure in purification system & Temp. at least 65°C in H2
separator only.
6. After achieving purity (i.e Trace O2: 30 ppm & Dew point: -63°C to -65°C) start filling
buffer tank upto 16 kg pressure (25 to 30 Min. required for filling of buffer tank).
Compressor Start-up –
16 600
15 500
14 450
- -
- -
0 0
(Stop rectifier unit)
7. Maintain the level (Trip at mini. 150 & max. 900 mmWC) of H2 - O2 separator by placing
avg. value in the dialogue box.
8. Open H2 - O2 gas control valve to 100% by changing it from Auto to manual from SCADA.
9. Let the plant come to gravity (i.e H2 - O2 Level should be approx. same.)
Page | 3
10. Power off H2 - O2 lye circulating pump.
11. Again let the plant to achieve gravity level.
12. Close all vent valves.
13. Turn of PC.