Anda di halaman 1dari 4

Lifting and Hoisting Plan

LOCATION: AREA:

POOC OPL 273 – EPF FACILITY OWA - ALIDINMA


PERMIT NUMBER: RISK ASSESSMENT NUMBER:

TBA NA
LIFTING PLAN NUMBER: TECHNICAL REVIEW:

FODE LP-002 NA

DESCRIPTION OF LIFTING OPERATION:

The Lifting operation involves a simple routine lift of using a forklift to lift materials from a
container/caravan and set down in designated set point or lay down area.

IS SKETCH OF LIFTING OPERATION ENCLOSED:

No * Yes

CATEGORISATION OF LIFTING AND HOISTING OPERATION:


Non-Routine Non-Routine
Routine Non-Routine Simple complicated complex/critical
or basic

WEIGHT OF LOAD:
1.8tons
ASSESSED (Delete as appropriate)

LIFTING EQUIPMENT & ACCESSORIES TO BE USED (SPECIFY TYPE, SWL): COLOUR CODE: YELLOW

Lifting & Hoisting Plan Page 1 of 4


Lifting and Hoisting Plan

Forklift Information
fork length:
fork width:
make:
Model:
Inspection date:
Self weight of forklift:
SWL:
WLL

Load Configuration
Description:
Dimensions:
Load weight: 1.8tons
Rigging weight: NA
Ancillary Equip wt. : NA
Other weight: NA
Total weight: 1.8T
Fork/mast Height:
Sling Length: NA
Sling Type: NA

Setup Information
Tilt Angle:
Set up Distance:
ALL LIFTING OPERATIONS REQUIRE THE FOLLOWING TO BE CONSIDERED
BUT THIS LIST IS NOT EXHAUSTIVE
Weight, size, shape and centre of gravity of load Working under suspended loads
Method of slinging/ attaching/detaching the load Overturning /load integrity/need for tag lines
Availability of approved lifting points on load Environmental conditions including weather
Pre-use inspection of certified equipment only Experience, competence and training of personnel
Proximity hazards, obstructions, path of load Number of personnel required for task
Lifting over live equipment Communication requirements
Conflicting tasks in area Only certified and colour coded lifting equipment to be used
Area for setting up with outriggers fully extended Lighting in the pick-up and lay down area
Access and emergency escape routes Initial and final load positions & how it gets there

METHOD STATEMENT

Lifting & Hoisting Plan Page 2 of 4


Lifting and Hoisting Plan

1.Supervisor must ensure forklift to be use has current thorough examination report

2. Supervisor must carry out toolbox talk before works start, covering task to be carried out, personnel
involve, risk, work areas and exclusion zones.

3. Seat belt must always be worn at all times

4. Before lifting, operator should check ground conditions to ensure it’s suitable for them to drive in, the
operator should then lift the load approximately 150mm (6inches) to check the load position, weight and
balance.

5. If the operator is unable to see clearly the load final position, a banksman should be used to signal to the
operator when landing the load

6. Before lifting the load, the operator should step out and inspect the load- check for warning signs,
centre of gravity and loose materials

METHOD (S) OF COMMUNICATION TO BE USED


Radio √ Verbal √ Hand Signals
STEPS TAKEN TO ELIMINATE DANGER TO PERSONNEL INVOLVED AND OTHERS, INCLUDING BARRIERS WHERE
APPROPRIATE:

Lifting & Hoisting Plan Page 3 of 4


Lifting and Hoisting Plan

HAZARDS IDENTIFIED: CONTROLS PUT IN PLACE:

1 .Movement of load 1. Inspect load for loose object prior to lifting & secure/remove loose items

2. Communication failure 1. Hold toolbox talk/briefing for all party concerned


2. Agreed means of communication
3. Effective Supervision

3. Equipment failure 1. Ensure forklift has been adequately maintained, with current certificate
2. Ensure pre-use checks has been carried out

PLANNED BY
NAME: IDUSERI GEORGE SIGNATURE: DATE: 8/11/2016

APPROVED BY PERSON IN CHARGE (PIC)


NAME: NWABUDE ALEX SIGNATURE DATE 8/11/2016

REVIEWED BY1

NAME: ELENA MORARU SIGNATURE: DATE:

1. The competent person conducting the lift must carry out the review of the lifting plan.

TASK DESTAILS: (Use continuation sheet if required)

Individual
No.
Responsibility

Lifting & Hoisting Plan Page 4 of 4

Anda mungkin juga menyukai