The real alternative:
Field redevelopment solutions
As well pressure declines, oil and gas producers face Produce more, spend less
decreasing production and high OPEX, and eventually Siemens redevelopment solutions are fully integrated
have to abandon their field. In this scenario, Siemens’ platforms with a high level of automation to save labor
field development solutions offer a real alternative. costs on your site. At the same time, our solutions
These solutions address the most important challenges immediately increase production and allow you to meet
operators face every day: long-term supply obligations.
Additionally, our remote-controlled operation enables
Decreased production
higher security and raises safety to a higher level.
Unpredictable production
Manpower-intensive production Because Siemens’ solutions can be delivered as pre-assem-
Health, safety, and environmental risks bled containers and skids, they can be easily shipped
Theft of equipment and product and installed. You can also reuse the solution elsewhere
when a site reaches the final end of its life. This enables
Siemens’ field redevelopment solutions use innovative amortization of equipment over several assets and includes
technology that enables operators to boost production and all associated services and technologies needed for a com-
at the same time reduce production costs. With field re- plete solution.
development, they can extend the life cycle of a field and
improve production of valuable and scarce hydrocarbons.
This helps to meet overall production targets, and post-
pone the cost of field abandonment.
2
Different challenges – the right technologies
Mobile wellhead compression Depending on reservoir and well characteristics,
As a well’s gas pressure declines, the gas velocity a gas well with a depletion compressor can continue
often is not enough to transport produced liquids to produce gas for up to 10 years more.
upward through the production tubing. This is com- With that life span in mind, we developed our mobile
monly referred to as “liquid loading.” By compressing field redevelopment solution so that it can be reused
the gas near the wellhead, the wellhead pressure is at a second or even third production site. To make
decreased, which increases the production rate and disconnection, transportation and reinstallation
prevents liquid loading. Using a wellhead compressor as easy as possible, we integrate all functions into
can substantially extend the service life of your wells. a skid-mounted assembly that provides easy access
to all required interfaces.
3
s
Extra well potential with
wellhead compression
Free flow ...
Rate MSCFD
Wellhead Compression
Siemens Wellhead Compression
Extra production potential Percentage Critical flow rate
of Potential “Wet” Well Rate MSCFD
Well Life Dry Well Rate MSCFD
0
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Mobile water treatment and injection drilling operations, and for agricultural irrigation.
Siemens has developed a unique process that allows The process includes customized water treatment
waste fluids (such as pit water, produced water, and for any of these reuses – all of which have been tested
frac flowback fluids) to be reused for subsequent frac in our laboratories and proven in field applications.
jobs as a dust suppressant, for initial surface-hole
4
Integrated solutions from
a trusted technology partner
Vertical integration Horizontal integration
More than just equipment Multiple disciplines and technologies
Because of Siemens’ long-standing relationships with As a worldwide technology leader, Siemens offers
oil and gas producers, we understand the operator’s need customers a broad range of solutions. These include
for complete, single-source solutions. Our solutions are systems and capabilities such as:
fully integrated and include consultant services, risk man-
Instrumentation and control
agement, full project engineering, project management,
Power distribution and transmission
site preparation, installation, commissioning, and what-
Power and steam generation
ever is required for optimum hydro carbon production.
Pumping and compressor stations
Electrical, instrumentation, and control for pipelines
SCADA and enterprise intelligence systems
for complete plant management
Integrated concepts
When implementing new field redevelopment equipment development solutions can be tailored to the specific
operators may also need to upgrade related systems such requirements of entire site. We integrate all the compo-
as electrical grid or communication system. Siemens has nents required for automated, unmanned operation,
multidisciplinary experience to do that. Siemens field maximizing the value of mature fields.
Example of typical
field redevelopment
Field auto-
Water mation &
Treatment control
Communication
Concept
Water
re-injection
Engineering Electrical Depletion
assembly Grid compression
Site preparation
Installation
Service
5
Published by and copyright © 2012:
Siemens AG
Energy Sector
Freyeslebenstrasse 1
91058 Erlangen, Germany
Siemens AG
Energy Sector
Oil & Gas Division
Wolfgang-Reuter-Platz 4
47053 Duisburg, Germany
Printed on elementary chlorine-free bleached paper. Subject to change without prior notice.
The information in this document contains general
All rights reserved.
descriptions of the technical options available, which
Trademarks mentioned in this document
may not apply in all cases. The required technical
are the property of Siemens AG, its affiliates,
options should therefore be specified in the contract.
or their respective owners.