Anda di halaman 1dari 9

SAP S/4HANA for Management Accounting Associates (SAP

C_TS4CO_1610
Cut Sco 47.2 59%
Topic % Question
Course
Cost Center Accounting > 12% 12 S4F22
Internal Orders % - 12% 11 S4F22
General Controlling % - 12% 11 S4F22
Product Cost Planning > 12% 12 S4F23
Cost Object Controlling > 12% 12 S4F25
Profit Center Accounting
% - 12% 10 S4F28
Profitability Analysis > 12% 12 S4F29
80
S4F20
ANA for Management Accounting Associates (SAP
S/4HANA 1610)

Description
SF422 - Cost Center and Internal Order Accounting
SF422 - Cost Center and Internal Order Accounting
SF422 - Cost Center and Internal Order Accounting
S4F23-Product Cost Planning
S4F25 - Cost object controlling

S4F28 - Profit Center Accounting


S4F29 - Profitability Analysis

S4F20 - Business Process in Management Accounting


1 admin section of costing run 2 answers
a costin varinat
b costing version
c
d
2 currency analysis in management accounting for inter 3
a company code
b object
c control
d controlling
e reference
3 what is not possible to enter at the time of dummy PC
a validity date
b controlling area
c segment
d group
4 std cost hierarcgy is created
a at the time of creating cost cneter
b
c
d
5 transfer price is activated at
a controling area
b valuation area
c profit center
d
6 predefned characterstics 3
a contro area
b plant
c company code
d
7 predefine value fields
a sales
b qty
c
d
8 prerequ for POC method in result analysis
a cost of order
b running result analysis
c billing of production
d
9 period end closing at profit center
a distribution
b
c
d
### sequencing a distribution cycle after existing cycle
a iteration in both the cycle
b maintin both in the same cycle
c iteration in the new cycle
d
### target costing uses 3
a plant
b actual
c std estima
d alternative
### costing run uses
a plan price
b commericla
c tax price
d current cost
### result analysis steps
a result analysis version
b result analysis category
c result analysis cost element
d result analysis method
### how u assign wip to FI in s/4 hana
a assign 2 gl accuounts for each RA cost element
b
c
d
### cost center group vs order group
a any number of level
b different controlling area internal order under one group
c
d
### dynamic order group
a assign version to the lowest category
b
c
d
### actual price calculation is posisble for 3
a internal order
b cost center
c wbs
d
### advantage of assessment
a can be reversed many times
b very fast performance
c
d
### one source many receiver
a source structure
b allocation strcutue
c PA structure
d
### reuse of costing estimates
a group costing
b trsfr control
c group costing
d
### qty based og=h rqe
a qty record in cost element
b
c
d
### same material difft estimates
a costing version
b cost variant
c valuation variant
d
### diff bet reposting with manual 2 answers
a validity check
b refernce to fi document
c multiple receiver is possible
d fi doc is adjusted
### possibility of prod order with valuated stock
a
b
c
d
### cost component is assigned to
a qty structure
b valuation variant
c costing variant
d
### when produ order cost trsfd to sales order in MTO
a when sales order created
b when it is settled
c
d
### pc at what level
a controlling area
b
c
d
### top node in reporting
a operating concern
b
c
d
### 2 same pc code same validity dates 2
a 2 different controlling area
b 2 difft client
c
d
### what is maintained in ass cycle
a allocation structure
b
c
d
### availabilty control when
a pur req
b goods issue
c invoice
d pymt
### order type budget profile controls
a budget manager
b availability control
c number range
d screen variant for entry
### different optiond for cost center plan
a co versions
b
c
d
### activity type master
a cost element
b cost center categories
c inter order type
d atyp category
### cost componennt trsfd to analyse
a cogs
b cogm
c
d
### cration of report mandatory 3
a library
b report group
c table
d character
### planning layout column 3
a value column
b charcatert
c key figure
d formula
### Tiles entry contreolled by
a tiles group
b app group
c
d
### cost sheet
a rate
b cal base
c send cost object
d
### when % of completion is used
a indirect activity allocation & OH rate isnot available
b indirect activity allocation & OH rate is available
c direc activty and cost element is not availble
d
### multilevel costing with out qty strcuture what is req
a material with costing view and BOM
b material with costing view and BOM and routing
c material with costing view
d
### what facilitates final costing 2 answers
a wip calcualton
b overhead
c settlement
d template
### costin run analysis
a material list reports
b costing level
c analysis report
d
### OH costin sheet asisgned in
a valuation variant
b
c
d
### extranl settlemen
a Fixed assest
b wbs
c cost center
d internal order
### costing variant contains 2 answers
a
b costing type
c valuation variant
d
### sales actual transaction posting in s/4 hana contained in
a ce1XXXXX
b ACDOCA
c ACDOCP
d
### PC level report in doc split acheidved through
a mandatory
b zero balance
c
d
### cogs of costing object are reported at
a profit center
b segment
c cost center
d cost element
### transfer of sales plan to copa 2
a manual
b transfer of gl
c top down
d bottom up
### what is trsfd to costing based COPA
a sales order
b billing
c scheduling agreement
d
### operating concern uses currency 2
a controlling
b company code
c operating concenr
d group
### what sales are trsfd to co copa but not accco based COpa
a sales order
b delivery
c journal voucher
d
### in sales cycle pc is defaulted at
a sales order level
b
c
d
### if pc not availble at network activity, it is picked up from
a wbs element
b dummy PC
c
d
### link of GL master to cost element is
a account type
b
c
d
### planning can be done for 3 answers
a SKF
b cost elemnent
c non operative cost element
d activities
### different ways of allocation of cost center is
a maintaing in same segment with different allo rules
b different segment different rules
c reposting and maintaining in segments
d
###
a
b
c
d
###
a
b
c
d
###
a
b
c
d
###
a
b
c
d
###
a
b
c
d
###
a
b
c
d

Anda mungkin juga menyukai