PROJECT : 3-STOREY APARTMENT

Location : Manila

CFA 605.00
COST SUMMARY
CSI Division DIVISIONS Currency TOTAL COST Cost/m2 % Wt

MAIN BUILDING

01000 PRELIMINARIES Php 1,330,342.62 2,198.91 10.50%

02000 SITE CONSTRUCTION Php 199,332.76 329.48 1.57%

03000 CONCRETE Php 2,954,010.31 4,882.66 23.31%

04000 MASONRY Php 2,855,653.86 4,720.09 22.53%

05000 METALS Php 793,221.16 1,311.11 6.26%

07000 MOISTURE AND THERMAL PROTECTION Php 16,978.92 28.06 0.13%

098000 DOORS AND WINDOWS Php 460,765.26 761.60 3.64%

09000 PAINTING Php 1,821,282.14 3,010.38 14.37%

01300 MPF Php 998,597.17 1,650.57 7.88%

01600 ELECTRICAL Php 1,244,356.45 2,056.79 9.82%

TOTAL PROJECT
PHP 12,674,540.65 20,949.65 100.00%
COST

Prepared by:

L&Z Builders

Engr. Jan Michael M. Laforteza

Engr. Ismael Zacaria