Location : Manila
CFA 605.00
COST SUMMARY
CSI Division DIVISIONS Currency TOTAL COST Cost/m2 % Wt
MAIN BUILDING
TOTAL PROJECT
PHP 12,674,540.65 20,949.65 100.00%
COST
Prepared by:
L&Z Builders