Project Name:
Building Square Footage: 198
Date of Estimate:
Anticipated Construction Start:
Anticipated Construction Finish:
PROJECT TOTAL 0 0
This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.
PROJECT SUBTOTAL 0 0 0 0
99 MISC. 0
99010 - CONTINGENCY 99011 - DESIGN CONTINGENCY 0
99012 - ESCALATION (See Next Line) 0
Include $ amt, %, and construction start date 0
SUBTOTAL CONTINGENCIES 0 0 0 0
PROJECT SUBTOTAL 0 0 0 0
99030 - CONSTRUCTION 99031 - CM / GC GENERAL CONDITIONS 0
MANAGER 99032 - CM / GC PERSONNEL 0
99033 - CM FEE / GC PROFIT 0
SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION 0 0 0 0
PROJECT SUBTOTAL 0 0 0 0
99040 - CONSTRUCTION 99041 - CONSTRUCTION CONTINGENCY 0
MANAGER 99042 - PRECONSTRUCTION SERVICES 0
SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION 0 0 0 0
PROJECT SUBTOTAL 0 0 0 0
99050 - ALLOWANCES 99055 - CHILLED WATER CONNECT. FEE ALLOW. 0
99056 - SIDEWALK CLOSURE ALLOWANCE FOR AA 0
SUBTOTAL ALLOWANCES 0 0 0 0
PROJECT SUBTOTAL 0 0 0 0
99090 - ALTERNATES 99091 - ALTERNATE #1
99091A - DESCRIPTION #1 0
99091B- DESCRIPTION #2 0
99091C - CONTINGENCY 0
SUBTOTAL ALTERNATE #1 0 0 0 0
99092 - ALTERNATE #2
99092A - DESCRIPTION #1 0
99092B- DESCRIPTION #2 0
99092C - CONTINGENCY 0
SUBTOTAL ALTERNATE #2 0 0 0 0
PROJECT SUBTOTAL 0 0 0 0
PROJECT TOTAL 0 0 0 0
This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.