BAR BENDING SCHEDULE

Total
Sl. Dia Spacing Length Unit TOTAL
Description No. Shape of the Bar Length of Bar (in mm.) Length Dia of Bars (in mm.)
No. (mm.) (mm.) (mtr.) Weight WEIGHT
(mtr.)
a b c d e 8Ø 10 Ø 12 Ø 16 Ø 20 Ø 25 Ø
MAIN BOTTOM
1 10 250 14 b d 0.15 1.4 0.15 1.70 23.80 0.617 14.68 0.00 14.68 0.00 0.00 0.00 0.00
Bothways B1

MAIN TOP Bothways


2 10 250 14 b d 0.15 1.4 0.15 1.70 23.80 0.617 14.68 0.00 14.68 0.00 0.00 0.00 0.00
B2

3 VERTICAL 12 8 a b c 0.3 1.67 1.970 15.76 0.888 13.99 0.00 0.00 13.99 0.00 0.00 0.00

4 STIRRUPS 8 0.19 10 0.416 0.416 0.416 0.416 0.16 1.824 18.24 0.395 7.20 7.20 0.00 0.00 0.00 0.00 0.00

5 STIRRUPS 8 0.19 10 b d 0.302 0.302 0.302 0.302 0.16 1.368 13.68 0.395 5.40 5.40 0.00 0.00 0.00 0.00 0.00

TOTAL STEEL 55.97 12.61 29.37 13.99 0.00 0.00 0.00


CONTRACTOR’S CHECKLIST

1. Description of Work

(a) Plans

(b) Specifications

(c) Contractor's Qualifications and Exclusions

2. Design-Bid-Build vs. Design-Build-Owner needs third party beneficiary rights to plans


and specifications

3. Status of Plans

(a) Completed

(b) Fast Track

(c) Design-Build Elements

4. Commencement Date

(a) Notice to Proceed

(b) Affidavit of Commencement

(c) Other Conditions For Commencement of Work

5. Contract Sum

(a) Stipulated Sum Arrangement

(b) Cost of the Work plus Fee with no GMP

(c) Cost of Work plus Fee with GMP

(d) Other Arrangements

(e) Allowances

6. Cost of the Work

(a) Modifications to Eliminate Duplicate Costs

(b) Costs Must be Reasonable

(c) Exclude costs arising out of Contractor's or Subcontractor's Negligence or Breach


of Agreement

999200 000003 11051476.1 Page 1 of 5


(d) Other Standard Exclusions From Cost

7. Completion Dates

(a) Entire Project

(b) Phased Completion

(c) Early Occupancy By Owner/Tenants

(d) Liquidated Damages

(e) Bonus

(f) Final Completion Requirements

(g) Affidavit of Completion

8. Retainage

(a) Initial Retainage – 10% or other percentage

(b) Reduction of Retainage

(c) Items excluded from Retainage

(d) Owner’s Right to Increase Retainage if Defective Work Occurs or Other


Contractor Defaults

9. Payments

(a) Conditions for Progress Payments

(b) Conditions for Final Payment - All Governmental Approvals; Completion of


Punchlist Items; Final Lien Waivers; Satisfaction of Close-Out Procedures;
Receipt by Owner of As-Built Survey; Receipt by Owner of As-Built Plans; Other
items reasonably required by the Lender or Owner

10. Insurance

(a) Owner's Responsibility

(b) Contractor's Responsibility

(i) Builder's Risk Insurance

(ii) Completed Operations Coverage

(iii) Commercial General Liability Coverage

999200 000003 11051476.1 Page 2 of 5


(iv) Worker's Compensation Coverage

(v) Proof of Coverage

(vi) Additional Insured Status/Waiver of Subrogation for Owner

(vii) Limits of Coverage

(viii) Professional Liability Coverage

(ix) Owner's Controlled Insurance Program/Contractor's Control of Insurance


Program

(x) Review Form of Policy and Endorsements with Consultant

11. Warranties

(a) 1 year from Substantial Completion

(b) 1 year from Final Completion

(c) Extended Warranties

(d) Exclusions from Warranties

12. Design Specifications versus Performance Specifications

13. Force Majeure Delays

(a) Generally

(b) Exclusion Period

(c) Adverse Weather Definition

(d) Specific Conditions Relating to Unions

(e) Shortages of Labor and Materials

(f) Other Special Conditions

14. Special Construction Procedures

(a) Hazardous Materials Concerns

(b) Soil Issues

(c) Rock/Underground Utility Issues

999200 000003 11051476.1 Page 3 of 5


15. Subcontracts

(a) Right of Owner to Approve Subcontractors and Subcontract Form

(b) Right of Owner to Take Assignment of Subcontracts and Purchase Orders

16. Owner-Furnished Items

(a) Owner's Installation Responsibility

(b) Contractor's Installation Responsibility

17. Mutual Waiver of Consequential Damages

(a) Liquidated Damages Carve-Out

(b) Other Carve-Outs

18. Separate Contractors- Coordination Issues

19. Role of Architect in Construction Administration

(a) Progress/Final Payment Approval

(b) Other Approval/Disapprovals Relating to Work

(c) Eliminate Architect's Initial Resolution of Disputes

20. Change Orders

(a) Construction Change Directives

(b) Contractor's Obligation to Perform

(c) Procedures for Determining Cost of Change Orders

(d) Profit/Overhead Percentage to Apply to Change Orders

21. Alternative Dispute Resolution

(a) Dispute Proceedings by Executives

(b) Mediation

(c) Arbitration- Dollar Limits/Warranty Issues

(d) Mediation/Arbitration Procedures

(e) International Considerations Pertaining to Enforcement of Arbitration Award

999200 000003 11051476.1 Page 4 of 5


22. Termination for Convenience

(a) Owner's Right to Terminate

(b) Owner's Payment Obligations to Contractor

(i) Payment for Work Performed

(ii) Assignment of Subcontracts and Purchase Orders

(iii) Payment of Specified Percentage of Profit on Work not Performed

23. Lender Required Provisions - Subordination/Collateral Assignment

24. Issues Relating to Construction of Condominiums

(a) Limitation of Owner’s Right to Assign Warranties to HOA

(b) Limitations on Warranties

(c) Owner’s Right to Assign Contract -- pre- and post-completion