0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
92 tayangan1 halaman
This document discusses pipe stress analysis for a pipe support. Pipe support number 3 originally had a 10mm lift off but may settle by 50mm, resulting in the pipe resting on the support steel. The support is designed to have an 8mm gap under normal conditions, but may contact the steel if the area settles.
This document discusses pipe stress analysis for a pipe support. Pipe support number 3 originally had a 10mm lift off but may settle by 50mm, resulting in the pipe resting on the support steel. The support is designed to have an 8mm gap under normal conditions, but may contact the steel if the area settles.
This document discusses pipe stress analysis for a pipe support. Pipe support number 3 originally had a 10mm lift off but may settle by 50mm, resulting in the pipe resting on the support steel. The support is designed to have an 8mm gap under normal conditions, but may contact the steel if the area settles.
Used settlement value Used settlement value by -10
No. Type Lift off mm base on pipe support 3 Rest 10 mm. by -50 mm base on pipe support No. 3 have lift off 8 mm from top of have 10 mm gap steel in case normal between bottom of condition but in case pipe with top of pipe settlement at field it rest on support steel steel