LABOUR PRODUCTIVITY

EL-Electrician SE-Senior Electrician WF-Working Foreman


Note: AE-Asst. Electrician CJ-Cable Jointer TL- Team Leader
HL-HELPERS EF- Electrical Fitter
OIL FIELD
SLNO ACITIVITY UNIT
OUT PUT REQ MANPOWER
1 CABLE LAYING
1.1 Direct Burried
1.1.1 Armoured Cable - Straight
1.1.1.1 4C x 4 Sq.mm & Below LM 2000 1EL + 3 AE/HL 500.0
1.1.1.2 4C x 6 Sq.mm to 16 Sq.mm LM 1800 1EL + 3 AE/HL 450.0
1.1.1.3 4C x 25 Sq.mm to 50 Sq.mm LM 800 1EL + 3 AE/HL 200.0
1.1.1.3 4C x 70 Sq.mm to 95 Sq.mm LM 400 1EL + 3 AE/HL 100.0
1.1.1.3 4C x 120 Sq.mm to 150 Sq.mm LM 100 1EL + 3 AE/HL 25.0
1.1.1.3 4C x 185 Sq.mm to 240 Sq.mm LM 90 1EL + 3 AE/HL 22.5
1.1.1.3 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 60 1EL + 3 AE/HL 15.0

1.1.2 Armoured Cable - 1Bend/500LM


1.1.2.1 4C x 4 Sq.mm & Below LM 1900 1EL + 3 AE/HL 475.0
1.1.2.2 4C x 6 Sq.mm to 16 Sq.mm LM 1710 1EL + 3 AE/HL 427.5
1.1.2.3 4C x 25 Sq.mm to 50 Sq.mm LM 760 1EL + 3 AE/HL 190.0
1.1.2.4 4C x 70 Sq.mm to 95 Sq.mm LM 380 1EL + 3 AE/HL 95.0
1.1.2.5 4C x 120 Sq.mm to 150 Sq.mm LM 95 1EL + 3 AE/HL 23.8
1.1.2.6 4C x 185 Sq.mm to 240 Sq.mm LM 85 1EL + 3 AE/HL 21.3
1.1.2.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 57 1EL + 3 AE/HL 14.3

1.1.3 Armoured Cable - 2 Bend/500LM


1.1.3.1 4C x 4 Sq.mm & Below LM 1672 1EL + 3 AE/HL 418.0
1.1.3.2 4C x 6 Sq.mm to 16 Sq.mm LM 1505 1EL + 3 AE/HL 376.2
1.1.3.3 4C x 25 Sq.mm to 50 Sq.mm LM 669 1EL + 3 AE/HL 167.2
1.1.3.4 4C x 70 Sq.mm to 95 Sq.mm LM 334 1EL + 3 AE/HL 83.6
1.1.3.5 4C x 120 Sq.mm to 150 Sq.mm LM 84 1EL + 3 AE/HL 20.9
1.1.3.6 4C x 185 Sq.mm to 240 Sq.mm LM 75 1EL + 3 AE/HL 18.8
1.1.3.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 50 1EL + 3 AE/HL 12.5

1.1.4 Armoured Cable - 3 Bend/500LM


1.1.4.1 4C x 4 Sq.mm & Below LM 1221 1EL + 3 AE/HL 305.1
1.1.4.2 4C x 6 Sq.mm to 16 Sq.mm LM 1099 1EL + 3 AE/HL 274.6
1.1.4.3 4C x 25 Sq.mm to 50 Sq.mm LM 488 1EL + 3 AE/HL 122.1
1.1.4.4 4C x 70 Sq.mm to 95 Sq.mm LM 244 1EL + 3 AE/HL 61.0
1.1.4.5 4C x 120 Sq.mm to 150 Sq.mm LM 61 1EL + 3 AE/HL 15.3
1.1.4.6 4C x 185 Sq.mm to 240 Sq.mm LM 55 1EL + 3 AE/HL 13.8
1.1.4.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 37 1EL + 3 AE/HL 9.2

1.2 Through Cable Tray


1.2.1 Armoured Cable - Straight
1.2.1.1 4C x 4 Sq.mm & Below LM 1600 1EL + 3 AE/HL 400.0
1.2.1.2 4C x 6 Sq.mm to 16 Sq.mm LM 1400 1EL + 3 AE/HL 350.0
1.2.1.3 4C x 25 Sq.mm to 50 Sq.mm LM 400 1EL + 3 AE/HL 100.0
1.2.1.4 4C x 70 Sq.mm to 95 Sq.mm LM 200 1EL + 3 AE/HL 50.0
1.2.1.5 4C x 120 Sq.mm to 150 Sq.mm LM 128 1EL + 3 AE/HL 32.0
1.2.1.6 4C x 185 Sq.mm to 240 Sq.mm LM 60 1EL + 3 AE/HL 15.0
1.2.1.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 48 1EL + 3 AE/HL 12.0

1.2.2 Armoured Cable - 1Bend/25LM


1.2.2.1 4C x 4 Sq.mm & Below LM 1520 1EL + 3 AE/HL 380.0
1.2.2.2 4C x 6 Sq.mm to 16 Sq.mm LM 1330 1EL + 3 AE/HL 332.5
1.2.2.3 4C x 25 Sq.mm to 50 Sq.mm LM 380 1EL + 3 AE/HL 95.0
1.2.2.4 4C x 70 Sq.mm to 95 Sq.mm LM 190 1EL + 3 AE/HL 47.5
1.2.2.5 4C x 120 Sq.mm to 150 Sq.mm LM 122 1EL + 3 AE/HL 30.4
1.2.2.6 4C x 185 Sq.mm to 240 Sq.mm LM 57 1EL + 3 AE/HL 14.3
1.2.2.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 46 1EL + 3 AE/HL 11.4

1.2.3 Armoured Cable - 2 Bend/25LM


1.2.3.1 4C x 4 Sq.mm & Below LM 1338 1EL + 3 AE/HL 334.4
1.2.3.2 4C x 6 Sq.mm to 16 Sq.mm LM 1170 1EL + 3 AE/HL 292.6
1.2.3.3 4C x 25 Sq.mm to 50 Sq.mm LM 334 1EL + 3 AE/HL 83.6
1.2.3.4 4C x 70 Sq.mm to 95 Sq.mm LM 167 1EL + 3 AE/HL 41.8
1.2.3.5 4C x 120 Sq.mm to 150 Sq.mm LM 107 1EL + 3 AE/HL 26.8
1.2.3.6 4C x 185 Sq.mm to 240 Sq.mm LM 50 1EL + 3 AE/HL 12.5
1.2.3.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 40 1EL + 3 AE/HL 10.0

1.2.4 Armoured Cable - 3 Bend/25LM


1.2.4.1 4C x 4 Sq.mm & Below LM 976 1EL + 3 AE/HL 244.1
1.2.4.2 4C x 6 Sq.mm to 16 Sq.mm LM 854 1EL + 3 AE/HL 213.6
1.2.4.3 4C x 25 Sq.mm to 50 Sq.mm LM 244 1EL + 3 AE/HL 61.0
1.2.4.4 4C x 70 Sq.mm to 95 Sq.mm LM 122 1EL + 3 AE/HL 30.5
1.2.4.5 4C x 120 Sq.mm to 150 Sq.mm LM 78 1EL + 3 AE/HL 19.5
1.2.4.6 4C x 185 Sq.mm to 240 Sq.mm LM 37 1EL + 3 AE/HL 9.2
1.2.4.7 3C x 185 Sq.mm to 240 Sq.mm, HV Cable LM 29 1EL + 3 AE/HL 7.3

1.3 Through Conduit


1.3.1 PVC Flexible Cable - Straight
1.3.1.1 1C x 2.5 Sq.mm & Below LM 1050 1EL + 2 AE/HL 350.0
1.3.1.2 1C x 4 Sq.mm LM 900 1EL + 2 AE/HL 300.0
1.3.1.3 1C x 6 Sq.mm LM 750 1EL + 2 AE/HL 250.0
1.3.1.4 1C x 10 Sq.mm LM 600 1EL + 2 AE/HL 200.0
1.3.1.5 1C x 16 Sq.mm LM 450 1EL + 2 AE/HL 150.0
1.3.1.6 1C x 25 Sq.mm LM 300 1EL + 2 AE/HL 100.0

1.3.2 PVC Flexible Cable - 1 Bend/ 25LM


1.3.2.1 1C x 2.5 Sq.mm & Below LM 1019 1EL + 2 AE/HL 339.5
1.3.2.2 1C x 4 Sq.mm LM 873 1EL + 2 AE/HL 291.0
1.3.2.3 1C x 6 Sq.mm LM 728 1EL + 2 AE/HL 242.5
1.3.2.4 1C x 10 Sq.mm LM 582 1EL + 2 AE/HL 194.0
1.3.2.5 1C x 16 Sq.mm LM 437 1EL + 2 AE/HL 145.5
1.3.2.6 1C x 25 Sq.mm LM 291 1EL + 2 AE/HL 97.0

1.3.3 PVC Flexible Cable - 2 Bend/ 25LM


1.3.3.1 1C x 2.5 Sq.mm & Below LM 937 1EL + 2 AE/HL 312.3
1.3.3.2 1C x 4 Sq.mm LM 803 1EL + 2 AE/HL 267.7
1.3.3.3 1C x 6 Sq.mm LM 669 1EL + 2 AE/HL 223.1
1.3.3.4 1C x 10 Sq.mm LM 535 1EL + 2 AE/HL 178.5
1.3.3.5 1C x 16 Sq.mm LM 402 1EL + 2 AE/HL 133.9
1.3.3.6 1C x 25 Sq.mm LM 268 1EL + 2 AE/HL 89.2

1.3.4 PVC Flexible Cable - 3 Bend/ 25LM


1.3.4.1 1C x 2.5 Sq.mm & Below LM 843 1EL + 2 AE/HL 281.1
1.3.4.2 1C x 4 Sq.mm LM 723 1EL + 2 AE/HL 240.9
1.3.4.3 1C x 6 Sq.mm LM 602 1EL + 2 AE/HL 200.8
1.3.4.4 1C x 10 Sq.mm LM 482 1EL + 2 AE/HL 160.6
1.3.4.5 1C x 16 Sq.mm LM 361 1EL + 2 AE/HL 120.5
1.3.4.6 1C x 25 Sq.mm LM 241 1EL + 2 AE/HL 80.3

1.3.5 PVC Flexible Cable - 4 Bend/ 25LM


1.3.5.1 1C x 2.5 Sq.mm & Below LM 742 1EL + 2 AE/HL 247.4
1.3.5.2 1C x 4 Sq.mm LM 636 1EL + 2 AE/HL 212.0
1.3.5.3 1C x 6 Sq.mm LM 530 1EL + 2 AE/HL 176.7
1.3.5.4 1C x 10 Sq.mm LM 424 1EL + 2 AE/HL 141.4
1.3.5.5 1C x 16 Sq.mm LM 318 1EL + 2 AE/HL 106.0
1.3.5.6 1C x 25 Sq.mm LM 212 1EL + 2 AE/HL 70.7

1.4 Through Trunking


1.4.1 PVC Flexible Cable - Straight - 3 Run Each
1.4.1.1 1C x 2.5 Sq.mm & Below LM 850 2EL + 2 AE/HL 212.5
1.4.1.2 1C x 4 Sq.mm LM 750 2EL + 2 AE/HL 187.5
1.4.1.3 1C x 6 Sq.mm LM 700 2EL + 2 AE/HL 175.0
1.4.1.4 1C x 10 Sq.mm LM 600 2EL + 2 AE/HL 150.0
1.4.1.5 1C x 16 Sq.mm LM 500 2EL + 2 AE/HL 125.0
1.4.1.6 1C x 25 Sq.mm LM 400 2EL + 2 AE/HL 100.0

1.4.2 PVC Flexible Cable - 1 Bend/ 25LM - 3 Run Each


1.4.2.1 1C x 2.5 Sq.mm & Below LM 825 2EL + 2 AE/HL 206.1
1.4.2.2 1C x 4 Sq.mm LM 728 2EL + 2 AE/HL 181.9
1.4.2.3 1C x 6 Sq.mm LM 679 2EL + 2 AE/HL 169.8
1.4.2.4 1C x 10 Sq.mm LM 582 2EL + 2 AE/HL 145.5
1.4.2.5 1C x 16 Sq.mm LM 485 2EL + 2 AE/HL 121.3
1.4.2.6 1C x 25 Sq.mm LM 388 2EL + 2 AE/HL 97.0

1.4.3 PVC Flexible Cable - 2 Bend/ 25LM - 3 Run Each


1.4.3.1 1C x 2.5 Sq.mm & Below LM 759 2EL + 2 AE/HL 189.6
1.4.3.2 1C x 4 Sq.mm LM 669 2EL + 2 AE/HL 167.3
1.4.3.3 1C x 6 Sq.mm LM 625 2EL + 2 AE/HL 156.2
1.4.3.4 1C x 10 Sq.mm LM 535 2EL + 2 AE/HL 133.9
1.4.3.5 1C x 16 Sq.mm LM 446 2EL + 2 AE/HL 111.6
1.4.3.6 1C x 25 Sq.mm LM 357 2EL + 2 AE/HL 89.2

1.4.4 PVC Flexible Cable - 3 Bend/ 25LM - 3 Run Each


1.4.4.1 1C x 2.5 Sq.mm & Below LM 683 2EL + 2 AE/HL 170.7
1.4.4.2 1C x 4 Sq.mm LM 602 2EL + 2 AE/HL 150.6
1.4.4.3 1C x 6 Sq.mm LM 562 2EL + 2 AE/HL 140.6
1.4.4.4 1C x 10 Sq.mm LM 482 2EL + 2 AE/HL 120.5
1.4.4.5 1C x 16 Sq.mm LM 402 2EL + 2 AE/HL 100.4
1.4.4.6 1C x 25 Sq.mm LM 321 2EL + 2 AE/HL 80.3

1.4.5 PVC Flexible Cable - 4 Bend/ 25LM - 3 Run Each


1.4.5.1 1C x 2.5 Sq.mm & Below LM 601 2EL + 2 AE/HL 150.2
1.4.5.2 1C x 4 Sq.mm LM 530 2EL + 2 AE/HL 132.5
1.4.5.3 1C x 6 Sq.mm LM 495 2EL + 2 AE/HL 123.7
1.4.5.4 1C x 10 Sq.mm LM 424 2EL + 2 AE/HL 106.0
1.4.5.5 1C x 16 Sq.mm LM 353 2EL + 2 AE/HL 88.3
1.4.5.6 1C x 25 Sq.mm LM 283 2EL + 2 AE/HL 70.7

3 GENERAL ACTIVITIES
3.1 Chalke Marking LM 320 1EL + 1 AE/HL 160.0
3.1 Fixing of Unifix Nos 240 2 AE/HL 120.0
3.1 Drilling for Hole Nos 120 2 AE/HL 60.0

5 TERMINATION WORKS-LUGS
5.1 Lugs-Size 6 to 25 Nos 60 1EL 60.0
5.2 Lugs-Size 25 to 50 Nos 45 1EL 45.0
5.3 Lugs-Size 70 to 120 Nos 60 1EL + 1 AE/HL 30.0
5.4 Lugs-Size 150 to 300 Nos 32 1EL + 1 AE/HL 16.0
5.5 Lugs-Size 630 Nos 20 1EL + 1 AE/HL 10.0

6 TERMINATION WORKS-Gland
6.1 Gland-Size 20 Nos 36 1EL + 2 AE/HL 12.0
6.2 Gland-Size 25 Nos 24 1EL + 2 AE/HL 8.0
6.3 Gland-Size 35 Nos 12 1EL + 2 AE/HL 4.0
6.4 Gland-Size 50 Nos 8 1EL + 2 AE/HL 2.7
6.5 Gland-Size 63 Nos 4 1EL + 2 AE/HL 1.3
6.6 Gland-Size 75 Nos 3 1EL + 2 AE/HL 1.0
6.7 Gland-Size 90 Nos 3 1EL + 2 AE/HL 1.0

7 CABLE TAG & TIES - FIXING


7.1 Cable Tags & Ties Nos 300 2 AE/HL 150.0
8 CABLE TRAY FIXING
8.1 100 M Width LM 225 2EL + 2 AE/HL 56.3
8.2 200 M Width LM 180 2EL + 2 AE/HL 45.0
8.3 300 M Width 3 Mtr Length LM 150 2EL + 2 AE/HL 37.5
8.4 600 M Width LM 75 2EL + 2 AE/HL 18.8
9 CABLE TRAY SUPPORT - FIXING
9.1 For 100 M Width Nos 32 2 AE/HL 16.0
9.2 For 200 M Width Nos 32 2 AE/HL 16.0
9.3 For300 M Width Nos 20 2 AE/HL 10.0
9.4 For 600 M Width Nos 20 2 AE/HL 10.0

10 CABLE TRUNKING FIXING


10.1 Fixing of Trunking Accessoires(Channel,Arm,Threaded Rod) Pcs 80 2EL + 2 AE/HL 20.0
10.2 Placing of Trunking(Nut,bolt,Washer,Earth Strip) Pcs 30 2EL + 2 AE/HL 7.5
10.3 Fixing of Trunking Cover LM 100 1EL + 1 AE/HL 50.0
10.4 Fixing of Accessoires(Bend,straight,T-Joint) Pcs 15 1EL + 1 AE/HL 7.5
11 FIXING OF EXHAUST FAN
11.1 Fixing of Exhaust Fan 1&3 Phase(dia 50,75,100) Nos 50 1EL + 1 AE/HL 25.0
11.2 Fixing of Exhaust Fan 1&3 Phase Ceiling Type Nos 15 1EL + 1 AE/HL 7.5
11.3 Fixing of Exhaust Fan 3 Phase in Roof Nos 25 1EL + 1 AE/HL 12.5

12 INSTALLATION OF RMU
12.1 Installation of RMU Nos 1 1EL + 3 AE/HL

13 EARTHING & LIGHTNING PROTECTION


13.1 Cu Tape- Fixing Horizontal LM 250 1EL + 1 AE/HL 125.0
13.1 Cu Tape- Fixing Vertical LM 100 1EL + 1 AE/HL 50.0
13.2 DC Clip- Fixing Nos 200 1 AE/HL 200.0
13.3 Air Rod- Fixing Nos 15 1EL 15.0
13.4 Earth Pit Nos 8 1 AE/HL 8.0
13.5 Cu Rod installation 1.2 mtr Nos 12 1EL + 2 AE/HL 4.0
13.6 Placing of bentonite Power Bags 8 1 AE/HL 8.0
13.7 Testing & Commissiong of Each Individual Pit Nos 10 1EL + 1 AE/HL 5.0
13.8 Fixing of earth Link for all steel structures Nos 15 1EL + 1 AE/HL 7.5
13.9 Tag,dressing,Lug crimping etc.(For each Pit) Nos 10 1EL + 1 AE/HL 5.0

14 INSTALLATION OF TRANSFORMER
14.1 Placing of tranformer in Foundation Nos 1 2 EL + 3 AE/HL
14.2 Cotrol Wiring B/W Tranformer - LV Switchgear Nos 10 1EL + 1 AE/HL
14.3 Cotrol Wiring B/W Tranformer -MV Switchgear Nos 10 1EL + 1 AE/HL
14.4 Site Acceptance Test Nos 2 1EL + 1 AE/HL
14.5 Testing Of Transformer(1MVA-50MVA) Nos 2 1EL + 1 AE/HL
14.6 Commissioning Of Transformer(1MVA-50MVA) Nos 1 1EL + 1 AE/HL
15 INSTALLATION OF BUSDUCTS
15.1 Busducts Installation Mtr 10 1EL + 4 AE/HL
15.2 Support Fixing Nos 20 1EL + 1 AE/HL

16 INSTALLATION OF ANNUNCIATOR PANEL


16.1 Installation Nos 1 1EL + 2 AE/HL
16.2 Testing & Commissioning Nos 1 1EL + 2 AE/HL

17 INSTALLATION OF LV SWITCHBOARD
17.1 Cubicle - 800 x 800 x 1200mm Nos 3 1EL + 2 AE/HL
17.2 Loading,Unloading & Installation - Cubicles Nos 10 2EL + 4 AE/HL
17.3 Bus Bar Tightning - Cubicles Nos 10 2EL + 2 AE/HL

18 TESTING & COMMMISSIONING OF LV & MV SWICTHGEARS


Testing of RMU HI-Pot/Megger/Functional Test (1Tranformer
Nos 2 2EL + 1 AE/HL
18.1 Feeder +2 Network feeder)

Commissioning of RMU(1Tranformer Feeder +2 Network feeder) Nos 1 2EL + 1 AE/HL


18.2
Testing of QRM HI-Pot/Megger/Functional Test (2Tranformer
Nos 2 2EL + 1 AE/HL
18.3 Feeder +2 Network feeder)

Commissioning of QRM(2Tranformer Feeder +2 Network feeder) Nos 1 2EL + 1 AE/HL


18.4
Testing of TRM HI-Pot/Megger/Functional Test (3Tranformer
Nos 2 2EL + 1 AE/HL
18.5 Feeder +2 Network feeder)

Comissioning of TRM(3Tranformer Feeder +2 Network feeder) Nos 1 2EL + 1 AE/HL


18.6
Testing of LV Panel HI-Pot/Megger/Functional Test (10-18
Nos 1 2EL + 1 AE/HL
18.7 Outgoing Feeder)
18.8 Commissioning of LV Panel(10-18 Outgoing Feeder) Nos 1 2EL + 4 AE/HL
18.9 Testing of SMDB (5-10 Outgoing Feeder) Nos 1 1EL + 1 AE/HL
18.10 Commissioning of SMDB (5-10 Outgoing Feeder) Nos 1 2EL + 2 AE/HL
18.11 Testing of Lighting FDB (4-24 way) Nos 4 1EL + 1 AE/HL
18.12 Commissioning of Lighting FDB (4-24 way) Nos 4 2EL + 3 AE/HL

19 INSTALLATION OF SOCKETS
19.1 Single Phase Socket Nos 20 1EL+1HL 10.0
19.2 3 Phase Socket Nos 16 1EL+1HL 8.0
19.3 Industrial Socket Nos 16 1EL+1HL 8.0

20 INSTALLATION OF LIGHT FITTING & ACCESSORIES


20.1 Fixing of PVC Pipe including fixing of Saddles,Bend,etc Mtr 100 1EL + 1 AE/HL 50.0
20.2 Fixing of Saddles Nos Included in Above item
20.3 Fixing of Pipe LM Included in Above item
20.4 Fixing of Circular Box/ Bend Nos Included in Above item
20.5 Fixing of Ceiling Rose Nos 64 1EL + 1 AE/HL 32.0
20.6 Termination of Flexible wire B/W Ceiling Rose to Light Fitting Nos 48 1EL + 1 AE/HL 24.0
20.8 Installation of Moment Sensor Nos 15 1EL + 1 AE/HL 7.5
20.9 Installation of Light

Ceiling Mount Type (1 tube /2 tube/3tube/4tube) false cealing Pcs 24 1EL + 1 AE/HL
20.11 12.0
20.12 Surface Mounted Pcs 32 1EL + 1 AE/HL 16.0
20.13 External wall mounted Pcs 25 1EL + 1 AE/HL 12.5
20.13 Strret light height- Pcs 25 1EL + 1 AE/HL 12.5
21 INSTALLATION OF LIGHT FITTING & ACCESSORIES
21.1 Dressing of Every single Point(Switch, Socket to FDB) Nos 30 1EL + 1 AE/HL
21.2 FDB Dressing below 8 way Nos 6 1EL + 1 AE/HL
21.3 FDB Dressing 8 to 14 way Nos 1 1EL + 1 AE/HL 0.5
21.4 FDB Dressing Above14 way Nos 3 1EL + 1 AE/HL
21.5 Testing of FDB with all outgoing Circuits 8 ways Below Nos 3 1EL + 2 AE/HL
21.6 Testing of FDB with for one Circuits Nos 30 1EL + 2 AE/HL 10.0
21.7 Testing of FDB with all outgoing Circuits 14 ways Above Nos 1 1EL + 2 AE/HL

Commissioning of FDB with all outgoing circuits 8 ways Below Nos 3 1EL + 2 AE/HL
21.8
21.9 Commissioning of FDB with for one Circuits Nos 240 1EL + 2 AE/HL 80.0

Commissioning of FDB with all outgoing circuits 14 ways Above Nos 1 1EL + 2 AE/HL
21.10

INSTALLATION OF EXTERNAL LIGHT FITTING &


22
ACCESSORIES
22.1 Fixing of Path way Bollard lamp Nos 10 1EL + 1 AE/HL
22.2 Fixing of Inground UP Light Nos 10 1EL + 1 AE/HL
22.3 Fixing of Diecast decorative Pole Lights Nos 8 1EL + 1 AE/HL
22.4 Fixing of water Foundation decorative Lights Nos 10 1EL + 1 AE/HL
22.5 Fixing of Street Lights(3,4,6,,8,10,12Mtr) Single arm Nos 4 1EL + 4 AE/HL
22.6 Fixing of Street Lights(3,4,6,,8,10,12Mtr) Double arm Nos 4 1EL + 4 AE/HL
22.7 Fixing of Stadium Lights(18,25Mtr)10-50 Head Lights Nos 1 1EL + 4 AE/HL
22.8 Fixing of Diecast decorative wall Mounted Lights Nos 10 1EL + 1 AE/HL
22.9 Fixing of Metal Halide wall Mounted Lights Nos 10 1EL + 1 AE/HL
22.10 Fixing of 400 W Flood Lights in Workshop Nos 8 1EL + 3 AE/HL 2.0

2 INSTALLATION OF CABLE JOINTS


2.1 NON-Leadsheath Power Cables( Three & Four Core)
2.1.1 Cable Joint for 3C/4Cx 16mm -3C/ 4Cx 50mm Nos 8 1EL + 1 AE/HL
2.1.2 Cable Joint for 3C/4Cx 70mm - 3C/4Cx 150mm Nos 5 1EL + 2 AE/HL
2.1.3 Cable Joint for 3C/4Cx 185mm - 3C/4Cx 240mm Nos 4 2EL + 2 AE/HL
2.1.4 Cable Joint for 3C/4Cx 300mm Nos 4 2EL + 2 AE/HL
2.2 Leadsheath Power Cables( Three & Four Core)
2.2.1 Cable Joint for 3C/4Cx 16mm -3C/ 4Cx 50mm Nos 8 1EL + 1 AE/HL
2.2.2 Cable Joint for 3C/4Cx 70mm - 3C/4Cx 150mm Nos 5 1EL + 2 AE/HL
2.2.3 Cable Joint for 3C/4Cx 185mm - 3C/4Cx 240mm Nos 4 2EL + 2 AE/HL
2.2.4 Cable Joint for 3C/4Cx 300mm Nos 4 2EL + 2 AE/HL
2.3 NON-Leadsheath Power Cables( Single Core)
2.3.1 Cable Joint for 1Cx 16mm -1Cx 50mm Nos 12 1EL + 1 AE/HL
2.3.2 Cable Joint for 1Cx 70mm - 1Cx 150mm Nos 8 1EL + 1 AE/HL
2.3.3 Cable Joint for 1Cx 185mm - 1Cx 240mm Nos 6 1EL + 2 AE/HL
2.3.4 Cable Joint for 1Cx 300mm Nos 5 2EL + 2 AE/HL
2.3.5 Cable Joint for 1Cx 400mm Nos 4 2EL + 2 AE/HL
2.3.6 Cable Joint for 1Cx 500mm Nos 4 2EL + 2 AE/HL
2.3.7 Cable Joint for 1Cx 630mm Nos 4 2EL + 2 AE/HL
2.4 Leadsheath Power Cables( Single Core)
2.4.1 Cable Joint for 1Cx 16mm -1Cx 50mm Nos 12 1EL + 1 AE/HL
2.4.2 Cable Joint for 1Cx 70mm - 1Cx 150mm Nos 8 1EL + 1 AE/HL
2.4.3 Cable Joint for 1Cx 185mm - 1Cx 240mm Nos 6 1EL + 2 AE/HL
2.4.4 Cable Joint for 1Cx 300mm Nos 5 2EL + 2 AE/HL
2.4.5 Cable Joint for 1Cx 400mm Nos 4 2EL + 2 AE/HL
2.4.6 Cable Joint for 1Cx 500mm Nos 4 2EL + 2 AE/HL
2.4.7 Cable Joint for 1Cx 630mm Nos 4 2EL + 2 AE/HL

3 GENERAL ACTIVITIES
3.1 Making Hole for Rawal Plug/ Anchor Bolt Nos 40 2 AE/HL
3.1 Loading and Unloading of Electrical Accessories Nos
3.1 Loading and Unloading of MV/HV/LV Switchgears Nos 2 1EL + 3 AE/HL
3.1 Loading and Unloading of MV/HV/LV Transformers Nos 4 1EL + 2 AE/HL
3.1 Loading and Unloading of MV/HV/LV Cables Nos 20 3 AE/HL
-Working Foreman
Team Leader
PRODUCTIVITY ELECTRICAL

Sl No
A
1
2
3
4
5
6
7
8
B
1
2
3
4
5
6
7
8
*
*
*
*
9
10
11
12
13
14
15
16
17
18
C
1
2
3
4
D
1
2
3
4
5

E
1
2
3
F
1
2
3
4
5
6
7
8
9

G
1
2
3

1
*
*
*
*
*
2
3
4
5
6
7
8
1
*
*
*
*
*
2
3
4
5
6

1
*
*
*
*
*
2
3
4
5
6

1
*
*
*
*
*
2
3
4
5
6
7

1
*
*
*
*
*
2
3
4
5
6
7
8

1
*
*
*
*
*
2
3
4
5
6
7
8

1
*
*
*
*
*
2
3

I
1
2
3
4
J

1
2
3
4

1
2
3
4

1
2
3
4
5
6
7

1
2
3
4
5
6
7
K
1
2
3
4
5
6
7
8
9
10
11
12
L
1
2
3
4
5
6

M
1
2
3
4
5
6
7
N
1
2
3
PRODUCTIVITY ELECTRICAL

Activity
General Activities
Chalke Marking
Making Hole for Rawal Plug/ Anchor Bolt
Fixing of Unifix
Drilling for Hole
Loading and Unloading of Electrical Accessories
Loading and Unloading of MV/HV/LV Switchgears
Loading and Unloading of MV/HV/LV Transformers
Loading and Unloading of MV/HV/LV Cables
Light Fitting Installation & Accessories

Fixing of Saddles
Fixing of Pipe
Fixing of Circular Box/ Bend
Fixing of Ceiling Rose
Termination of Flexible wire B/W Ceiling Rose to Light Fitting
Wire Pulling (1.5,2,4,6 mm)
Installation of Moment Sensor
Installation of Light
Normal fittingSingle /Double (8 W -36)
Ceiling Mount Type (1 tube /2 tube/3tube/4tube)
Weather Proof Type(1 tube /2 tube/3tube/4tube)
Fire Proof Type Wall and Ceiling(1 tube /2 tube/3tube/4tube)
Dressing of Every single Point(Switch, Socket to FDB)
FDB Dressing below 8 way
FDB Dressing below 14 way
FDB Dressing Above14 way
Testing of FDB with all outgoing Circuits 8 ways Below
Testing of FDB with all outgoing Circuits 14 ways Below
Testing of FDB with all outgoing Circuits 14 ways Above
Commissioning of FDB with all outgoing circuits 8 ways Below
Commissioning of FDB with all outgoing circuits 14 ways Below
Commissioning of FDB with all outgoing circuits 14 ways Above
Installation of Trunking & Accessories
Fixing of Trunking Accessoires(Channel,Arm,Threaded Rod)
Placing of Trunking(Nut,bolt,Washer,Earth Strip)
Fixing of Trunking Cover
Fixing of Accessoires(Bend,straight,T-Joint)
Installation of Cable Tray & Accessories
Fixing of Threaded rod
Fixing of C-Channel
Placing of Cable Tray(Nut,bolt,Washer)
Fixing of cable tray Cover
Fixing of Accessoires(Bend,straight,T-Joint)
Installation of Fan

Fixing of Exhaust Fan 1&3 Phase(dia 50,75,100)


Fixing of Exhaust Fan 1&3 Phase Ceiling Type
Fixing of Exhaust Fan 3 Phase in Roof
Installation External Light Fittings
Fixing of Path way Bollard lamp
Fixing of Inground UP Light
Fixing of Diecast decorative Pole Lights
Fixing of water Foundation decorative Lights
Fixing of Street Lights(3,4,6,,8,10,12Mtr) Single arm
Fixing of Street Lights(3,4,6,,8,10,12Mtr) Double arm
Fixing of Stadium Lights(18,25Mtr)10-50 Head Lights
Fixing of Diecast decorative wall Mounted Lights
Fixing of Metal Halide wall Mounted Lights
Installation Power Sockets

Fixing of Single Phase Socket


Fixing of Three Phase Socket
Fixing of Industrial Type Single &Three Phase Socket
Termination Of Power & Earth Cables
NON-Leadsheath Power Cables
Termination of Power Cable 4Cx 6mm - 4C x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 4Cx 16mm - 4C x50mm & which include above activity
Termination of Power Cable 4Cx 70mm - 4C x120mm & which include above activity
Termination of Power Cable 4Cx 150mm - 4C x185mm & which include above activity
Termination of Power Cable 4Cx 240mm - 4C x300mm & which include above activity
Termination of Power Cable 4Cx 400mm & which include above activity
Termination of Power Cable 4Cx 500mm & which include above activity
Termination of Power Cable 1Cx 630mm & which include above activity
NON-Leadsheath Power Cables
Termination of Power Cable 4cx 6mm - 4c x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 4Cx 16mm - 4C x50mm & which include above activity
Termination of Power Cable 4Cx 70mm - 4C x120mm & which include above activity
Termination of Power Cable 4Cx 150mm - 4C x185mm & which include above activity
Termination of Power Cable 4Cx 240mm - 4C x300mm & which include above activity
Termination of Power Cable 4Cx 400mm & which include above activity
Leadsheath Power Cables( Three Core)
Termination of Power Cable 3Cx 6mm - 3C x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 3Cx 16mm - 3C x50mm & which include above activity
Termination of Power Cable 3Cx 70mm - 4C x120mm & which include above activity
Termination of Power Cable 3Cx 150mm - 3C x185mm & which include above activity
Termination of Power Cable 3Cx 240mm - 3C x300mm & which include above activity
Termination of Power Cable 3Cx 400mm & which include above activity
NON-Leadsheath Power Cables( Three Core)
Termination of Power Cable 3Cx 6mm - 3C x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 3Cx 16mm - 3C x50mm & which include above activity
Termination of Power Cable 3Cx 70mm - 4C x120mm & which include above activity
Termination of Power Cable 3Cx 150mm - 3C x185mm & which include above activity
Termination of Power Cable 3Cx 240mm - 3C x300mm & which include above activity
Termination of Power Cable 3Cx 400mm & which include above activity
Termination of Power Cable 3Cx 500mm & which include above activity
Leadsheath Power Cables( Single Core)
Termination of Power Cable 1Cx 6mm - 1C x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 1Cx 16mm - 1C x50mm & which include above activity
Termination of Power Cable 1Cx 70mm - 1C x120mm & which include above activity
Termination of Power Cable 1Cx 150mm - 1C x185mm & which include above activity
Termination of Power Cable 1Cx 240mm - 1C x300mm & which include above activity
Termination of Power Cable 1Cx 400mm & which include above activity
Termination of Power Cable 1Cx 500mm & which include above activity
Termination of Power Cable 1Cx 630mm & which include above activity
NON-Leadsheath Power Cables( Single Core MV & LV)
Termination of Power Cable 1Cx 6mm - 1C x10mm activity which include below
Cable Entry to trench, marking,Cutting of Armour,SWA,PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Power Cable 1Cx 16mm - 1C x50mm & which include above activity
Termination of Power Cable 1Cx 70mm - 1C x120mm & which include above activity
Termination of Power Cable 1Cx 150mm - 1C x185mm & which include above activity
Termination of Power Cable 1Cx 240mm - 1C x300mm & which include above activity
Termination of Power Cable 1Cx 400mm & which include above activity
Termination of Power Cable 1Cx 500mm & which include above activity
Termination of Power Cable 1Cx 630mm & which include above activity
Earth Cables(Yellow/Green)
Termination of Earth Un ArmourCable 1C X6mm-50 activity which include below
Cable Entry to trench, marking,Cutting of PVC,Conductor
Making of Hole in Bottom Gland Plate,Sleeveout ,Armour Removal
Placing of Gland,Position and entry to terminal Point
Dividing of Core,Lug Crimping,Heat shrink Sleeve Fixing,Tag,Dressing Inside the Panel.
Termination of respective terminal in outgoing /Incoming feeder
Termination of Earth Cable 1C X70mm-1C X185mm & which include above activity
Termination of Earth Cable 1C X240mm-1C X300mm & which include above activity
Testing of Cables Lead & NON-leadsheath
Testing of Cables Lead & NON-leadsheath (1Core,2Core,3Core,4Core)
Testing & Commissioning of Power cables & Earth Cables

Testing of HV Cables HI-Pot/Megger (1C/3C X 90mm -1C/3C 300mm)


Commissioning of HV Cables(1C/3C X 90mm -1C/3C 300mm)
Testing of LV Cables Megger (3C/4C X 10mm -3C/4C 300mm)
Commissioning of LV Cables(3C/4C X 10mm -3C/4C 300mm)
Power & Earth Cables Joint
NON-Leadsheath Power Cables( Three & Four Core)
Cable Joint for 3C/4Cx 16mm -3C/ 4Cx 50mm
Cable Joint for 3C/4Cx 70mm - 3C/4Cx 150mm
Cable Joint for 3C/4Cx 185mm - 3C/4Cx 240mm
Cable Joint for 3C/4Cx 300mm
Leadsheath Power Cables( Three & Four Core)
Cable Joint for 3C/4Cx 16mm -3C/ 4Cx 50mm
Cable Joint for 3C/4Cx 70mm - 3C/4Cx 150mm
Cable Joint for 3C/4Cx 185mm - 3C/4Cx 240mm
Cable Joint for 3C/4Cx 300mm
NON-Leadsheath Power Cables( Single Core)
Cable Joint for 1Cx 16mm -1Cx 50mm
Cable Joint for 1Cx 70mm - 1Cx 150mm
Cable Joint for 1Cx 185mm - 1Cx 240mm
Cable Joint for 1Cx 300mm
Cable Joint for 1Cx 400mm
Cable Joint for 1Cx 500mm
Cable Joint for 1Cx 630mm
Leadsheath Power Cables( Single Core)
Cable Joint for 1Cx 16mm -1Cx 50mm
Cable Joint for 1Cx 70mm - 1Cx 150mm
Cable Joint for 1Cx 185mm - 1Cx 240mm
Cable Joint for 1Cx 300mm
Cable Joint for 1Cx 400mm
Cable Joint for 1Cx 500mm
Cable Joint for 1Cx 630mm
Testing and Commissioning of LV & MV Switch gears
Testing of RMU HI-Pot/Megger/Functional Test (1Tranformer Feeder +2 Network feeder)
Commissioning of RMU(1Tranformer Feeder +2 Network feeder)
Testing of QRM HI-Pot/Megger/Functional Test (2Tranformer Feeder +2 Network feeder)
Commissioning of QRM(2Tranformer Feeder +2 Network feeder)
Testing of TRM HI-Pot/Megger/Functional Test (3Tranformer Feeder +2 Network feeder)
Comissioning of TRM(3Tranformer Feeder +2 Network feeder)
Testing of LV Panel HI-Pot/Megger/Functional Test (10-18 Outgoing Feeder)
Commissioning of LV Panel(10-18 Outgoing Feeder)
Testing of SMDB (5-10 Outgoing Feeder)
Commissioning of SMDB (5-10 Outgoing Feeder)
Testing of Lighting FDB (4-24 way)
Commissioning of Lighting FDB (4-24 way)
Testing and Commissioning of Power Transformer
Placing of tranformer in Foundation
Cotrol Wiring B/W Tranformer - LV Switchgear
Cotrol Wiring B/W Tranformer -MV Switchgear
Site Acceptance Test
Testing Of Transformer(1MVA-50MVA)
Commissioning Of Transformer(1MVA-50MVA)

Installation of Earth Bit

Installation of Earth Bit(10 Mtr deep ) Includes cable connector bar


Installation of earth Inspection Pit
Placing of bentonite Power
Testing of Each Individual Pit
Commissioing of each individual Pit
Fixing of earth Link for all steel structures
Tag,dressing,Lug crimping etc.(For each Pit)
Installation of Lighting Protection system
Fixing of copper Saddle(2,3,4 ways)
Fixing of Copper Earth Tape
Fixing of Earth Disconnector
UNIT

LM
Nos
Nos
Nos
Nos
Nos
Nos
Nos

Nos
LM
Nos
Nos
Nos
LM
Nos
Nos
Pcs
Pcs
Pcs
Pcs
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

Pcs
Pcs
LM
Pcs
Pcs
Pcs
LM
LM
Pcs

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

Nos
Nos
Nos

Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end

Nos Both end


Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end
Nos Both end

Nos Both end


Nos Both end

Nos Both end

Nos Circuit
Nos Circuit
Nos Circuit
Nos Circuit

Nos
Nos
Nos
Nos

Nos
Nos
Nos
Nos

Nos
Nos
Nos
Nos
Nos
Nos
Nos

Nos
Nos
Nos
Nos
Nos
Nos
Nos

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

Nos

Nos
Nos
Nos

Nos
Nos
Nos
Nos
Nos

Nos

Nos
LM
Pcs

Anda mungkin juga menyukai