A Tenaga
1 Pekerja L.01 OH 0.330 82,500.00
2 Mandor L.04 OH 0.010 99,000.00
Jumlah Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A Tenaga
1 Pekerja L.01 OH 0.300 82,500.00
2 Mandor L.04 OH 0.010 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Pasir Urug m³ 1.200 80,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
A.3.2.1.10 Pemasangan 1 m³ pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan
No. URAIAN KODE Satuan Koefesian
A.4.1.1.2. Membuat 1 m³ beton mutu f ' c = 9,8 Mpa ( K - 125 ), Slump (12 ± 2 ) cm, w/c = 0.78
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 276.000 1,480.00
2 Pasir Beton Kg 828.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,012.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
A.4.1.1.3. Membuat 1 m³ beton mutu f ' c = 12,2 Mpa ( K - 150 ), Slump (12 ± 2 ) cm, w/c = 0.72
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 299.000 1,480.00
2 Pasir Beton Kg 799.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,017.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
CATATAN :
Bobot isi pasir = 1.400 Kg/m³, bobot isi kerikil = 1.350 Kg/m³, buckling factor pasir = 20%
A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm, w/c = 0.87
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 299.000 1,480.00
2 Pasir Beton Kg 799.000 56.25
A.4.1.1.5. Membuat 1 m³ beton mutu f ' c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 326.000 1,480.00
2 Pasir Beton Kg 760.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,029.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.6. Membuat 1 m³ beton mutu f ' c = 16,9 Mpa ( K - 200 ), Slump ( 12 ± 2 ) cm, w/c = 0.61
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 352.000 1,480.00
A.4.1.1.7. Membuat 1 m³ beton mutu f ' c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 371.000 1,480.00
2 Pasir Beton Kg 698.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,047.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.8. Membuat 1 m³ beton mutu f ' c = 21,7 Mpa ( K - 250 ), Slump ( 12 ± 2 ) cm, w/c = 0.56
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
A.4.1.1.9. Membuat 1 m³ beton mutu f ' c = 24,0 Mpa ( K - 275 ), Slump ( 12 ± 2 ) cm, w/c = 0.53
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 406.000 1,480.00
2 Pasir Beton Kg 684.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,026.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.10. Membuat 1 m³ beton mutu f ' c = 26,4 Mpa ( K - 300 ), Slump ( 12 ± 2 ) cm, w/c = 0.52
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00
2 Tukang Batu L.02 OH 0.275 88,000.00
3 Kepala Tukang L.03 OH 0.028 88,000.00
4 Mandor L.04 OH 0.083 99,000.00
Jumlah Tenaga Kerja
B Bahan
A.4.1.1.11. Membuat 1 m³ beton mutu f ' c = 28,8 Mpa ( K - 325 ), Slump ( 12 ± 2 ) cm, w/c = 0.49
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 2.100 82,500.00
2 Tukang Batu L.02 OH 0.350 88,000.00
3 Kepala Tukang L.03 OH 0.035 88,000.00
4 Mandor L.04 OH 0.105 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 439.000 1,480.00
2 Pasir Beton Kg 670.000 56.25
3 Kerikil ( Maks 30mm ) Kg 1,006.000 275.86
4 Air Liter 215.000 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.12. Membuat 1 m³ beton mutu f ' c = 31,2 Mpa ( K - 350 ), Slump ( 12 ± 2 ) cm, w/c = 0.48
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 2.100 82,500.00
2 Tukang Batu L.02 OH 0.350 88,000.00
3 Kepala Tukang L.03 OH 0.035 88,000.00
4 Mandor L.04 OH 0.105 99,000.00
Jumlah Tenaga Kerja
A.4.1.2.2. Pembuatan 1 m² lahan produksi tebal 10 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.165 82,500.00
2 Tukang Batu L.02 OH 0.028 88,000.00
3 Kepala Tukang L.03 OH 0.003 88,000.00
4 Mandor L.04 OH 0.008 99,000.00
Jumlah Tenaga Kerja
A.4.1.2.3. Pembuatan 1 m² lahan produksi tebal 12 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.198 82,500.00
2 Tukang Batu L.02 OH 0.033 88,000.00
3 Kepala Tukang L.03 OH 0.003 88,000.00
4 Mandor L.04 OH 0.010 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Portland Kg 32.120 1,480.00
2 Pasir Beton Kg 91.200 90,000.00
3 Kerikil ( Maks 30mm ) Kg 123.480 400,000.00
4 Air Liter 25.800 45.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.2.4. Pembuatan 1 m² lahan produksi tebal 15 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.248 82,500.00
2 Tukang Batu L.02 OH 0.041 88,000.00
3 Kepala Tukang L.03 OH 0.004 88,000.00
4 Mandor L.04 OH 0.013 99,000.00
Jumlah Tenaga Kerja
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.089 -
2 TukangKayu L.02 OH 0.030 -
4 Mandor L.04 OH 0.005 -
Jumlah Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.071 -
2 TukangKayu L.02 OH 0.024 -
4 Mandor L.04 OH 0.005 -
Jumlah Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
A.4.2.1.4. Pembuatan 1 m² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.050 -
2 Tukang Las Biasa L.02 OH 1.050 -
A.4.2.1.19. Pemasangan 1 m¹ talang ½ lingkaran Ø15 cm, seng plat bjls 30 lebar 45 cm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.150 82,500.00
A.4.2.1.20. Pemasangan 1 m² rangka besi holow 1 x 40 x 40 x 2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.250 82,500.00
2 Tukang Besi L.02 OH 0.250 88,000.00
3 Kepala Tukang L.03 OH 0.0250 88,000.00
4 Mandor L.04 OH 0.0130 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Rangka Metal Hollow 40.40.2
m¹ 1.050 7,000.00
mm
2 Assesoris ( Perkuatan, Las dll 100% x
Ls 7,000.00
) Rangka
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.1.5. Pemasangan 1 m² langit-langit tripleks ukuran ( 120 x 240 ) cm, tebal 3 mm, 4 mm & 6 mm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
A.4.5.1.7. Pemasangan 1 m² langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tebal 9 mm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.100 82,500.00
A.4.5.1.7. Pemasangan 1 m² langit-langit Semen Asbes board ukuran ( 120 x 240 x 4 ) mm, tebal 4 mm
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.100 82,500.00
2 Tukang Kayu L.02 OH 0.050 88,000.00
3 Kepala Tukang L.03 OH 0.005 88,000.00
4 Mandor L.04 OH 0.005 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Semen Asbes Lembar 0.364 77,000.00
2 Paku Skrup Kg 0.110 22,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.1.8. Pemasangan 1 m² langit-langit akustik ukuran ( 60 x 120 ) cm, berikut rangka alluminium
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.500 -
2 Tukang Besi L.02 OH 0.500 -
3 Kepala Tukang L.03 OH 0.050 -
4 Mandor L.04 OH 0.025 -
Jumlah Tenaga Kerja
B Bahan
1 Profil Alluminium "T" m 3.600 -
2 Kawat Ø4 mm Kg 0.150 -
3 Ramset Buah 1.050 -
4 Akustik 60 x 120 Lembar 1.500 -
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.2. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II & III
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 6.000 82,500.00
2 Tukang Kayu L.02 OH 18.000 88,000.00
3 Kepala Tukang L.03 OH 1.8000 88,000.00
A.4.6.1.3. Pembuatan dan pemasangan 1 m² kusen pintu klamp standar, kayu kelas II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.350 -
2 Tukang Kayu L.02 OH 1.050 -
3 Kepala Tukang L.03 OH 0.1050 -
4 Mandor L.04 OH 0.018 -
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.040 -
2 Paku 5 - 7 cm Kg 0.050 -
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.4. Pembuatan dan pemasangan 1 m² kusen pintu klamp sederhana, kayu kelas III
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.350 -
2 Tukang Kayu L.02 OH 1.050 -
3 Kepala Tukang L.03 OH 0.1050 -
4 Mandor L.04 OH 0.018 -
Jumlah Tenaga Kerja
B Bahan
A.4.6.1.5. Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas I atau II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.000 82,500.00
2 Tukang Kayu L.02 OH 3.000 88,000.00
3 Kepala Tukang L.03 OH 0.3000 88,000.00
4 Mandor L.04 OH 0.050 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.040 3,800,000.00
2 Lem Kayu Kg 0.500 34,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.6. Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.800 82,500.00
2 Tukang Kayu L.02 OH 2.400 88,000.00
3 Kepala Tukang L.03 OH 0.2400 88,000.00
4 Mandor L.04 OH 0.040 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.024 3,800,000.00
2 Lem Kayu Kg 0.300 34,000.00
Jumlah Harga Bahan
C Peralatan
A.4.6.1.7. Pembuatan dan pemasangan 1 m² pintu dan jendela jalusi, kayu kelas I atau II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 1.000 82,500.00
2 Tukang Kayu L.02 OH 3.000 88,000.00
3 Kepala Tukang L.03 OH 0.3000 88,000.00
4 Mandor L.04 OH 0.050 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.064 3,800,000.00
2 Lem Kayu Kg 0.500 34,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.8. Pembuatan 1 m² daun pintu plywood rangkap, rangka kayu kelas II tertutup ( lebar sampai 90 cm )
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.700 82,500.00
2 Tukang Kayu L.02 OH 2.100 88,000.00
3 Kepala Tukang L.03 OH 0.2100 88,000.00
4 Mandor L.04 OH 0.035 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.025 3,800,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 18,000.00
3 Lem Kayu Kg 0.500 34,000.00
4 Plywood tebal 4 mm ukuran
Lembar 0.035 65,000.00
( 90 x 220 ) cm
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
A.4.6.1.9. Pembuatan 1 m² pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.800 82,500.00
2 Tukang Kayu L.02 OH 2.400 88,000.00
3 Kepala Tukang L.03 OH 0.2400 88,000.00
4 Mandor L.04 OH 0.040 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.0256 3,800,000.00
2 Paku 1 cm - 2,5 cm Kg 0.030 18,000.00
3 Lem Kayu Kg 0.500 34,000.00
4 Plywood tebal 4 mm ukuran
Lembar 1.000 65,000.00
( 90 x 220 ) cm
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.12. Pemasangan 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.850 -
2 Tukang Kayu L.02 OH 2.550 -
3 Kepala Tukang L.03 OH 0.2550 -
4 Mandor L.04 OH 0.043 -
Jumlah Tenaga Kerja
B Bahan
1 Papan Kayu m³ 0.0250 -
2 Paku 1 cm - 2,5 cm Kg 0.030 -
3 Lem Kayu Kg 0.800 -
4 Teakwood tebal 4 mm ukuran
Lembar 1.000 -
( 90 x 220 ) cm
5 Formika Lembar 0.500 -
Jumlah Harga Bahan
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.150 82,500.00
2 Tukang Kayu L.02 OH 0.300 88,000.00
3 Kepala Tukang L.03 OH 0.0300 88,000.00
4 Mandor L.04 OH 0.075 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0154 3,200,000.00
2 Paku 7 cm - 10 cm Kg 0.200 18,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.23. Pemasangan 1 m² rangka dinding pemisah ( 60 x 120 ) cm, kayu kelas II atau III
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.150 82,500.00
2 Tukang Kayu L.02 OH 0.450 88,000.00
3 Kepala Tukang L.03 OH 0.0450 88,000.00
4 Mandor L.04 OH 0.008 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Balok Kayu m³ 0.0280 3,200,000.00
2 Paku 5 cm dan 7 cm Kg 0.150 18,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.4. 1 m² pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
A.4.7.1.5. 1 m² pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.070 82,500.00
2 Tukang Cat L.02 OH 0.105 88,000.00
3 Kepala Tukang L.03 OH 0.004 88,000.00
4 Mandor L.04 OH 0.003 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Cat Menie Kg 0.200 50,000.00
2 Plamir Kg 0.150 50,000.00
3 Cat Dasar Kg 0.170 60,000.00
4 Cat Penutup Kg 0.350 60,000.00
5 Kuas Buah 0.010 8,000.00
6 Pengencer Kg 0.030 20,000.00
7 Ampelas Lembar 0.200 10,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan
No. URAIAN KODE Satuan Koefesian
A.4.7.1.11. Pengecataan 1 m² tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.028 82,500.00
2 Tukang Cat L.02 OH 0.042 88,000.00
3 Kepala Tukang L.03 OH 0.0042 88,000.00
4 Mandor L.04 OH 0.003 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Cat Dasar Kg 0.120 20,000.00
2 Cat Penutup Kg 0.180 35,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.19. Pengecatan 1 m² permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.060 -
2 Tukang Cat L.02 OH 0.060 -
3 Kepala Tukang L.03 OH 0.012 -
A.4.7.1.21. Pengecatan 1 m² permukaan baja galvanis secara semprot sistem 3 lapis cat
Harga Satuan
No. URAIAN KODE Satuan Koefesian
( Rp. )
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 OH 0.400 -
2 Tukang Cat L.02 OH 0.700 -
3 Kepala Tukang L.03 OH 0.070 -
A Tenaga
1 Pekerja L.01 OH 2.160 82,500.00
2 Tukang Batu L.02 OH 0.720 88,000.00
3 Kepala Tukang L.03 OH 0.072 88,000.00
4 Mandor L.04 OH 0.011 99,000.00
Jumlah Tenaga Kerja
B Bahan
1 Bata Merah Buah 40.000 1,050.00
2 Semen Portland Kg 44.000 1,480.00
3 Pasir Pasang m³ 0.070 90,000.00
4 Pasir Beton m³ 0.060 90,000.00
5 Kerikil m³ 0.070 400,000.00
6 Baja Tulangan Kg 1.600 12,467.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C )
E Overhead + Profit ( Contoh 15% ) 15% x D
F Harga Satuan Pekerjaan ( D + E )
8,250.00
4,950.00
13,200.00
0
13,200.00
1,980.00
15,180.00
JUMLAH
( Rp. )
7
16,500.00
35,200.00
1,760.00
1,980.00
55,440.00
50,000.00
230,400.00
3,700.00
45,600.00
450.00
3,600.00
22,500.00
3,700.00
359,950.00
0
415,390.00
62,308.50
477,698.50
8,250.00
8,800.00
880.00
4,950.00
22,880.00
22,400.00
38,400.00
360.00
61,160.00
0
84,040.00
12,606.00
96,646.00
JUMLAH
( Rp. )
7
26,400.00
2,640.00
29,040.00
115,200.00
-
1,440.00
116,640.00
0
145,680.00
21,852.00
167,532.00
1,100,880.00
65,934.00
1,166,814.00
0
1,166,814.00
175,022.10
1,341,836.10
JUMLAH
( Rp. )
7
550,027.50
32,967.00
582,994.50
0
582,994.50
87,449.18
670,443.68
JUMLAH
( Rp. )
7
3,465.00
352.00
176.00
4,158.00
8,151.00
53,775.00
0
61,926.00
9,288.90
71,214.90
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
AN TANAH
JUMLAH
( Rp. )
7
61,875.00
2,475.00
64,350.00
0
64,350.00
9,652.50
74,002.50
JUMLAH
( Rp. )
7
74,250.00
4,455.00
78,705.00
0
78,705.00
11,805.75
JUMLAH
( Rp. )
7
86,625.00
6,633.00
93,258.00
0
93,258.00
13,988.70
107,246.70
JUMLAH
( Rp. )
7
82,500.00
3,168.00
85,668.00
0
85,668.00
12,850.20
98,518.20
JUMLAH
( Rp. )
7
123,750.00
5,940.00
129,690.00
0
129,690.00
19,453.50
149,143.50
JUMLAH
( Rp. )
7
99,000.00
4,455.00
103,455.00
0
103,455.00
15,518.25
118,973.25
JUMLAH
( Rp. )
7
27,225.00
990.00
28,215.00
0
28,215.00
4,232.25
32,447.25
JUMLAH
( Rp. )
7
0
46,200.00
6,930.00
53,130.00
JUMLAH
( Rp. )
7
41,250.00
4,950.00
46,200.00
0
46,200.00
6,930.00
53,130.00
JUMLAH
( Rp. )
7
24,750.00
990.00
25,740.00
96,000.00
96,000.00
0
121,740.00
18,261.00
JUMLAH
( Rp. )
7
20,625.00
2,475.00
23,100.00
300,000.00
300,000.00
0
323,100.00
48,465.00
371,565.00
N PONDASI
JUMLAH
( Rp. )
7
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
298,960.00
43,650.00
846,610.00
0
1,050,385.00
157,557.75
1,207,942.75
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
241,240.00
46,800.00
792,040.00
0
995,815.00
149,372.25
1,145,187.25
JUMLAH
( Rp. )
7
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
241,240.00
48,960.00
794,200.00
0
997,975.00
149,696.25
1,147,671.25
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
173,160.00
50,490.00
727,650.00
0
931,425.00
139,713.75
1,071,138.75
JUMLAH
( Rp. )
7
123,750.00
66,000.00
6,600.00
7,425.00
203,775.00
504,000.00
134,680.00
52,560.00
691,240.00
0
895,015.00
134,252.25
1,029,267.25
-
-
-
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
0
-
-
-
-
-
-
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
64,350.00
34,320.00
3,432.00
3,861.00
105,963.00
504,000.00
34,560.00
538,560.00
0
644,523.00
96,678.45
741,201.45
280,500.00
74,800.00
7,480.00
16,830.00
379,610.00
201,600.00
287,120.00
28,080.00
117,000.00
1,570,842.00
32,400.00
2,237,042.00
0
2,616,652.00
392,497.80
3,009,149.80
JUMLAH
( Rp. )
7
198,000.00
70,400.00
7,040.00
11,781.00
287,221.00
189,000.00
287,120.00
28,080.00
117,000.00
621,200.00
0
908,421.00
136,263.15
1,044,684.15
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
365,560.00
48,881.25
275,586.21
9,675.00
699,702.46
0
870,708.46
130,606.27
1,001,314.73
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
408,480.00
46,575.00
279,172.41
9,675.00
743,902.41
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
442,520.00
44,943.75
280,551.72
9,675.00
777,690.47
0
948,696.47
142,304.47
1,091,000.95
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
442,520.00
44,943.75
0
948,696.47
142,304.47
1,091,000.95
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
482,480.00
42,750.00
283,862.07
9,675.00
818,767.07
0
989,773.07
148,465.96
1,138,239.03
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
520,960.00
0
1,027,173.54
154,076.03
1,181,249.57
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
549,080.00
39,262.50
288,827.59
9,675.00
886,845.09
0
1,057,851.09
158,677.66
1,216,528.75
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
0
1,074,546.69
161,182.00
1,235,728.69
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
600,880.00
38,475.00
283,034.48
9,675.00
932,064.48
0
1,103,070.48
165,460.57
1,268,531.06
136,125.00
24,200.00
2,464.00
8,217.00
171,006.00
0
1,111,882.42
166,782.36
1,278,664.79
173,250.00
30,800.00
3,080.00
10,395.00
217,525.00
649,720.00
37,687.50
277,517.24
9,675.00
974,599.74
0
1,192,124.74
178,818.71
1,370,943.45
173,250.00
30,800.00
3,080.00
10,395.00
217,525.00
0
1,203,620.82
180,543.12
1,384,163.94
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
5,775.00
6,160.00
616.00
396.00
12,947.00
157,271.24
2,700.00
159,971.24
0
172,918.24
JUMLAH
( Rp. )
7
5,775.00
6,160.00
616.00
396.00
12,947.00
130,903.50
2,700.00
133,603.50
0
146,550.50
21,982.58
168,533.08
16,853.31
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
JUMLAH
( Rp. )
7
2,062.50
2,200.00
2,200.00
99.00
6,561.50
161,826.92
900.00
162,726.92
0
169,288.42
25,393.26
194,681.69
19,468.17
JUMLAH
( Rp. )
7
42,900.00
22,880.00
2,288.00
2,574.00
70,642.00
128,000.00
5,400.00
400.00
133,800.00
0
204,442.00
JUMLAH
( Rp. )
7
42,900.00
22,880.00
2,288.00
2,574.00
70,642.00
144,000.00
5,400.00
400.00
149,800.00
0
220,442.00
33,066.30
253,508.30
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
297.00
86,691.00
128,000.00
7,200.00
800.00
57,000.00
64,750.00
80,000.00
337,750.00
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
297.00
86,691.00
128,000.00
7,200.00
800.00
68,400.00
64,750.00
80,000.00
349,150.00
0
435,841.00
65,376.15
501,217.15
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
3,267.00
89,661.00
128,000.00
0
587,411.00
88,111.65
675,522.65
JUMLAH
( Rp. )
7
54,450.00
29,040.00
2,904.00
3,267.00
89,661.00
96,000.00
7,200.00
800.00
76,000.00
64,750.00
120,000.00
-
364,750.00
0
454,411.00
68,161.65
522,572.65
JUMLAH
( Rp. )
7
96,000.00
7,200.00
600.00
57,000.00
64,750.00
80,000.00
305,550.00
0
395,211.00
59,281.65
454,492.65
JUMLAH
( Rp. )
7
12,375.00
4,400.00
440.00
792.00
18,007.00
84,480.00
10,800.00
20,000.00
115,280.00
0
133,287.00
19,993.05
153,280.05
437,250.00
24,200.00
114,400.00
92,400.00
23,056.00
26,235.00
717,541.00
640,000.00
2,700.00
1,600.00
1,963,552.50
40,500.00
497,280.00
48,600.00
324,000.00
3,518,232.50
0
4,235,773.50
635,366.03
4,871,139.53
JUMLAH
( Rp. )
7
466,125.00
24,200.00
137,280.00
123,200.00
28,424.00
28,017.00
807,246.00
864,000.00
36,000.00
2,400.00
2,618,070.00
0
5,251,596.00
787,739.40
6,039,335.40
JUMLAH
( Rp. )
7
581,625.00
24,200.00
145,200.00
184,800.00
35,464.00
34,947.00
1,006,236.00
1,280,000.00
72,000.00
8,000.00
3,927,105.00
81,000.00
497,280.00
48,600.00
324,000.00
570,000.00
647,500.00
800,000.00
8,255,485.00
0
9,261,721.00
1,389,258.15
10,650,979.15
523,875.00
24,200.00
145,200.00
123,200.00
29,304.00
31,482.00
877,261.00
1,024,000.00
57,600.00
6,400.00
2,618,070.00
54,000.00
497,280.00
48,600.00
324,000.00
532,000.00
518,000.00
640,000.00
6,319,950.00
0
7,197,211.00
1,079,581.65
8,276,792.65
JUMLAH
( Rp. )
7
437,250.00
24,200.00
114,400.00
92,400.00
23,320.00
26,235.00
717,805.00
0
6,933,737.50
1,040,060.63
7,973,798.13
JUMLAH
( Rp. )
7
437,250.00
24,200.00
114,400.00
92,400.00
23,056.00
26,235.00
717,541.00
768,000.00
57,600.00
6,400.00
1,963,552.50
40,500.00
497,280.00
48,600.00
324,000.00
608,000.00
518,000.00
960,000.00
-
0
6,509,473.50
976,421.03
7,485,894.53
JUMLAH
( Rp. )
7
466,125.00
24,200.00
137,280.00
123,200.00
28,424.00
28,017.00
807,246.00
800,000.00
54,000.00
4,800.00
2,618,070.00
54,000.00
497,280.00
48,600.00
324,000.00
399,000.00
462,500.00
560,000.00
-
5,822,250.00
0
6,629,496.00
994,424.40
7,623,920.40
JUMLAH
( Rp. )
7
6,400.00
180.00
-
37,401.00
8,100.00
5,920.00
540.00
3,600.00
62,141.00
0
96,461.00
14,469.15
110,930.15
JUMLAH
( Rp. )
7
24,502.50
2,904.00
2,904.00
2,904.00
880.00
1,485.00
35,579.50
9,600.00
360.00
-
44,881.20
900.00
8,140.00
810.00
0
106,270.70
15,940.61
122,211.31
TON PRACETAK
175 ) slump ( 12 ± 2 ) cm
JUMLAH
( Rp. )
7
10,890.00
1,936.00
176.00
693.00
13,695.00
38,598.40
5,472,000.00
32,928,000.00
774.00
38,439,372.40
0
38,453,067.40
5,767,960.11
44,221,027.51
- 175 ) slump ( 12 ± 2 ) cm
JUMLAH
( Rp. )
7
13,612.50
2,464.00
264.00
792.00
17,132.50
0
48,066,348.00
7,209,952.20
55,276,300.20
- 175 ) slump ( 12 ± 2 ) cm
JUMLAH
( Rp. )
7
16,335.00
2,904.00
264.00
990.00
20,493.00
47,537.60
8,208,000.00
49,392,000.00
1,161.00
57,648,698.60
0
57,669,191.60
8,650,378.74
66,319,570.34
- 175 ) slump ( 12 ± 2 ) cm
JUMLAH
( Rp. )
7
20,460.00
3,608.00
352.00
1,287.00
25,707.00
0
72,099,530.25
10,814,929.54
82,914,459.79
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
0
-
-
-
JUMLAH
( Rp. )
7
0
-
-
-
n pracetak
JUMLAH
( Rp. )
7
-
-
-
-
0
-
-
-
on pracetak
JUMLAH
( Rp. )
7
-
-
-
-
0
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
-
-
-
JUMLAH
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
-
-
-
-
-
-
-
-
-
-
-
-
N BESI DAN
JUMLAH
( Rp. )
7
4,950.00
5,280.00
528.00
297.00
11,055.00
17,710.00
17,710.00
0
28,765.00
4,314.75
33,079.75
JUMLAH
( Rp. )
7
18,975.00
18,975.00
0
30,030.00
4,504.50
34,534.50
JUMLAH
( Rp. )
7
8,250.00
8,800.00
88.00
495.00
17,633.00
5,500.00
3,500.00
9,000.00
-
-
26,633.00
3,994.95
30,627.95
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
3,300.00
1,760.00
176.00
198.00
5,434.00
2,420.00
1,650.00
1,400.00
5,470.00
-
0
10,904.00
1,635.60
12,539.60
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
99,000.00
105,600.00
10,560.00
594.00
215,754.00
2,400,000.00
2,400,000.00
0
2,615,754.00
392,363.10
3,008,117.10
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
6,600.00
70,400.00
7,040.00
396.00
84,436.00
240,000.00
240,000.00
0
324,436.00
48,665.40
373,101.40
JUMLAH
( Rp. )
7
82,500.00
88,000.00
8,800.00
4,950.00
184,250.00
2,400,000.00
2,400,000.00
0
2,584,250.00
387,637.50
2,971,887.50
3,547.50
3,784.00
378.40
207.90
7,917.80
192,500.00
600.00
1,800.00
194,900.00
0
202,817.80
30,422.67
233,240.47
JUMLAH
( Rp. )
7
7,012.50
7,480.00
748.00
415.80
15,656.30
770,000.00
657,000.00
1,427,000.00
0
1,442,656.30
216,398.45
1,659,054.75
7,012.50
7,480.00
792.00
495.00
15,779.50
770,000.00
540,000.00
8,100.00
1,318,100.00
0
1,333,879.50
200,081.93
1,533,961.43
JUMLAH
( Rp. )
7
28,875.00
30,800.00
3,080.00
1,782.00
64,537.00
198,000.00
198,000.00
0
262,537.00
39,380.55
301,917.55
JUMLAH
( Rp. )
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
8,250.00
8,800.00
880.00
495.00
18,425.00
27,830.00
13,931.50
28,314.00
70,075.50
0
88,500.50
13,275.07
101,775.57
JUMLAH
( Rp. )
7
0
-
-
-
JUMLAH
( Rp. )
7
16,500.00
17,600.00
1,760.00
99.00
35,959.00
68,250.00
270.00
72,200.00
140,720.00
0
176,679.00
26,501.85
203,180.85
JUMLAH
( Rp. )
7
12,375.00
68,250.00
180.00
7,700.00
76,130.00
0
118,337.00
17,750.55
136,087.55
20,625.00
22,000.00
2,200.00
1,287.00
46,112.00
7,350.00
7,000.00
14,350.00
0
60,462.00
9,069.30
69,531.30
x 60 cm, plafond
JUMLAH
( Rp. )
7
28,875.00
28,000.00
7,000.00
35,000.00
0
99,537.00
14,930.55
114,467.55
ANGAN DINDING
tu campuran 1 SP : 2 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
campuran 1 SP : 2 PP
JUMLAH
( Rp. )
41,250.00
1,760.00
1,760.00
2,475.00
47,245.00
115,500.00
50,584.29
5,657.14
171,741.43
0
218,986.43
32,847.96
251,834.39
tu campuran 1 SP : 3 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
tu campuran 1 SP : 4 PP
JUMLAH
( Rp. )
7
-
-
-
-
0
-
-
-
u campuran 1 SP : 4 PP
JUMLAH
( Rp. )
7
41,250.00
17,600.00
1,760.00
2,475.00
63,085.00
115,500.00
30,873.86
6,576.43
152,950.29
0
216,035.29
32,405.29
248,440.58
tu campuran 1 SP : 5 PP
JUMLAH
( Rp. )
7
-
-
-
-
0
-
-
-
tu campuran 1 SP : 6 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
tu campuran 1 SP : 3 KP : 10 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
atu campuran 1 SP : 2 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
u campuran 1 SP : 2 PP
JUMLAH
( Rp. )
7
19,446.43
6,914.29
691.43
1,166.79
57,750.00
22,036.14
2,687.14
82,473.29
0
110,692.21
16,603.83
127,296.05
atu campuran 1 SP : 3 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
atu campuran 1 SP : 4 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
u campuran 1 SP : 4 PP
JUMLAH
( Rp. )
7
19,446.43
6,914.29
691.43
1,166.79
28,218.93
57,750.00
13,372.86
3,040.71
74,163.57
0
102,382.50
15,357.38
117,739.88
atu campuran 1 SP : 5 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
atu campuran 1 SP : 6 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
atu campuran 1 SP : 8 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
atu campuran 1 SP : 3 KP : 10 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
ran 1 SP : 3 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
ran 1 SP : 4 PP
JUMLAH
( Rp. )
7
24,750.00
8,800.00
880.00
1,485.00
35,915.00
750,000.00
16,280.00
3,150.00
769,430.00
0
805,345.00
120,801.75
926,146.75
mpuran 1 SP : 3 PP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
PLESTERAN
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
22,945.92
1,440.00
24,385.92
0
65,140.92
9,771.14
74,912.06
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
15,131.52
1,800.00
16,931.52
0
57,686.52
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
11,508.48
2,070.00
13,578.48
0
54,333.48
8,150.02
62,483.50
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
9,235.20
2,160.00
11,395.20
0
52,150.20
7,822.53
59,972.73
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
7,672.32
2,340.00
10,012.32
0
50,767.32
7,615.10
58,382.42
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
6,535.68
2,430.00
8,965.68
0
49,720.68
7,458.10
57,178.78
JUMLAH
( Rp. )
7
5,825.28
2,520.00
8,345.28
0
49,100.28
7,365.04
56,465.32
JUMLAH
( Rp. )
7
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
5,114.88
2,610.00
7,724.88
0
48,479.88
7,271.98
55,751.86
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
33,000.00
17,600.00
1,760.00
2,178.00
54,538.00
0
77,143.36
11,571.50
88,714.86
JUMLAH
( Rp. )
7
21,450.00
17,600.00
1,760.00
1,287.00
42,097.00
15,344.64
2,790.00
18,134.64
0
60,231.64
9,034.75
69,266.39
JUMLAH
( Rp. )
7
33,000.00
17,600.00
1,760.00
2,178.00
54,538.00
12,313.60
2,880.00
0
69,731.60
10,459.74
80,191.34
JUMLAH
( Rp. )
7
33,000.00
17,600.00
1,760.00
2,178.00
54,538.00
10,229.76
3,150.00
13,379.76
0
67,917.76
10,187.66
78,105.42
JUMLAH
( Rp. )
7
33,000.00
17,600.00
1,760.00
2,178.00
54,538.00
8,714.24
3,240.00
11,954.24
0
66,492.24
JUMLAH
( Rp. )
7
24,750.00
8,800.00
880.00
1,485.00
35,915.00
6,393.60
540.00
6,933.60
0
42,848.60
6,427.29
49,275.89
JUMLAH
( Rp. )
7
12,375.00
6,600.00
704.00
792.00
20,471.00
4,599.84
4,599.84
0
25,070.84
3,760.63
28,831.47
24,750.00
13,200.00
1,320.00
1,485.00
40,755.00
9,383.20
1,080.00
10,463.20
0
51,218.20
7,682.73
58,900.93
JUMLAH
( Rp. )
7
16,500.00
8,800.00
880.00
990.00
27,170.00
4,810.00
4,810.00
0
31,980.00
4,797.00
36,777.00
NUTUP LANTAI
JUMLAH
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
u 5 cm x 20 cm
JUMLAH
( Rp. )
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
57,750.00
30,800.00
3,080.00
3,465.00
95,095.00
97,118.18
14,800.00
4,050.00
3,300.00
119,268.18
0
214,363.18
32,154.48
246,517.66
JUMLAH
( Rp. )
7
57,750.00
30,800.00
3,080.00
3,465.00
95,095.00
98,214.29
14,800.00
4,050.00
3,300.00
120,364.29
0
215,459.29
32,318.89
247,778.18
JUMLAH
( Rp. )
57,750.00
30,800.00
3,080.00
3,465.00
95,095.00
90,100.00
15,392.00
4,050.00
3,564.00
113,106.00
0
208,201.00
31,230.15
239,431.15
variasi / border
JUMLAH
( Rp. )
7
86,625.00
46,200.00
4,664.00
5,247.00
142,736.00
90,000.00
14,504.00
4,050.00
9,614.00
118,168.00
0
260,904.00
39,135.60
300,039.60
JUMLAH
( Rp. )
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
918,750.00
20,400.00
939,150.00
0
1,034,245.00
155,136.75
1,189,381.75
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
74,250.00
39,600.00
3,960.00
4,455.00
122,265.00
180,200.00
13,764.00
1,620.00
6,050.00
201,634.00
0
323,899.00
48,584.85
372,483.85
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
74,250.00
39,600.00
3,960.00
90,100.00
13,764.00
1,620.00
4,268.00
109,752.00
0
232,017.00
34,802.55
266,819.55
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
57,750.00
30,800.00
3,080.00
330,000.00
17,390.00
3,150.00
350,540.00
0
445,635.00
66,845.25
512,480.25
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
28,875.00
15,400.00
1,496.00
198.00
45,969.00
0
229,369.00
34,405.35
263,774.35
JUMLAH
( Rp. )
7
28,875.00
15,400.00
1,496.00
198.00
45,969.00
89,915.00
8,500.00
98,415.00
0
144,384.00
21,657.60
166,041.60
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
8,250.00
8,800.00
880.00
495.00
18,425.00
20,625.00
540.00
21,165.00
0
39,590.00
5,938.50
45,528.50
JUMLAH
( Rp. )
7
66,000.00
70,400.00
7,040.00
3,960.00
147,400.00
48,000.00
180.00
48,180.00
0
195,580.00
29,337.00
224,917.00
9 ) mm, tebal 9 mm
JUMLAH
( Rp. )
7
8,250.00
24,752.00
2,420.00
27,172.00
0
40,757.00
6,113.55
46,870.55
8,250.00
4,400.00
440.00
495.00
13,585.00
28,028.00
2,420.00
30,448.00
0
44,033.00
6,604.95
50,637.95
JUMLAH
( Rp. )
7
41,250.00
22,000.00
2,200.00
2,475.00
67,925.00
0
483,974.06
72,596.11
556,570.17
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
4,125.00
4,400.00
440.00
297.00
9,262.00
0
26,242.00
3,936.30
30,178.30
ENUTUP ATAP
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
9,900.00
5,280.00
528.00
594.00
16,302.00
26,600.00
500.00
27,100.00
0
43,402.00
6,510.30
49,912.30
12,375.00
6,160.00
616.00
594.00
19,745.00
11,700.00
1,000.00
12,700.00
0
32,445.00
4,866.75
37,311.75
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
9,900.00
5,280.00
528.00
594.00
16,302.00
31,500.00
440.00
31,940.00
0
48,242.00
7,236.30
55,478.30
JUMLAH
( Rp. )
7
79,560.00
3,600.00
83,160.00
0
109,439.00
16,415.85
125,854.85
JUMLAH
( Rp. )
7
9,900.00
5,280.00
528.00
594.00
16,302.00
173,250.00
5,111.90
178,361.90
0
194,663.90
29,199.59
223,863.49
JUMLAH
( Rp. )
7
20,625.00
13,200.00
1,320.00
1,287.00
61,600.00
880.00
62,480.00
0
98,912.00
14,836.80
113,748.80
AN KAYU
kayu kelas I
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
495,000.00
1,584,000.00
158,400.00
4,560,000.00
22,500.00
34,000.00
4,616,500.00
0
6,883,600.00
1,032,540.00
7,916,140.00
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
82,500.00
264,000.00
26,400.00
4,950.00
377,850.00
152,000.00
17,000.00
169,000.00
0
546,850.00
82,027.50
628,877.50
as I atau II
JUMLAH
( Rp. )
7
66,000.00
211,200.00
21,120.00
3,960.00
302,280.00
91,200.00
10,200.00
101,400.00
las I atau II
JUMLAH
( Rp. )
7
82,500.00
264,000.00
26,400.00
4,950.00
377,850.00
243,200.00
17,000.00
260,200.00
0
638,050.00
95,707.50
733,757.50
57,750.00
184,800.00
18,480.00
3,465.00
264,495.00
95,000.00
540.00
17,000.00
2,275.00
114,815.00
JUMLAH
( Rp. )
7
66,000.00
211,200.00
21,120.00
3,960.00
302,280.00
97,280.00
540.00
17,000.00
65,000.00
179,820.00
0
482,100.00
72,315.00
554,415.00
JUMLAH
( Rp. )
7
55,275.00
176,000.00
17,600.00
33,165.00
282,040.00
228,000.00
2,700.00
230,700.00
0
512,740.00
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
kayu kelas II
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
330,000.00
1,056,000.00
105,600.00
19,800.00
1,511,400.00
4,180,000.00
231,000.00
100,800.00
4,511,800.00
0
6,023,200.00
903,480.00
6,926,680.00
JUMLAH
( Rp. )
7
552,750.00
1,768,800.00
176,880.00
33,165.00
2,321,550.00
4,560,000.00
231,000.00
100,800.00
4,891,800.00
JUMLAH
( Rp. )
7
552,750.00
1,768,800.00
176,880.00
33,165.00
2,531,595.00
4,180,000.00
231,000.00
54,000.00
4,465,000.00
0
6,996,595.00
1,049,489.25
8,046,084.25
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
12,375.00
26,400.00
2,640.00
7,425.00
48,840.00
49,280.00
3,600.00
52,880.00
0
101,720.00
15,258.00
116,978.00
16,500.00
26,400.00
2,640.00
990.00
46,530.00
52,160.00
4,500.00
56,660.00
0
103,190.00
15,478.50
118,668.50
JUMLAH
( Rp. )
7
8,250.00
17,600.00
1,760.00
495.00
28,105.00
34,560.00
1,800.00
36,360.00
0
64,465.00
9,669.75
74,134.75
JUMLAH
( Rp. )
7
35,200.00
900.00
36,100.00
0
64,205.00
9,630.75
73,835.75
12,375.00
39,600.00
3,960.00
792.00
56,727.00
89,600.00
2,700.00
92,300.00
0
149,027.00
22,354.05
171,381.05
JUMLAH
( Rp. )
7
12,375.00
39,600.00
3,960.00
106,400.00
2,700.00
55,900.00
19,040.00
184,040.00
0
240,767.00
36,115.05
276,882.05
JUMLAH
( Rp. )
7
16,500.00
52,800.00
5,280.00
990.00
75,570.00
106,400.00
2,700.00
55,900.00
19,040.00
184,040.00
0
259,610.00
38,941.50
298,551.50
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
225,000.00
225,000.00
0
269,825.00
40,473.75
310,298.75
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
1,237.50
13,200.00
1,320.00
79.20
15,836.70
40,000.00
40,000.00
0
55,836.70
8,375.51
64,212.21
JUMLAH
( Rp. )
7
825.00
8,800.00
880.00
49.50
10,554.50
35,000.00
35,000.00
0
45,554.50
6,833.18
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
1,237.50
13,200.00
1,320.00
792.00
16,549.50
30,000.00
30,000.00
0
46,549.50
6,982.43
53,531.93
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
1,237.50
13,200.00
132.00
79.20
14,648.70
132,000.00
1,500.00
133,500.00
0
148,148.70
22,222.31
170,371.01
JUMLAH
( Rp. )
1,402.50
14,960.00
1,496.00
89.10
17,947.60
495,000.00
2,100.00
497,100.00
0
515,047.60
77,257.14
592,304.74
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
PENGECATAN
JUMLAH
( Rp. )
7
12,375.00
297.00
12,672.00
600.00
600.00
JUMLAH
( Rp. )
7
12,375.00
297.00
12,375.00
700.00
700.00
0
13,075.00
1,961.25
15,036.25
JUMLAH
( Rp. )
7
12,375.00
792.00
12,375.00
700.00
700.00
0
13,075.00
1,961.25
15,036.25
10,000.00
7,500.00
10,200.00
15,600.00
80.00
600.00
2,000.00
45,980.00
0
53,372.00
8,005.80
61,377.80
5,775.00
9,240.00
352.00
297.00
15,664.00
10,000.00
7,500.00
10,200.00
21,000.00
80.00
600.00
2,000.00
51,380.00
0
67,044.00
10,056.60
77,100.60
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
1,650.00
5,544.00
554.40
297.00
8,045.40
5,000.00
2,000.00
9,100.00
16,100.00
0
24,145.40
3,621.81
27,767.21
JUMLAH
( Rp. )
7
2,310.00
3,696.00
369.60
297.00
6,672.60
2,400.00
6,300.00
8,700.00
0
15,372.60
2,305.89
17,678.49
JUMLAH
( Rp. )
7
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
1,650.00
17,600.00
1,760.00
247.50
21,257.50
5,000.00
80.00
5,080.00
0
26,337.50
3,950.63
30,288.13
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0
-
-
-
ANITASI DALAM
JUMLAH
( Rp. )
7
272,250.00
96,800.00
880.00
15,840.00
385,770.00
1,800,000.00
108,000.00
1,908,000.00
0
2,293,770.00
344,065.50
2,637,835.50
JUMLAH
( Rp. )
7
82,500.00
132,000.00
13,200.00
280,000.00
8,880.00
900.00
289,780.00
0
533,320.00
79,998.00
613,318.00
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
82,500.00
88,000.00
8,800.00
4,950.00
2,100,000.00
8,880.00
900.00
632,934.00
2,742,714.00
0
2,926,964.00
439,044.60
3,366,008.60
JUMLAH
( Rp. )
7
99,000.00
127,600.00
13,200.00
5,940.00
245,740.00
1,320,000.00
8,880.00
900.00
159,573.60
1,489,353.60
0
1,735,093.60
260,264.04
1,995,357.64
JUMLAH
( Rp. )
7
-
-
-
-
-
0.20
0.20
0
0.20
0.03
0.23
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
495,000.00
264,000.00
26,400.00
2,970.00
788,370.00
157,500.00
177,600.00
0
1,667,670.00
250,150.50
1,917,820.50
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
0.12
0.12
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
0.10
-
0
-
-
-
JUMLAH
( Rp. )
7
2,475.00
26,400.00
2,640.00
1,485.00
33,000.00
405,000.00
-
405,000.00
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
825.00
8,800.00
880.00
495.00
11,000.00
85,000.00
85,000.00
0
96,000.00
JUMLAH
( Rp. )
7
178,200.00
63,360.00
6,336.00
1,089.00
248,985.00
42,000.00
65,120.00
6,300.00
5,400.00
28,000.00
19,947.20
166,767.20
0
415,752.20
62,362.83
478,115.03
JUMLAH
( Rp. )
7
264,000.00
101,200.00
968.00
1,584.00
367,752.00
73,500.00
113,960.00
11,700.00
8,100.00
8,000.00
0
615,426.20
92,313.93
707,740.13
JUMLAH
( Rp. )
7
264,000.00
101,200.00
968.00
1,584.00
367,752.00
129,150.00
168,720.00
16,560.00
10,800.00
13,200.00
60,464.95
398,894.95
0
766,646.95
114,997.04
881,643.99
JUMLAH
( Rp. )
7
825.00
35,200.00
3,520.00
495.00
40,040.00
25,245.00
0
72,648.13
10,897.22
83,545.34
JUMLAH
( Rp. )
7
825.00
35,200.00
3,520.00
495.00
40,040.00
45,000.00
393.75
45,393.75
0
85,433.75
12,815.06
98,248.81
JUMLAH
( Rp. )
7
4,455.00
7,920.00
792.00
2,673.00
15,840.00
18,232.50
5,317.81
23,550.31
JUMLAH
( Rp. )
7
4,455.00
7,920.00
792.00
2,673.00
15,840.00
25,245.00
7,363.13
32,608.13
0
48,448.13
7,267.22
55,715.34
JUMLAH
( Rp. )
7
8,910.00
15,840.00
1,584.00
495.00
26,829.00
70,125.00
20,453.13
90,578.13
0
117,407.13
17,611.07
135,018.19
11,137.50
19,800.00
2,024.00
693.00
33,654.50
98,175.00
28,634.38
126,809.38
0
160,463.88
24,069.58
184,533.46
JUMLAH
( Rp. )
7
11,137.50
19,800.00
2,024.00
693.00
33,654.50
157,080.00
45,815.00
202,895.00
0
236,549.50
35,482.43
272,031.93
JUMLAH
11,137.50
19,800.00
2,024.00
693.00
33,654.50
218,790.00
63,813.75
282,603.75
0
316,258.25
47,438.74
363,696.99
JUMLAH
( Rp. )
7
2,970.00
5,280.00
528.00
198.00
8,976.00
8,400.00
2,450.00
10,850.00
0
19,826.00
2,973.90
22,799.90
JUMLAH
( Rp. )
7
9,600.00
2,800.00
12,400.00
0
21,376.00
3,206.40
24,582.40
JUMLAH
( Rp. )
7
2,970.00
5,280.00
528.00
198.00
8,976.00
12,000.00
3,500.00
15,500.00
0
24,476.00
3,671.40
28,147.40
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
4,455.00
7,920.00
792.00
297.00
13,464.00
22,500.00
6,562.50
29,062.50
0
42,526.50
6,378.98
48,905.48
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
0
-
-
-
JUMLAH
( Rp. )
7
-
-
-
-
-
-
-
-
-
-
-
A. PEKERJAAN PONDASI
1. Galian Tanah Pondasi
P x L x t
100 x 0.53 x 1 = 53 m3
3. Astamping t = 20cm
t x L x P(galian pondasi)
0.15 x 0.53 x 100 = 7.95 m3
D. PEKERJAAN BETON
1. Sloof beton bertulang uk. 30x40cm
Panjang Sloof = Panjang galian
= 53 m2
Luas penampang sloof
0.3 x 0.4 = 0.12 m
Volume sloof
53 x 0.12 = 6.36 m3
Pembesian
kebutuhan Tul.Pokok D 12 koef. 1.04
53 x 4 = 212 m 18 lonjor
= 220.48 m
Begisting Sloof
P x t x 2
53 x 0.4 x 2
= 42.4 m2
Pembesian
Kebutuhan Tulangan Pokok D 12 koef. 1.04
26 x 1.57 x 4 = 163.28 m
= 169.8112 kg
Kebutuhan beugel Ø10cm koef. 0.62
panjang beugel = 109 m
jumlah beugel = 272.133333 buah 229.3312
= 273 buah
kebutuhan tulangan = 2479.75 lonjor
= 2480 lonjor = 96 m 59.52
begisting kolom
L x T x 4
0.3 x 1.57 x 4
= 1.884 m2 x jumlah kolom
= 48.984 m2
E. PEKERJAAN PASANGAN DINDING
DIK : L +2NPM
0.5 + Npm
0.53
0.53
m3
m3
129
109
0.07
total
kg
kg
PEMERINTAH KOTA TARAKAN
DINAS PEKERJAAN UMUM DAN TATA RUANG
T A R A K A N - KALIMANTAN UTARA
ENGINEERING ESTIMATE
(EEE
- E)
ENGINEERING
( EE )ESTIMATE
( EE )ESTIMATE
ENGINEERING
( EE )
KEGIATAN
#REF!
PAKET KEGIATAN
#REF!
LOKASI
KOTA TARAKAN
SUMBER DANA
APBD KOTA TARAKAN
TAHUN ANGGARAN
2014
3.194047927
DAFTAR HARGA SATUAN DASAR
( BASIC PRICE )
BAHAN BANGUNAN, UPAH DAN PERALATAN
JENIS
No. BAHAN, UPAH, SEWA ALAT DAN SATUAN HARGA SATUAN KETERANGAN
PERALATAN LABORATORIUM ( Tidak termasuk Ppn 10 %)
(1) (2) (3) (4) (5)
I UPAH
1 Pekerja Hari 81,000 11,571.43
2 Tukang Hari 88,000 12,571.43
3 Mandor Hari 99,000 14,142.86
4 Kepala Tukang Hari 88,000 12,571.43
II BAHAN
1 Pasir Pasangan M3 100,000 62.50
2 Pasir Urug M3 80,000
3 Agregat Kasar/batu pecah M3 455,000 337
4 Semen (50kg) Zak 75,000 1,500
5 Semen Putih / Zak 110,000 2,200
6 Besi beton polos Kg 13,000
7 Kawat Ikat / Kg 20,000
8 Paku Biasa / Kg 18,000
9 Tegel keramik ( 30 x 30 ) / M2 90,000 8,182
10 Lem Kg 34,000
14 Cat Air Paragon / Kg 20,000
15 Cat Air Metrolite / Kg 35,000
16 Dempul / plamir / Kg 50,000
17 Minyak Begesting Ltr 4,000
18 Batu Bata / Bh 1,050
19 Air Bersih Ltr 45
20 Kayu Perancah / M3 2,800,000
21 Kayu Kapur / Bengkirai / Lembasung / M3 3,500,000
22 Kaca Polos T. 5 mm / M2 120,000
23 Kunci Tanam Union / Bh 225,000
24 Engsel Kupu-kupu 4" / Psg 40,000
25 Engsel Kupu-kupu 3" / Psg 35,000
26 Hak Angin / Bh 30,000
27 Sealant Tube 30,000
28 Pipa Galvanis 1/2 " / Btg 84,150
29 Pipa Galvanis 3/4 " / Btg 60,775
30 Pipa Galvanis 1 " / Btg 84,150
31 Pipa Galvanis 1,5 " / Btg 233,750
32 Pipa Galvanis 2 " / Btg 327,250
33 Pipa Galvanis 3 " / Btg 523,600
34 Pipa Galvanis 4 " / Btg 729,300
TAR HARGA SATUAN DASAR
( BASIC PRICE )
NGUNAN, UPAH DAN PERALATAN
KETERANGAN
(5)
Per Jam
Per Jam
Per Jam
Per Jam
Kg
Per Kg
Per Kg
Per Kg
/Bh
BACKUP PEMBESIAN
FOOT PLATE
dimensi (m)
tinggi (m)
lebar panjang vol/POER koef u/ 1 m3 beton vol
Beton cor
a b c
0.80 0.80 0.25 0.16 6.25 1.00
Koef Panjang Jarak Jumlah Total
Jenis Tulangan Ø/D tul tul Pjg
(m)
a b c d e=c/d h=f+g
Pembesian
Melintang Ø 10 0.616 1.86 0.10 9 bh 16.74
Memanjang Ø 8 0.394 1.86 0.10 9 bh 16.74
Berat/1 poer
Berat /m3 beton
Jumlah Poor Plat Beton cor 1.60
Luas = 0.80 m2 10
Pembesian 169.07
Bekisting
Bekisting 8.00
Luas /1 poer 0.80
Luas /1 m3 beton 5.00
Kolom 15/15
dimensi (m)
tinggi (m)
lebar tinggi vol
beton cor a b c=1/(axb)
0.15 0.15 38.00 0.86
DIMENSION (m)
a b Luas
Jumlah sisi
panjang lebar
Bekisting
a b n c=a*b*n
38.00 0.15 4
Luas /1 m3 beton 22.80
Sloof 15/20
dimensi (m)
panjang (m)
lebar tinggi vol
beton cor a b c=1/(axb)
0.15 0.20 19.60 0.59
DIMENSION (m)
a b
Jumlah sisi Luas
lebar tinggi
Bekisting
a b n c=a*b*n
19.60 0.20 2
Luas /1 m3 beton 7.84
lantai rabat Pembesian Lantai rabat Ø 8 mm Pas Dinding Batu Bata, Camp 1 : 4
3.80 1. Besi Pembagi vol.jendela 0.9
2.80 Lebar 3.80 m vol.pintu 1.98
1.06 Ø 8 mm 0.394 Kg vol.ventilasi 0.135
Jarak 0.15 m 1 Pas Dinding 1/2 Batu Bata, Camp 1 : 2
belakang
#REF! Panjang 2.80 m' lebar 3
Jumlah (Panja 19.67 Btg tinggi 3.8
Lebar x Bera 29.44 Kg vol 10.365 m2
2. Besi memanjang
Panjang 2.8 m samping
Ø 8 mm 0.394 Kg lebar 4
Jarak 0.15 m tinggi 3.8
Lebar 3.80 m' vol 15.2 m2
Jumlah (Lebar 26.33 Btg x2
Panjang x Be 29.05 Kg 30.4 -
Volume Total 58.50 Kg vol 25.765 m2
depan
lebar 3
tinggi 3.8
vol 11.4 m2
8.52
vol 8.52 m2
teras keliling
6.55
1
6.55
Begesting
lebar 18.00
tinggi 0.49
jmlh sisi 2
17.527784
Total
Pjg Vol. Besi (Kg)
(m)
h=f+g i=b*e*h
16.74 10.31
16.74 6.60
16.91
105.67
0.80
Total Pjg
Vol. Besi (Kg)
(m)
103.85 40.92
134.55
Luas
c=a*b*n
22.80
Total Pjg
Vol. Besi (Kg)
(m)
66.66 26.26
74.56
Luas
c=a*b*n
7.84
1.8
4.815
2.7
2.88
4125
#REF!
4.70 m
0.394 Kg
0.15 m
0.50 m'
4.33 Btg
8.02 Kg
0.5 m
0.394 Kg
0.15 m
4.70 m'
32.33 Btg
6.37 Kg
14.39 Kg
Pemasangan Bouwplank Urugan Tanah
Panjang 4 Panjang 3.8
Lebar 3 Lebar 2.8
vol 14.00 m2 Tebal 0.100
vol 1.06 m3
Ringbalk 15/20
dimensi (m)
panjang (m)
lebar tinggi vol
beton cor a b c=1/(axb)
0.15 0.20 19.60 0.59
DIMENSION (m)
a b
Jumlah sisi
lebar tinggi
Bekisting
a b n
19.60 0.20 2
Luas /1 m3 beton
4.15
4.15
3.15
3.15
1.5
1.5
1
1
19.6
lantai keramik
Panj 1.4
Leba 1.9
2.66
5.32
6.559
13.118 21.798
Rangka Atap I
Balok Nok 5/10 Tiang Penyangga 5/10
#REF! P= 2.5 P= 1.6
L= 0.05 L= 0.05
T= 0.1 T= 0.1
V= 0.0125 M3 V= 0.016 M3
Luas
c=a*b*n
7.84
7.84
0.7
1.05
1.95
1.25
4.95
BILL OF QUANTITY
jumlah kolom
berat besi dia 10" m/kg
total berat lajur
begel total panjang kolom
jarak antar begel
jumlah begel yang di gunakan
panjang u/ 1 buah begel
berat besi dia 10" m/kg
total berat begel
Volume total pembesian kolom
Kusen P3 Penampang
Panjang
Jumlah
Volume Total
Kusen V1 Penampang
Panjang
Jumlah
Volume Total
Total Volume Kuzen
0.60 m'
1.00 m'
75 m'
45.00 m³
3.000 m'
0.050 m'
75 m'
11.250 m³
3.000 m'
0.200 m'
75.000 m'
45.000 m³
0.60 m²
0.25 m²
0.60 m'
0.26 m³
75.00 m'
19.13 m³
45 m³
11 m³
45 m³
19.13 m³
(30.38) m³
0.03 m²
75 m'
2.25 m³
Volume
4
75 m'
300 m'
0.888 kg
266.40 kg
75 m'
0.150 m'
500 bh
0.638 m'
0.617 kg
196.82 kg
463.22 kg
0.023 m²
3 m'
21 ttk
1.418 m³
3 m'
12 m'
21 ttk
0.617 kg
155.48 kg
63 m'
0.15 m'
420 bh
0.528 m'
0.617 kg
136.83 kg
292.31 kg
0.023 m²
75 m1
1.688 m3
75 m'
300 m'
0.617 kg
185.10 kg
75 m'
0.150 m'
500 bh
0.528 m'
0.395 kg
104.28 kg
289.38 kg
93.54 m'
0.05 m'
4.677 m³
Volume
4
0.014 m²
38.390 m'
0.553 m³
0.007 m²
6.700 m'
0.048 m³
0.005 m²
7.360 m'
0.037 m³
0.007 m²
38.390 m'
0.276 m³
0.005 m²
171.040 m'
0.855 m³
0.004 m'
49.420 m'
0.198 m³
129.790 m²
129.790 m²
57.22 m'
57.22 m'
Volume
4
0.10 m'
62.200 m'
3.5 m'
217.70 m²
37.770 m²
17.99 m³
217.70 m²
2.000 Ss
435.40 m²
0.005 m²
5.340 m'
1.000 bh
0.027 m³
0.005 m²
2.340 m'
2.000 bh
0.023 m³
0.005 m²
1.640 m'
1.000 bh
0.008 m³
0.005 m²
0.930 m'
1.000 bh
0.005 m³
0.063 m³
0.063 m³
90.08 m²
0.050 m'
4.50 m³
90.08 m²
0.05 m'
4.50 m³
90.08 m²
3.46 m²
435.400 m³
435.400 m³
Volume
4
0.004 m'
49.420 m'
0.198 m²
0.198 m²
0.004 m'
49.420 m'
0.198 m²
0.005 m'
37.960 m'
0.190 m²
KEGIATAN :
PAKET KEGIATAN :
LOKASI :
TAHUN ANGGARAN :
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN
Rp.
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bouwplank 14.00 m' #REF!
2 Foto Dokumentasi 1.00 Ls 100,000
3 Papan Nama Proyek ( Digital Printing Image ) 1.00 Ls 150,000
TOTAL JUMLAH I
II PEKERJAAN TANAH
1 Galian Tanah 1.60 m3 #REF!
2 Urugan Pasir Bawah Foot Plate 0.64 m3 #REF!
3 Urugan Tanah 1.06 m3 #REF!
4 Urugan Pasir Peninggi Lantai 1.06 m3 #REF!
TOTAL JUMLAH II
III PEKERJAAN BETON
1 Cor Lantai Rabat, t = 8 cm K-175
- Cor Beton 1.06 M3 #REF!
- Pembesian 58.50 Kg #REF!
2 Foot Plate 50 x 50 x 20 cm
- Cor Beton 1.60 M3 #REF!
- Pembesian 169.07 Kg #REF!
- Begesting 8.00 M2 #REF!
3 Sloof 15/20
- Cor Beton 0.59 M3 #REF!
- Pembesian 74.56 Kg #REF!
- Begesting 7.84 M2 #REF!
4 Kolom 15/15
- Cor Beton 0.86 M3 #REF!
- Pembesian 134.55 Kg #REF!
- Begesting 22.80 M2 #REF!
5 Ringbalk 15/20
- Cor Beton 0.59 M3 #REF!
- Pembesian 74.56 Kg #REF!
- Begesting 7.84 M2 #REF!
TOTAL JUMLAH III
IV PEKERJAAN ATAP
1 Pekerjaan Rangka Atap
Gording 5/7 0.16 M3 #REF!
Balok Nok 5/10 0.03 M3 #REF!
Penutup atap Seng BJLS 29.45 M2 #REF!
2 Pekerjaan Rangka Kuda Kuda
Tiang Kuda-kuda 5/10 0.02 M3 #REF!
Balok Tarik 10/10 0.13 M3 #REF!
Balok Gapit 2bh 5/10 0.06 M3 #REF!
Balok Sokong 5/10 0.04 M3 #REF!
Tiang Pengangga 5/10 0.02 M3 #REF!
Kaki Kuda kuda 5/10 0.07 M3 #REF!
3 Pekerjaan Plafond
Rangka plafond kayu 5/7 25.50 M2 #REF!
Penutup plafon triplek 4 mm 25.50 M2 #REF!
List plafon kayu 29.45 M2 #REF!
TOTAL JUMLAH IV
V Pekerjaan Sanitasi Air
Klosed jongkok 0.50 M3 #REF!
Pipa PVC Ø 2'' pembuangan 4.50 M #REF!
Floor drain 1.00 bh #REF!
Septictank dan resapan 1.00 Unit #REF!
TOTAL JUMLAH IV
VI PEKERJAAN PASANGAN
1 Pas Dinding 1/2 Batu Bata, Camp 1 : 2 51.20 M2 #REF!
2 Plesteran Dinding Camp 1 : 3 102.40 M2 #REF!
TOTAL JUMLAH V
VII PEKERJAAN KUSEN
1 Pembuatan Dan Pemasangan Kusen Pintu, Kusen Jendela dan 0.20 M3 #REF!
2 Pembuatan dan Pemasangan Daun Pintu Panel 1.31 M2 #REF!
3 Pemasangan Daun Jendela 2.66 M2 #REF!
TOTAL JUMLAH VI
VIII PEKERJAAN LANTAI
1 Pemasangan Keramik 30/30, Setara Roman 17.60 M2 #REF!
TOTAL JUMLAH VII
IX PEKERJAAN PENGANTUNG & PENGUNCI
1 Pemasangan kunci tanam biasa 1.00 Unit #REF!
2 Pemasangan engsel pintu ukuran 4" 3.00 Bh #REF!
3 Pemasangan engsel jendela kupu-kupu ukuran 3" 8.00 Bh #REF!
4 Pemasangan kait angin 8.00 Bh #REF!
5 Pemasangan kaca polos tebal 5 mm 1.50 M2 #REF!
TOTAL JUMLAH VIII
X PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
1 Pemasangan Titik Lampu, Saklar Ex Nasional 2.00 Ttk 150,000
2 Pemasangan Lampu Philips SL 18 Watt, Ex Nasional 2.00 bh 45,000
TOTAL JUMLAH IX
XI PEKERJAAN PENGECATAN
1 Pengecatan Dinding, Ex Metrolite 102.40 m2 #REF!
TOTAL JUMLAH X
TOTAL JUMLAH ( I s/d XI)
PPN(10%)
TOTAL
WAKTU PELAKSANAAN 30 HARI KALENDER Reliasasi Bobot Per Hari
Reliasasi Kumulatif Bobot Per Ha
JADWAL PELAKSANAAN
JUMLAH HARGA
Bobot (%)
Rp.
6 7
#REF! #REF!
100,000.00 #REF!
150,000.00 #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
300,000.00 #REF!
90,000.00 #REF!
390,000.00 #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! Rencana
#REF! Kom. Renc
sasi Bobot Per Hari
Kumulatif Bobot Per Hari